Engineering Operations Outage Status: Tile cleaning is complete Tentatively planning on 2 LITER operation. Design Review upcoming Shielding of HHFW/in-vessel.

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
1 ICD10 Project Status January 31, Current Timelines and Status - ICD10 Detailed Project Planning is progressing Key internal project milestones.
XP 1157 Increasing the CHI start-up current magnitude in NSTX B.A. Nelson et al. 1.
MIS 2000 Class 20 System Development Process Updated 2014.
© 2008 RightNow Technologies, Inc. Title Best Practices for Maintaining Your RightNow Knowledge Base Penni Kolpin Knowledge Engineer.
Hillyard – Vektr CQI ™ Continuous Quality Improvement Hillyard Inc. has partnered with Nuvek LLC, to gain hosting capabilities for a new and innovative.
Engineering Operations Outage Status: Post-run diagnostic calibrations have been completed and in-vessel work can start on PCHERS, FIDA, MPTS, and the.
August NSTX-U Team Meeting. Engineering Operations August 15, 2014 NSTX-U In-Vessel installations and calibrations have concluded, and activities have.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Chapter 2 Topics –Context-Level DFD –Entity-Relationship Diagrams.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Project Management and Scheduling
Project Life Cycle Introduction and Overview © Ed Green Penn State University All Rights Reserved.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
1 Software Engineering Muhammad Fahad Khan Software Engineering Muhammad Fahad Khan University Of Engineering.
January 8, 2009 TAC Texas Nodal Program Implementation: P rogram Update Ron Hinsley.
Software Development Life Cycle Decisions Project Management Disciplines Stacey Shearn September 8, 2005.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
MyFloridaMarketPlace Roundtable January 21, :00 a.m. – 12:00 p.m. MyFloridaMarketPlace.
Prof. Roy Levow Session 8.  Steps in Closing a Project  Getting Client Acceptance  Installing Project Deliverables  Documenting the Project  Post-Implementation.
Chapter 3: Project Management Omar Meqdadi SE 2730 Lecture 3 Department of Computer Science and Software Engineering University of Wisconsin-Platteville.
Project management Lecture 10. Topics covered Management activities Project planning Project scheduling Risk management.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
February NSTX-U Team Meeting. Engineering Operations Feb. 11, 2014 NSTX-U In-Vessel installations and Calibrations to conclude in late March (3/28/2014)
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Engineering Operations OH water leak: Water leak is located ~ 4.5” into the upper OH lead. Leak 2 o’clock Cooling hole in. dia.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
1 NSTX Upgrade Progress Report May 7 th, 2013 Ron Strykowsky, Erik Perry, Tim Stevenson, Larry Dudek, Steve Langish, Tom Egebo, Mike Williams and the NSTXU.
April NSTX-U Team Meeting. Engineering Operations April 25, 2014 NSTX-U In-Vessel installations and Calibrations to conclude in mid-June to shift activities.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Engineering Operations FY08 Outage: In-Vessel Work: –BSE Vacuum Vessel Interfaces Completed –Liquid Lithium Divertor Tray trial fit-ups –HHFW Antennas.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
UNMJobs Forum: Top 10 System Changes & Future Developments.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
Professional Learning Communities Board Update February 2012.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Project Management. Introduction  Project management process goes alongside the system development process Process management process made up of three.
AHCCCS Update Meeting – Systems Update November 2015.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
Hussein Alhashimi. “If you can’t measure it, you can’t manage it” Tom DeMarco,
Striving for Excellence on NSTX Run Assessment Meeting R. J. Hawryluk July 28, 2006.
Engineering Operations Outage Schedule Center Stack casing is scheduled to go back in the vessel today Complete NB armor, Diagnostic calibrations, clean/photo/close,
NSTX-U Run Planning Guidance for 2015 NSTX-U Research Forum 1 FY2015 (and 2016) research milestones will guide prioritization of eXperimental Proposal.
FY10 Ops Preparations: Extended vessel bake (to 3 weeks) Additional Physics Operators Spare LITER probes/fill systems fabricated & new staff Run day status/plans.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
Development and Assessment of “X-point limiter” Plasmas M. Bell, R. Maingi, K-C. Lee Coping with both steady-state and transient (ELM) heat loads is a.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Masa Ono February 5, 2016 NSTX-U Team Meeting.
Engineering Operations Outage Schedule The vessel & beamline are under vacuum. 1st Bake-out complete. Air leaks found and fixed. The OH coil will be installed.
NSTX SAS – GMS Mtg. 12/1/04 S. A. Sabbagh and J. E. Menard NSTX RWM Active Feedback System Implementation Plan Discussion NSTX Global Mode Stabilization.
Engineering Operations TF Commissioning Mechanical testing of TF flag/box assemblies complete, inner bundle installed, and all joints made up. Joint resistance.
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
Scheduling Gas Maintenance & Construction Resources AGA Workshop – Resource Management & Work Forecasting Artie Georgacopoulos Director - Resource Planning.
Project management Lecture 9
Financial Information System
Xoserve IX Refresh Customer Update 03/01/2019.
COR1000 Telecoms Project UK Link Committee Update
Presentation transcript:

Engineering Operations Outage Status: Tile cleaning is complete Tentatively planning on 2 LITER operation. Design Review upcoming Shielding of HHFW/in-vessel components in progress OH bus lead upgrades to reduce error fields The NBI group will replace all three ion sources and the TIV this outage New bake-out system controls for NB conditioning during the vessel bake Multi-stage firing controls will be added to the CHI Cap Bank Diagnostic ground (Class 2) upgrade and add’l class 4 power circuits. In-vessel measurements for a liquid Lithium Divertor next year Materials shipped to ASIPP to fabricate the new OH coil

Engineering Operations Outage Schedule: In-vessel construction activities will continue until mid-October before starting ~ 1 month of diagnostic calibrations for the upcoming run. The NB duct will be re-installed on November 20th for a late November pump-down and leak check. Twelve days of bake-out will be performed in early December. NB ion source conditioning will go on in parallel with the bake. Cooldown, leak checking, and add’l time for diagnostic calibrations will follow with plans to start the ISTP in the early part of January. Plasma operations is expected in the second half of January. An early start this year will give us the add’l time needed next year to install the new OH coil, and possibly to implement a liquid lithium divertor.

NSTX Run Assessment Program Coordination: To help in the performance of XP’s, it was suggested that a Physics Operator be involved in the design of an XP, and that the details of shot development are addressed in the proposal. Writers of XP’s should be encouraged to utilize “canned” shots, and to provide a path forward based on the ability to achieve certain conditions during shot development. Session leaders need some mechanism to better understand the current status of diagnostic availability. A suggestion was made to have a publication assessment to help evaluate XP’s (and run time allocation) based on publications, including Engineering-Technical. The appointment of an Executive Committee for the Research Forum was suggested to help track run time allocations from year-to-year, and make sure that some proposals do not get repeatedly passed over. A mid-run assessment should be performed to look at run time allocation, and we need to consider allocating time to interesting XP’s with scientific risk that are not in direct support of a declared milestone. Consider whether the ET structure should be task or topical oriented.

NSTX Run Assessment Collaborations: Training expiration notices/status should be sent to employees and collaborators. Strive to make training materials including tests more accessible for visitors. In the area of communications, need to be notified regarding any work that may impact their equipment. Consider adding notifications on Work Permits. The NSTX web Page needs an update. An XP should be available on the website by day it is run, and a Calendar/Schedule should be maintained and include machine/diagnostic status and run plans. Also, feedback from management on collaborator involvement would be appreciated.

NSTX Run Assessment Run Staffing/Equipment: Critical diagnostics have minimal staffing (MPTS, CHERS, etc) and need backup support (Consider a Post-Doc). A three week run/one week maintenance is helpful for many, and five straight weeks of run is a hardship. The idea of a four day run week was suggested. Regarding equipment, the need for additional DC current feedback devices for our power systems was brought up, as well as the need to address the humidity problems in the MPTS polychromator/Laser rooms and the D-Site gallery. The cleaning of the lower divertor tiles was suggested, and the request was made to further review the amount of water and oxygen introduced during the bakeout and operations of LITER. A suggestion was also made that cleaning of the lower divertor tiles could be accomplished by producing a high injector current CHI discharge, without pulling the CHI plasma up into the vessel. Also suggested were modifications to the CHI system to select/stagger the firing of the cap bank segments, and the powering of the CHI absorber coils via the SPA supplies.