NAVSEA ePMA PROJECT E NAVSEA ePMA PROJECT Electronic Portable Maintenance Assistant Web-enabled application designed to replace clipboards and paper procedures.

Slides:



Advertisements
Similar presentations
E-Child Care Time and Attendance Tracking System December 17, 2010 Department of Human Services, Division of Family Development 1.
Advertisements

PMS FBR Process PMS FeedBack Report (FBR) submission is one of the following methods: SKED Feedback Report Wizard PMS Web Site (
Sustainability Implementing Sustainable Practices for Productivity Enhancement for Productivity Enhancement Presented by Ryte Byte, Inc.
Presentation by Priyanka Sawarkar
1.Quality-“a characteristic or attribute of something.” As an attribute of an item, quality refers to measurable characteristics— things we are able to.
Steve Schwabe Woolpert Project Manager
3M & Navy Supply System Emphasize that particular aspects of the 3-M system may vary between communities, coasts, commands, etc.
Types of Computers & Computer Hardware Computer Technology.
NAVAL REACTORS PROGRAM TMDE Status
Toll Management System. Tolling System Architecture.
Design Team #3 Work Order Tool with Voice Recognition Hai Bui Harry Himawan Chris Phillips.
Bar|Scan ® Asset Inventory System The leader in asset and inventory management.
Electronic Thesis And Dissertation Database Errors Luke Schmader Ryan Mestre Client: Zhiwu Xie CS4624 5/6/2014.
Conducting Inspections / Audits with Intrinsically Safe Mobile Devices.
Chapter 8 Storage of Business Records Copyright © 2011, 2006 Mosby, Inc., an affiliate of Elsevier. All rights reserved.
Data Management Solutions
Front Page …..is an Asset Management tool designed to record and aid the analysis of activities affecting Production capability and costs. …..promotes.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
NDIA Conference:10/22/2003:Page 1 UNCLASSIFIED Copyright © 2003 Raytheon Company All rights reserved Space and Airborne Systems Electronic Warfare Systems.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
College Fair Automation by TRC College Fair Automation by TRC is pleased to offer the only barcode/scanner solution specifically designed for the College.
Business Computing 550 Lesson 1. Fundamentals of Information Systems, Fifth Edition An Introduction to Information Systems in Organizations.
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
Asset & Security Management Chapter 9. IT Asset Management (ITAM) Is the process of tracking information about technology assets through the entire asset.
CS3100 Software Project Management Week 26 - Quality Dr Tracy Hall.
1. QualityControl QualityManagement Before even today Standard: CSA Z Examples Petrobrás Dow Química Beginning: October 1992 ISO 9001 BVQI.
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
Equipment Module Usage Tracking, Repairs & Maintenance.
Presented by: Don Lehner NAVSEA TMDE Program Fleet Review May 2009 CNSL Consolidated TMDE Readiness Assessment (CTRA)
The Dark Side of Document Imaging: ‘The Hidden Cost of Capture’
Sandra Basgall Monitoring & Evaluation Regional Technical Advisor CARO Using Barcodes for EFFICIENT Beneficiary and Vendor IDENTIFICATION: Central African.
Ultriva User’s Conference 2012 Business Unit configuration Presented by Nandu Gopalun.
Affordable Computerized Maintenance Management Solutions (CMMS) Gabi Miles Hach Company May 22, 2009.
NorthWise Services Patient Diaries – Electronic or Paper ? By Dr. Philip M. North ACRP Meeting, Budapest Friday 6 th June 2003 NorthWise Services.
Lectured by Mr. Ry Ron,MBA Chapter 2 Using Technology to Manage Your Work.
Next Generation ISEA Roadmap
SWIS Digital Inspections Project Chris Allen, Information Management Branch California Integrated Waste Management Board August 22, 2008.
Naval Special Warfare Command UNCLASSIFIEDUNCLASSIFIED 1 NSW Portable Radio Test Set (PRTS) Mr. Matthew J. Moncayo Tactical Radio Programs and Plans 06.
Topic: Sir Naseem Ahmed Khan Dow Vocational & Technical Training Centre.
1 Introduction to Computers M. Luqkman Qader Ruandzy.
2.00 Understand Computer Fundamentals. Unit Objective: 2.02.
Introduction to Computers in General By: Dr. Emelda Ntinglet-Davis Oracle DBA Class.
Mastering Inspections in WebTMA Jenny Pino TMA Systems.
Chapter 6 Requirements for a Maintenance Program.
Proven systems for managing asset integrity & reliability by implementing effective Ex maintenance and inspection strategies Streamlining the ATEX inspection.
IMPROVED ASSET UTILIZATION Lack of visibility of assets and devices results in low equipment utilization rates, excess equipment purchasing and sometimes.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
THEME: EMPOWERING FACILITY MANAGEMENT AND HEALTHCARE TECHNOLOGY IN KENYA TOPIC:MEDICAL EQUIPMENT MANAGEMENT DATE’13/11/2013 BY MILLICENT ALOOH.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
BY AMAR P. NARKHEDE MAINTENANCE PLANNING. PLANNED PROGRAMME FOR MAINTENANCE Phase I 1. Prepare a list of all machines and equipments to be covered and.
Student Environment Task Tools The SETT Approach
eSPL Innovative Management Technology
Corporate Presentation
Invoicing: Enter a PO-Based Invoice
Validation of Maintenance Requirement Card
Student Environment Task Tools The SETT Approach
Standard Business Processes
2.00 Understand Computer Fundamentals.
Module 8 Introduction to Validation
SQA Role during Software Requirements Phase
Quicken Technical Support Number (Call) ( ) Any Time (24*7) You can call us on Quicken Technical Support Number: Quicken Technical Support.
Innovia Consulting Customer Conference 2018
Project Update - Accomplishments March 28, 2018
Division of Air AirCom DARM’s New Compliance and Enforcement Database and Field Inspection Tool.
Anna Brinck, M.S. Student Robert Cuzner, Assistant Professor
GROUP MEMBERS 1.MUHAMMAD RAZA 2.IMRAN ASHRAF 3.ADIL
02.00 Understand Computer Fundamentals.
Assistive Technology: What Every Parent Needs to Know
Standard Business Processes
Presentation transcript:

NAVSEA ePMA PROJECT E NAVSEA ePMA PROJECT Electronic Portable Maintenance Assistant Web-enabled application designed to replace clipboards and paper procedures or forms to provide Sailors greater access to information at the point of work and the ability to quickly and accurately record, track, and collect ship’s preventative and corrective maintenance on a device that fits in their pocket. Bridging the “Longest Yard—Ship’s LAN to Point of Work”

ePMA Functionality Produces MRC Completion Reports MRC Completion Reports New Work Candidates (4790/2K) validated for upload to OMMS-NG New Work Candidates (4790/2K) validated for upload to OMMS-NG New Configuration Change Reports (4790/CK) New Configuration Change Reports (4790/CK) PMS Technical Feed Back Reports (TFBR) PMS Technical Feed Back Reports (TFBR) CSMP Close-outs CSMP Close-outs Parts Ordering Capability Parts Ordering Capability Output in XML Output in XML Provides Maintenance Requirement Cards (MRC) Maintenance Requirement Cards (MRC) Work Center’s Equip-ment Configuration (SCLSIS) Data Work Center’s Equip-ment Configuration (SCLSIS) Data Work Center’s Equipment Part Data Work Center’s Equipment Part Data Work Center’s Active CSMP Items Work Center’s Active CSMP Items NAVOSH Manual NAVOSH Manual Tech Rep on the Disk (TROD) Tech Rep on the Disk (TROD) Zone Inspections Zone Inspections Interface to OMMS-NG and SKED Interface to OMMS-NG and SKED

ePMA