Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Online Tenant Request System Reliable and accurate, the IMPAK online tenant request system significantly reduces telephone time and paperwork.
Accel Computerized Maintenance Management System.
Software change management
Configuration management
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
AFISS Prospectus of Services AFISS offers HACCP food safety and food quality systems development and management services including preparation for regulatory.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
Maintenance and Engineering Procedures and Tools at Soreq Applied Research Accelerator Facility I. Gertz, Y. Buzaglo, A. Grin, R. Michael, R. Raizman,
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
This chapter is extracted from Sommerville’s slides. Text book chapter
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.
Computers & Employment By Andrew Attard and Stephen Calleja.
MP5 migration: D7i – P. Martel & B. Vercoutter – TS Workshop Archamps – May 25 th 2005 – EDMS Agenda New Functionalities and Possibilities Underused.
Creating a common understanding on Adverse events information requirements CCC-TI Isabelle Laugier Nov 2 nd 2012.
CERN IT Department CH-1211 Genève 23 Switzerland t Service Management GLM 15 November 2010 Mats Moller IT-DI-SM.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Configuration Management (CM)
Creator: ACSession No: 16 Slide No: 1Reviewer: SS CSE300Advanced Software EngineeringFebruary 2006 (Software Quality) Configuration Management CSE300 Advanced.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Developing Policy and Procedure Management System إعداد برنامج سياسات وإجراءات العمل 8 Safar February 2007 HERA GENERAL HOSPITAL.
Capital Asset Management May 14, 2008 Today’s Presenters: Anna Jensen, Director of Auxiliary Accounting, Capital Asset Management, Accounts Receivable,
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
JIRA usage in the DAQ An overview.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
An overview of current & future functionality David Widegren TS/ASE/EPS 23 February 2008EDMS:
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
Safety Commission databases support TS/CSE 1 EDMS TS Workshop 2005 SAFETY COMMISSION DATABASE SUPPORT Presented at the TS Workshop 24 th May 2005 S. Petit,
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site May 5 th 2014 Handling Engineering Group2 Service.
Microsoft Dynamics ® NAV 2009 Service Management.
1 Chapter 12 Configuration management This chapter is extracted from Sommerville’s slides. Text book chapter 29 1.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
13th May 2004Uwe Epting - TS/CSE-CO1 TS-CSE Outline –TCR and TS-CSE-CO mandate –Applications –Console layout –Hardware and Operating System –Strategy –Conclusion.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Roberto Saban TS HC Review bis Outline  Interviews of all the Group Leaders loosely or tightly concerned by hardware commissioning proposing them.
V-Shaped Software Development Life Cycle Model. Introduction: Variation of water fall model. Same sequence structure as water fall model. Strong emphasis.
TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Support for Technical Infrastructure operations P. Sollander, AB/OP/TI.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
C. Mugnier, D. Lafarge, C. Perolini, R. Pilon, J. Ruiz-Cabezas
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
SPS availability K. Cornelis Acknowledgments : A. Rey and J. Fleuret.
Progress Project Tracking for EGEE Kasia Pokorska, CERN IT-AIS-PM
LHC intervention scheduling with the Work Acceptance Tool
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Performance monitoring framework for the technical infrastructure
Reliability Analysis & Infor EAM
The MTF adjusted system to meet Vacuum Group needs
Managing infrastructure faults to minimize accelerator down time
CLINICAL INFORMATION SYSTEM
Orange ASP Training Module
Infor EAM in the Handling Engineering Group at CERN
Case management as logbook for the cryogenic installations at CERN
Configuration management
Onsite Training at JLab
Presentation transcript:

Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander, AB/OP

January ATC-ABOC Days2 Outline Introduction to TI operation Alarm integration CAMMS at CERN Intervention workflow Follow-up of interventions Statistical analysis of interventions Strong and weak points of our system Extended use

January ATC-ABOC Days3 Technical Infrastructure operation TI,  24*365 operation from the CCC Monitoring Electricity, cooling, ventilation, safety, access control, heavy handling, control systems, vacuum, cryogenics, … Corrective maintenance Perform first-line interventions (when possible) Prepare and dispatch work orders to maintenance teams Help users to follow up requests Statistics and general follow up of maintenance activity Tools Laser Alarm screens Electrical Network Supervisor (ENS) Technical Infrastructure Monitoring (TIM) Computer Assisted Maintenance Management System DataStream 7i

January ATC-ABOC Days4 Workflow for on-site interventions Work order 8240 (2006) TI first-line 323 (2006) 1120 (2004) Alarms ~10 5 Telephone calls ~25000 (2006) Contractor & CERN interventions CAMMS, D7i

January ATC-ABOC Days5 Alarms Main source of events Alarms and alarm system must be correct, complete and reliable Quality assurance by procedure

January ATC-ABOC Days6 Alarm integration procedure Integration request Equipment owner Check, complete TI operators Load data TS/CSE Available on Laser AB/CO FF,FM,FC, description Maintenance object DAQ details Cause, consequence, actions Alarms tested TI + requestor Alarms in service TS/CSE Every alarm checked, understood and accepted by OP

January ATC-ABOC Days7 Help Alarm data

January ATC-ABOC Days8 CAMMS / Datastream7i Used at CERN since ~20 years Maintenance management Corrective, Preventive TS groups LHC cryo (being implemented) ~350’000 maintenance objects Manufacturing LHC project ~500’000 objects

January ATC-ABOC Days9 D7i entities Objects identifier e.g. SFDEI Maintenance responsible (MRC) Structured in Systems, locations and equipment Links to information such as procedures, spare parts,.. Work orders = Ordres de Maintenance = ODM Concern specific objects and MRCs Have state “launched”  accepted  finished Comments inserted along with state changes Prepared by TI operators on events!

January ATC-ABOC Days10 Preparing requests with D7i OR

January ATC-ABOC Days11 Preparing requests from Alarms Request created automatically from alarm or logbook Object, MRC, title pre-filled Operator completes if necessary and sends

January ATC-ABOC Days12 Simplified Workflow Request created (L) Accepted (RA) Work report (T) Store management Terminated (TP) Problem description, code Object concerned, Department Location, Priority Requestor Comments Maintenance technician Start, end time, date Number of hours spent Spare parts used Verification Intervention

January ATC-ABOC Days13 Follow-up of work orders What is the state of the request…? What was done last time for this problem? Are there requests pending acceptance? …

January ATC-ABOC Days14 Follow-up with in-house tools

January ATC-ABOC Days15 Statistics (with TS/CSE web tools)

January ATC-ABOC Days16 Some of the Benefits of these tools For TI operation State of repair request known History of problems available Past problems and solutions at hand Facility to extract statistics For equipment groups State of installations relate to number of WO Track maintenance work, delays, repeated repairs, cost, … Preventive maintenance For all Commercial tool with long history at CERN used by staff and contractors Service provided by TS/CSE

January ATC-ABOC Days17 Strengths and weaknesses  No better than its data  Equipment-MRC relation not always correct in database  Constant effort to keep data entry high quality  Native Oracle Forms – JInitiator – InternetExplorer  Sometimes slow and sensitive to network perturbations  Native forms not always optimised for TI use, but…  Oracle database  open tool  Laser integration  Create work orders from logbook  Web based tools from TS/CSE for free!

January ATC-ABOC Days18 Extended use? Further integration with HelpAlarm and TI tools LHC cryo will use D7i for maintenance IT/CS interested for network equipment TS/CSE offers a service Available to help setting up a maintenance database for new clients AB should benefit

January ATC-ABOC Days19 Questions?