HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.

Slides:



Advertisements
Similar presentations
Dec/02/04 Su DongCaltech Trigger/DAQ/Online workshop1 Level 1 Trigger: Introduction L1 trigger objects and strategy Implementation features L1 composition.
Advertisements

Benji Lewis APS April Meeting Hadron Blind Detector implementation during PHENIX Run-10 Benji Lewis On behalf of the PHENIX Collaboration.
1 HBD Update Itzhak Tserruya DC meeting, April 9, 2008 April 9, 2008.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 2 – Manuel Proissl HBD Meeting 06/23/2009.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
Dealing with central events in Run 10 Au+Au collisions Mihael Makek Weizmann Institute of Science HBD Meeting, 2/6/2010.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
STAR Collaboration Meeting, Nantes, July2002 SVT Analysis/Status Update Jun Takahashi – University of Sao Paulo.
HBD Operation in Run 9 Thomas K Hemmick for the HBD Crew.
1 HBD HV Commissioning Itzhak Tserruya, HBD meeting, February 27, 2006.
HBD Meeting 3/14/06 B. Azmoun BNL Testing and Preparation of HBD Full Scale Prototype for Upcoming Engineering Run Puzzling Behavior of GEM’s To Do List.
9/18/2015I. Ravinovich1 HBD performance in Run-9 I. Ravinovich WIS.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Cube Measurements Tent Crew. Scintillation BNL 241 Am Semi- collimated  Spectralon Diffuse UV Reflector SBD  -Trigger Scint. Light Poisson.
Current Status of Hadron Analysis Introduction Hadron PID by PHENIX-TOF  Current status of charged hadron PID  CGL and track projection point on TOF.
Preliminary Results from a Trial Beam Test of the Small HBD Prototype at LEGS Bob Azmoun BNL HBD Working Group Meeting May 10, 2005.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 1 – Manuel Proissl HBD Meeting 06/16/2009.
Non-identified Two Particle Correlations from Run I Understanding drift chamber tracking – Tracker and candidatory – Two particle efficiencies/ghosts A.
HBD Performance Estimates Zvi Citron 3 April 2008 HL Meeting.
Calibration of the ZEUS calorimeter for electrons Alex Tapper Imperial College, London for the ZEUS Collaboration Workshop on Energy Calibration of the.
1 HBD HV Status Update Jason for the HBD crew Jan 30, 2007.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL, April 11, 2007.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
1 HBD Update Itzhak Tserruya DC meetingJune 10, 2009 June 10, 2009.
1 Th.Naumann, DESY Zeuthen, HERMES Tracking meeting, Tracking with the Silicon Detectors Th.Naumann H1 DESY Zeuthen A short collection of experiences.
12/12/09 MPGD 神戸大学 1 Yusuke Komatsu A B. Azmoun B, C. Woody B, K. Ozawa A University of Tokyo A,Brook Haven National Lab. B.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
1 HBD Towards Run-9 Itzhak Tserruya H/L meeting, April 3, 2008 April 3, 2008.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Thursday, December 17, 2015 Sky D. Rolnick UC Riverside 1 Baseline study for Chiral Symmetry Restoration using the Hadron Blind Detector in the PHENIX.
HBD CDR Gas System and Monitoring Craig Woody BNL DC Upgrades/EC Meeting March 9, 2005.
Optimization of  exclusion cut for the  + and  (1520) analysis Takashi Nakano Based on Draft version of Technical Note 42.
FTPC status and results Summary of last data taken AuAu and dAu calibration : Data Quality Physic results with AuAu data –Spectra –Flow Physic results.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
HBD Status Report C. Woody For the HBD Crew DC Meeting June 13, 2007.
TPC/HBD R&D at BNL Craig Woody BNL Mini Workshop on PHENIX Upgrade Plans August 6, 2002.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
2/18/2016I. Ravinovich1 HBD Run-10 data analysis I. Ravinovich WIS.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors C. Woody B.Azmuon 1, A Caccavano 1, Z.Citron 2, M.Durham 2, T.Hemmick 2, J.Kamin.
Tracking Issues in the Central Region Craig Woody BNL DC Upgrade Meeting August 11, 2002.
Régis Lefèvre (LPC Clermont-Ferrand - France)ATLAS Physics Workshop - Lund - September 2001 In situ jet energy calibration General considerations The different.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Measurements of low mass e + e - pairs in p+p and Au+Au collisions with the HBD upgrade of the PHENIX detector Mihael Makek Weizmann Institute of Science.
Study of Charged Hadrons in Au-Au Collisions at with the PHENIX Time Expansion Chamber Dmitri Kotchetkov for the PHENIX Collaboration Department of Physics,
Initial Performance of the PHENIX Hadron Blind Detector at RHIC Craig Woody Brookhaven National Lab For the PHENIX Collaboration N IEEE Nuclear.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
BEACH 04J. Piedra1 SiSA Tracking Silicon stand alone (SiSA) tracking optimization SiSA validation Matthew Herndon University of Wisconsin Joint Physics.
Electron and Photon HLT alley M. Witek K. Senderowska, A. Żurański.
1 Some updates on water and other items… Stony Brook HBD Crew…
Recent Gain Changes C.Woody HBD Meeting March 23, 2010.
6/29/2016I. Ravinovich1 HBD status in Run-10 I. Ravinovich WIS.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
Yonsei University Combinatorial pair background in the e + e - mass spectra in p+p collisions at √s = 14TeV Yonsei Univ. M. G. Song, D. H. Lee, B. K. Kim,
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
Converted photons efficiency
Presentation transcript:

HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009

C.Woody, DC Meeting, 7/8/092 West detector (last one built using new fast method) –Behaved very well throughout the entire run –Only one shorted strip in WN1. Compensated for with a resistor change and the rest of the detector is working fine. 0.2% loss in acceptance –Not a single trip throughout the entire run ! East detector (first one built using old method) –Lost one module (ES1) early on due to a HV problem. Not recoverable without opening the detector. However, this module is out of the acceptance –5 other modules with various types of shorts ES2 – one short, stable since 3/4 ES3 – one short on 3/4, developed second short on 6/4 EN4 – 5-6 shorts; one or two have been varying and causing some gain instability EN5 – one short, stable since 3/12 EN2 – one short, appeared yesterday 7/7 –Total loss in acceptance – 4.5% –Also not a single real trip (due to the detector) throughout the entire run ! HBD Performance in Run 9 Overall, these problems, while annoying, have been largely overcome, and both halves of the detector have taken data successfully throughout the entire 200 and 500 GeV runs

C.Woody, DC Meeting, 7/8/093 Gain Stability West East

C.Woody, DC Meeting, 7/8/094 Correction for P/T Variation T1 T2 T3 CONFIG CHANGE APPLY HV CHANGE shown above IR ACCE SS GAS MIXING HOUSE PROBLE M RUNS PROCESSED: ES3 WN5

C.Woody, DC Meeting, 7/8/095 Quad Trips Main problem during the 200 GeV run was with so-called “Quad Trips” –Typically EN1, EN2, EN3, EN4 would trip by a “virtual trip” –Virtual trip is caused when the current drawn through one of the divider chains exceeds its expected value by ~ 1% (~ 1  a out of 130  a) –Designed to detect increase in leakage current across a GEM indicating a new short is developing –However, these Quad Trips were proven not to be due to the GEMs or the detector itself –Caused by a noise problem in the LeCroy 1471N HV module picked up by the trip protect circuit, causing the relay board to trip 4 channels in a group –Definitely “environmental dependent”, in that we could not reproduce this in the lab, and was very intermittent. Could occur few times a week, or, recently, was so frequent that we could not keep the HV on –Finally swapped with a spare 1471N (which had other problems… we don’t really have a working spare…). Initially, the problem persisted, but then went away.. –We hope the final solution to this problem will be to replace the problematic module/slot/location with a properly working spare during the shutdown

C.Woody, DC Meeting, 7/8/096 Analysis Status – 200 GeV Run Single vs Double Electron Separation 482 runs analyzed : 2.7B ERT Events (1.5B after ± 20 cm vertex cut)  3B total 0.75B MB Events (0.31B after ± 20 cm vertex cut)  1.5B total I.Ravinovich

C.Woody, DC Meeting, 7/8/097 Electron Efficiency I.Ravinovich Use the low mass region where the number of the conversions is relatively small and where the combinatorial background is negligible (0.025 < m < GeV). Count the number of reconstructed pairs in this mass window in the Central Arms. Then match them to the HBD and count. Ratio is a measure of the HBD pair efficiency with respect to Central Arms. With limited statistics, HBD single electron track efficiency is ~90%. More exact numbers will be derived from higher statistics from the remainder of the 200 GeV data.

C.Woody, DC Meeting, 7/8/098 Hadron MIP response  Field configuration Reverse bias mode Reconstructed hadron tracks in Central Arms projected to HBD. Charge from dE/dx in the small (~ 100  m) region above the top GEM and in the first transfer gap is very small compared to the Cherenkov signal from electrons I.Ravinovich

C.Woody, DC Meeting, 7/8/099 Background from supports I.Ravinovich Electrons in Central Arms without matching cluster in HBD Spreader bars ? Upper I-Beam ? SS gas lines ? Inefficiency due to ERT trigger

C.Woody, DC Meeting, 7/8/0910 HBD Support structure Spreader bars Remove during running ? Cable Trays, Cables, I-Beam supports (FR4) SS gas lines

C.Woody, DC Meeting, 7/8/0911 Temperature Rise in the Gas Mixing House Gas temperature inside detector did not increase ! Temperature in GHM  +100  F O 2 levels remain constant

C.Woody, DC Meeting, 7/8/0912 H 2 O Levels in HBD Gas Have Risen ~ Factor 2 ! 5/13/09 6/29/09 Note rise in INPUT

C.Woody, DC Meeting, 7/8/0913 Presently we do not plan on removing HBD East for a rebuild at Stony Brook. The final decision will depend on whether we feel EN3 and EN4 are useable in the data analysis. Study is still ongoing and the final decision will be made by the end of July. Keep both detectors under dry argon flow inside the IR Request that cooling be added to the scrubber or heat exchanger for the HBD gas for next run in order that water levels can be kept to desired levels Recommend removing spreader bars used in the HBD support to reduce the background in Central Arms. Look into possible ways of reducing mass of upper cable tray and support Shutdown Plans

C.Woody, DC Meeting, 7/8/0914 Backup Slides