DZero Run IIb PMG December 10, 2002 1 Agenda Run IIb D-Zero PMG December 10, 2002  ESAAB news (Lab, Project, DOE)  Project status, overview (Kotcher)

Slides:



Advertisements
Similar presentations
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Advertisements

Project What is a project A temporary endeavor undertaken to create a unique product, service or result.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
DZero RunIIb Director’s Review February 3, Run IIb Project Status Vivian O’Dell.
FRA’s Earned Value Management System Corrective Action Plan Implementation January12, 2010 Dean Hoffer and Mike Rhoades.
September 16, 2002 ID Groups Physics Coordinator B. Klima Software and Computing A. Boehnlein, J. Qian Physics Groups Spokesmen G. Blazey J. Womersley.
US CMS Silicon Tracker – PAC Meeting – FNAL - Nov 3, Incandela 1 US CMS Tracker Outer Barrel (TOB) Silicon Project Joe Incandela Fermilab Level.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
FRA’s Earned Value Management System Overview for Self Assessment Surveillance March 07-09, 2011 Dean Hoffer Head, Office of Project Management Oversight.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
U.S. ATLAS Physics and Computing Budget and Schedule Review John Huth Harvard University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven.
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
From Research Prototype to Production
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Lab-Wide Earned Value Management System Project Core Team Meeting October 01, 2008 Dean A. Hoffer/Elaine McCluskey.
7/26/2006 Wyatt Merritt 1 DECam Preparations for Critical Decision 2/3a Preparations for CD2 Preparations for CD3a DECam MOUs.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Montgomery County, Maryland DTS CMMI Approach & Implementation Mike Knuppel 03/20/2006.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Project Management Methodology Giorgio Musso Physics Department SOSMCE 2013 Summer School Genoa, Italy.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 1 Workshop  Workshop is to “Move beyond the Technical Design Proposal”  Many.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
HFT face-2-face F.Videbaek Brookhaven National Lab.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
PIP PMG Project Controls Elmie Evans-Peoples PIP PMG Oct 25, 2012.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
DZero RunIIb PMG June 7, Run IIb Project Status Vivian O’Dell.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
DZero Run IIb PMG February 25, Run IIb DZero PMG  Status overview, issues (Kotcher)  Schedule, project status (Freeman)  AOB Jon Kotcher Fermilab.
DZero Run IIb PMG January 28, Agenda Run IIb D-Zero PMG January 28, 2003  Overview, issues (Kotcher)  Project status (O’Dell)  Trigger technical.
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
FNAL PMG Feb 5, DØ RunIIb Trigger Upgrade WBS 1.2 Paul Padley, Rice University for the DØ Trigger Upgrade Group.
V. O’Dell, D0 RunIIb PMG 4-Feb Dzero Run IIb PMG  Agenda u Overview & Management News: V. O’Dell u Trigger Upgrade Status:P. Padley u Silicon closeout.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau for the.
1 EIR Nov 4-8, 2002 DAQ and Online WBS 1.3 S. Fuess, Fermilab P. Slattery, U. of Rochester.
Grants and Contracts Jim Butterfield and Kathy Blackwood October 5, 2004.
DZero Run IIb Rev Nov 05 ‘03 1 Kotcher Agenda (from Rebaselining Review)  Introduction (Kotcher – 10’)  Trigger & DAQ/Online (Wood – 30’) u AFE II/TriP.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
February 3, 2005DZero Run IIb Director's Review1 Standing Committee on Upgrade Installation to Physics Commissioning  Charge: u Convened by spokespersons.
Silicon Mtg July 24th, Eckhard von Toerne, KSU RunIIb Silicon Database Eckhard von Toerne Kansas State U. July 24 th, 2003.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
0 Software Quality Assurance Implementation Plan Briefing to the Board June 20, 2003.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
V. O’Dell, L0 Workshop 25-Sep Run 2b Layer 0 Workshop u Layer 0 proposal from project Management perspective s History/News s Schedule.
Director’s Review July 15, Installation and Technical Commissioning of D0 RunIIb L0 Silicon and Trigger Upgrades Schedule & Costs R.P. Smith for.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
Run IIb Database Status Eckhard von Toerne, June 12 th, 2003 RunIIb database decision: to use use ATLAS database design and to modify it to D-Zero needs.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
OVERVIEW PRE AWARD From idea generation to study design Proposal development and support Proposal submission POST AWARD Account establishment Monitoring.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Presentation transcript:

DZero Run IIb PMG December 10, Agenda Run IIb D-Zero PMG December 10, 2002  ESAAB news (Lab, Project, DOE)  Project status, overview (Kotcher)  Schedule status (O’Dell)  Silicon technical status (Demarteau)  Managing to an aggressive schedule (Freeman)  AOB Jon Kotcher DZero Run IIb PMG December 10, 2002

DZero Run IIb PMG December 10, Run IIb Project Organization D0 Run IIb Project J. Kotcher, Project Manager R. Partridge, Deputy; V. O’Dell, Associate; W. Freeman, Assistant M. Johnson, Technical Coordinator C. Yoshikawa, Budget Officer; T. Erickson, Administration WBS 1.1 Silicon M. Demarteau A. Bean, Deputy Sensors R. Demina, F. Lehner Readout System A. Nomerotski, E. von Toerne QA, Testing, & Burn-in C. Gerber 1.1.3, Mechanics & Assembly W. Cooper, K. Krempetz Monitoring M. Corcoran, S. de Jong Production J. Fast, H. Haggerty Software & Simulation F. Rizatdinova, L Shabalina WBS 1.2 Trigger H. Evans D. Wood L1 Track Trigger M. Narain L1 Cal Upgrade M. Abolins, (H. Evans), P. LeDu L2  Upgrade R. Hirosky Silicon Track Trigger U. Heintz WBS 1.3 DAQ/Online S. Fuess P. Slattery L1 Cal/Track Match K. Johns Simulation M. Hildreth, E. Perez WBS 1.5 Installation R. Smith Silicon Installation Mechanical: H. Lubatti Electronics: L. Bagby, R. Sidwell Trigger Installation D. Edmunds WBS 1.4 Project Administration Administration (D. Wood) Administration (M. Demarteau) Control Systems F. Bartlett, G. Savage, V. Sirotenko Level 3 Systems D. Chapin, G. Watts DAQ/Online Management (P. Slattery) Network & Host Systems J. Fitzmaurice, S. Krzywdzinski Red: Today’s speakers Blue: added Eckhard von Toerne (KSU) Black: subtracted H. Haggerty & Rick Hance (early retirement)

DZero Run IIb PMG December 10, Overview of Status  Developing project-wide tools, procedures for project reporting and execution  Not waiting for approval to do this u Schedule “statussing”, bringing results back to project, anticipating project needs u Effort reporting, tracking labor $ u Production Readiness Reviews u Configuration control of drawings u Monthly reports u Continued preparation of COBRA, using actuals u Maintaining specifications u Labor needs u Posting/availability of monthly schedule updates for project u MoUs u Technical progress u etc…+ integrating Lehman guidance, EIR + aftermath, PMCS, ESAAB preparation, etc.  Work aggressively underway, anticipating equipment spending in January

DZero Run IIb PMG December 10, FY03 Equipment Purchases over $100k ItemCost (FY02 k$) Production Start Date L2-L5 Sensors1,45303/13/03 L2-L5 Digital Jumper Cables26304/03/03 L0 Sensors16104/14/03 L1 Sensors15504/14/03 Analog Cables16707/03/03 SVX4 Production Chips47507/11/03 L2-L5 Production Hybrids38209/04/03 Costs do not include contingency, G&A, or escalation. Labor not included. All FY03 procurements over $100k in silicon subproject only. All scheduled FY03 equipment purchases over $100k through Sep ’03

DZero Run IIb PMG December 10, Summary of All FY03 Needs on Equipment Funds Funding TypeFY03 Q01 FY03 Q02 FY03 Q03 FY03 Q04 TOTAL M&S LABOR TOTAL Costs are in FY03 k$. Contingency, G&A, & escalation included. Reflects all project-wide FY03 equipment needs.

DZero Run IIb PMG December 10, Effort Reporting  Accurate tracking of labor a new phenomenon, a major effort to understand how best to deal with it  DZero approach: limit sub-categories technical personnel will assign effort to u Assigning work to full suite of packages will likely be intractable, will have to be checked anyway  WBS assignments made by sub-project managers prior to submission to PPD  Currently eight silicon sub-categories: u SVX4 chip – D0-SVX4 u Sensor probing, testing – D0-Sens u Silicon readout electronics – D0-RO u Layers 0/1 design/integration/prototyping – D0-L01-Prod u Layers 2-5 design/integration/prototyping – D0-L25-Prod u Layers 0/1 assembly – D0-L01-Assem u Stave production and outer barrel assembly – D0-Staves u Silicon integration and operational infrastructure – D0-Infr  No FNAL labor on trigger sub-project yet  Memo from PM will go out to divisions next week

DZero Run IIb PMG December 10, Labor Cost Extracted from Schedule vs. Actuals (R&D) Actuals: Oct = $168.5k, Nov = $132.8k (FY03 k$) No contingency or G&A in schedule prediction, holidays make prediction awkward Agreement quite good, but earned value is real measure: how much work was performed (O’Dell)? Actuals in FY02 k$ Scheduled labor in FY02 k$

DZero Run IIb PMG December 10, Two Labor Requests  Full-time electronics technician for silicon u Debug electronics components, hybrids s Knowledge of logic analyzer, oscilloscope, etc. u Commissioning and maintenance of existing testing, burn-in stands s Requires residence at SiDet u Knowledge of EXCEL/VB programming useful u No anticipated need for board design skills u Can begin now, needed for lifetime of project (4 years) u Tech spec or senior tech  Request that Jim Fast report his effort as physicist u Role, work most closely analogous to physicist’s u Assists on all fronts: mechanical, electrical, supervisory u Much of what he does for DZero was budgeted in schedule as scientist

DZero Run IIb PMG December 10, Near-Term Signatures Required  Final draft of Project Management Plan now complete u Integrates EIR findings requiring QA/QC & Configuration Management Plans  Two signed copies of Technical Design Report  Signatures required: Cooper, Montgomery, Witherell (Philp – PMP only)  Both documents here today, available for perusal  Signature deadline: December 17 (ESAAB)