Trigger Group of the Institute for High Energy Physics, Vienna presented by Claudia-Elisabeth Wulz CPT Week, Plenary Session CERN, 18 April 2002 GLOBAL.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

Efficiency of the L1 Trigger for SUSY Study performed by L. Boldizsár, P. Hidas KFKI Budapest J. Erö, M. Fierro, A. Jeitler, N. Neumeister, P. Porth, H.

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
ALICE Trigger System Features Overall layout Central Trigger Processor Local Trigger Unit Software Current status On behalf of ALICE collaboration:D. Evans,
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
LKr readout: present and future R. Fantechi 30/8/2012.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
DT Track Finder, Global Muon Trigger, Global Trigger H. Bergauer, L. Boldizsar, M. Dallavalle, Ch. Deldicque, J. Erö, L. Guiducci, A. Jeitler, I. Jimenez.
Technical Part Laura Sartori. - System Overview - Hardware Configuration : description of the main tasks - L2 Decision CPU: algorithm timing analysis.
On-line Software Requirements for the Global Trigger, the Global Muon Trigger and the Barrel Muon Trigger Track Finder Claudia-Elisabeth Wulz & HEPHY Vienna.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Global Trigger H. Bergauer, L. Boldizsár, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J.
G.Corti, P.Robbe LHCb Software Week - 19 June 2009 FSR in Gauss: Generator’s statistics - What type of object is going in the FSR ? - How are the objects.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep Global Trigger Global.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
PESAsim – the e/  analysis framework Validation of the framework First look at a trigger menu combining several signatures Short-term plans Mark Sutton.
CMS Week Mumbai, Dec Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menus.
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
Global Trigger, Global Muon Trigger H. Bergauer, L. Boldizsar, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer,
Hardware: Software:
SLHC Meeting CERN, 21 May 2008 Presented by C.-E. Wulz Global Triggers,  TCA Technology M. Stettler, M. Hansen (CERN) C. Foudas, G. Iles (Imperial College)
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
L1 Global Muon Trigger Simulation Status URL of this presentation:
Global Trigger, Global Muon Trigger H. Bergauer, Ch. Deldicque, J. Erö, A. Jeitler, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
20 October 2005 LCG Generator Services monthly meeting, CERN Validation of GENSER & News on GENSER Alexander Toropin LCG Generator Services monthly meeting.
CMM++ activities at MSU Y. Ermoline et al. Level-1 Calorimeter Trigger Joint Meeting, CERN, 13 – 17 September 2010.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Sridhara Dasu115 April 2002 L1CaloTrigger Algorithms Sridhara Dasu University of Wisconsin Algorithms: Details, Updates and Simulation - 2 x cm -2.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
Global Trigger Upgrades for SLHC
ATLAS calorimeter and topological trigger upgrades for Phase 1
Production Firmware - status Components TOTFED - status
HCAL Data Concentrator Production Status
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
Status of CMS and the Austrian Contribution to the Trigger System
Commissioning of the ALICE-PHOS trigger
Global Trigger and Global Muon Trigger
Global Muon Trigger Update
Presentation transcript:

Trigger Group of the Institute for High Energy Physics, Vienna presented by Claudia-Elisabeth Wulz CPT Week, Plenary Session CERN, 18 April 2002 GLOBAL TRIGGER

CPT Week, April 2002 Claudia-Elisabeth Wulz2 Board Layout of the Global Trigger Processor PSB (Pipeline Synchronizing Buffer)Input synchronization (7 boards including GMT) GTL (Global Trigger Logic) Logic calculation (1-2 boards) FDL (Final Decision Logic) L1A decision (1 board) TCS (Trigger Control System Module)Trigger Control (1 board) NEW: L1A (Level-1 Accept Module)Delivery of L1A (1 board) TIM (Timing Board)Timing (1 board) GTFE (Global Trigger Frontend) Readout (1 board)

CPT Week, April 2002 Claudia-Elisabeth Wulz3 Old layout of Global Trigger 9U Crate

CPT Week, April 2002 Claudia-Elisabeth Wulz4 New layout of Global Trigger 9U Crate

CPT Week, April 2002 Claudia-Elisabeth Wulz5 Main Global Trigger Rack

CPT Week, April 2002 Claudia-Elisabeth Wulz6 Global Trigger Milestones 2002  Milestone March 2002: System Test -> Delayed to Oct This includes the backplane, the PSB-6U, GTL-6U, FDL-9U and TIM-6U. The GTFE and the GMT are not included.  Milestone July 2002: TCS-6U tested -> Delayed to Oct  Milestone Oct. 2002: Backplane-9U tested -> OK

CPT Week, April 2002 Claudia-Elisabeth Wulz7 Backplane-6U, PSB-6U 4Backplane-6U: Prototype available 80 MHz GTL-plus signals, Channel Links 2mm connectors, 160 pin VME connectors Power Supplies: +5V, +3.3V, +2.5V, +1.8V 4PSB-6U: available. Channel Link receivers used. 1 Sync Chip for 2 channels. Monitoring of all input bits for every BX Synchronisation checks for every BX

CPT Week, April 2002 Claudia-Elisabeth Wulz8 PSB-9U Memories inside FPGA for Readout: 3-5 bx read by a L1A

CPT Week, April 2002 Claudia-Elisabeth Wulz9 GTL-6U Automatic chip design and setup procedure developed. Layout for a 20 channel GTL (4 , 4 isol. e/ , 4 central jets, 4 fwd jets,  E T, E T miss, 8 jet multiplicities; other quadruplets can be connected alternatively for tests) is currently being finished pin Altera FPGA 20k400E not yet included. The layout of a conversion board to be used later in final 9U-crate is ready. It contains also memories in FPGA’s to send simulated test data to the GTL-6U board. A decision on a possible redefinition of jet input groups has been taken. It was decided to keep the present best 4 central jets, 4 forward jets and 4  -jets and jet multiplicities for different E T thresholds. A new quantity H T giving the transverse energy sum of all good jets above threshold has been added. The exact definition of how to calculate the jet multiplicities (  -range) still has to be taken at the level of the calorimeter trigger. More than 8 values could be necessary.

CPT Week, April 2002 Claudia-Elisabeth Wulz10 GTL-9U New: H T

CPT Week, April 2002 Claudia-Elisabeth Wulz11 GTL-6U Prototype Schematics Design simplified, board available by Oct. 2002

CPT Week, April 2002 Claudia-Elisabeth Wulz12 FDL-9U Schematic and chip design in progress. Board available by Oct Monitoring of all algorithm and L1A bits Prescaling of all algorithms Trigger Mask 8 L1A’s in parallel for partition modes Input of up to 64 technical trigger bits from PSB possible

CPT Week, April 2002 Claudia-Elisabeth Wulz13 TIM-6U TIM-6U: The board contains a TTCrx chip and provides all timing signals for the GT crate. It will also be used in the Drift Tube Track Finder crates. An FPGA provides all necessary test functions to run the crate without the central TTC clock. It simulates also L1A requests for monitoring or to test the readout chain. The schematic design is finished. The layout is on hold until May 2002 due to TTCrx jitter problems. We would prefer to keep the TTCrx as a mezzanine board with interconnections identical to current board. The final Timing Board will be 6U (previously 9U).

CPT Week, April 2002 Claudia-Elisabeth Wulz14 TIM-6U

CPT Week, April 2002 Claudia-Elisabeth Wulz15 TCS-9U TCS-9U: The main functions are defined but the design is still open for additional requests (calibration logic etc.). The board is expected by Oct Trigger Partitions: The maximum number of subsystems is fixed (32). A preliminary agreement about the output to the DAQ Event Manager has been reached. The input format of Fast Signals is now fixed. 4 coded bits per subsystem, sent as LVDS parallel data, and RJ45 connectors are proposed. The TCS board provides data for the new ”CMS-TTCvi”. A L1A driver module to be used with the CMS-TTCvi has been conceived.

CPT Week, April 2002 Claudia-Elisabeth Wulz16 TCS-9U environment

CPT Week, April 2002 Claudia-Elisabeth Wulz17 Global Trigger Milestones beyond 2002  Milestone June 2003: Complete GT prototype available Integration tests possible from this date. GTFE-9U: Conceptual design of readout board done.  Milestone July 2004: 12-channel PSB-9U available PSB-9U: Conceptual design done. Will have memories inside FPGA’s.  Milestone Nov. 2004: Complete GT available Includes GTL-9U module with all input channels (4 , 4 isol. e/ , 4 non-isol. e/ , 12 jet channels, H T,  E T, E T miss, jet multiplicities). The Global Muon Trigger will have been completed by Nov

CPT Week, April 2002 Claudia-Elisabeth Wulz18 Global Trigger ORCA Simulation The L1 Global Trigger System is simulated by an ORCA package (starting from ORCA version 5) –Trigger/L1GlobalTrigger Hardware system features are simulated –…except Delta conditions (topological correlations among different classes of trigger objects) and new H T /jet counts Persistency of trigger objects is provided Official documentation is available on the usual ORCA Software description pages

CPT Week, April 2002 Claudia-Elisabeth Wulz19 Implementing an algorithm: syntax Each algorithm is made up of particle blocks of different kind: –MU, EL, IE, CJ, FJ, TJ, ET, EM, JN Each block is numbered to have a one-to-one connection with its own condition settings (up to 64 different blocks per particle can be set): –MU_00, EL_01, FJ_01, EM_63,... An algorithm is a combination of particle blocks, connected by.AND. ( & ),.OR. ( | ) conditions: MU_00&EM_00 | EL_00&EM_00

CPT Week, April 2002 Claudia-Elisabeth Wulz20 Implementing an algorithm: syntax User can provide algorithms in three different ways: –Use the default implemented algorithms –Write a file named trigger_menu.dat One algorithm per line Blank line allowed This overrides the default Trigger Menu algorithms –Add one algorithm to the default Via adding a line in the.orcarc file L1GlobalTrigger:Algorithm MU_00&EM_00|EL_00&EM_00

CPT Week, April 2002 Claudia-Elisabeth Wulz21 Implementing an algorithm: thresholds For each particle block, user must provide a list of conditions by the WriteThreshold utility It is an interactive tool that writes a file for each specified block Users are asked for which block they want to provide conditions and then they are asked to specify the conditions themselves User can modify conditions for the default implemented algorithms If WriteThreshold is not invoked for a certain block, the conditions for that specific block are set to the default values (now defaults are set to “don’t care” values)

CPT Week, April 2002 Claudia-Elisabeth Wulz22 L1GlobalTrigger output The output of L1GT is the Level 1 Trigger Accept word, a string of 128 bits. Each bit corresponds to the output of one algorithm. User can select whether to check the overall L1 accept “signal” or a specific algorithm bit

CPT Week, April 2002 Claudia-Elisabeth Wulz23 Persistency The information for each trigger object is saved per event, in form of BitArray –24 bit for each muon candidate typedef BitArray(24) MuonDataWord –32 bit for each calorimeter object (req. from L1Calo Group) Actually in the code only 21 bit words are used, following the hardware specifications typedef BitArray(21) CaloDataWord L1Accept word is saved as well BitArray(128)

CPT Week, April 2002 Claudia-Elisabeth Wulz24 Persistency User code can access the particle information via L1GlobalTrigger methods: –CaloDataWord getElectrons(int i) –MuonDataWord getMuons(int i) Methods are provided to ‘convert’ BitArray information into usual particle parameters (E T, p T, ,…) The L1GlobalTrigger code itself can run on the database, updating it according to whether the user modified particle conditions/algorithm definitions

CPT Week, April 2002 Claudia-Elisabeth Wulz25 L1 GT Efficiency Studies for some Physics Channels The samples for 4 channels have been: generated with PYTHIA (1000 events per channel) simulated with CMSIM121 Hit-formatted and digitized with ORCA_5_3_2 Pile-up for high luminosity has been added The samples have then been processed with L1GlobalTrigger The thresholds for calculation of efficiencies of individual algorithms are taken as for calculation of muon, calo and combined rates by M. Fierro and P. Chumney for 4 different DAQ scenarios: 75 kHz, 50 kHz, 37.5 kHz, 25 kHz.

CPT Week, April 2002 Claudia-Elisabeth Wulz26 Samples used for current analysis H250: H SM  WW  (leptonic decay) M H = 250 GeV/c 2 H SM  WW  jj (semileptonic decay) H800: H SM  WW  (leptonic decay) M H = 800 GeV/c 2 H SM  WW  jj (semileptonic decay) SUSY1:  + E t miss. + jets TTH150: +E t miss. + jets +  -jet

CPT Week, April 2002 Claudia-Elisabeth Wulz27 SUSY1  lepton + E T miss + jets Efficiencies are calculated for 4 different DAQ bandwidth scenarios: 75kHz, 50kHz, 37.5kHz, 25kHz 1. Algo single muon 27.48, 25.48, 22.87, Algo di-muon 12.34, 12.34, 13.24, Algo muon-ieg 13.54, 13.14, 11.63, Algo muon-tau-jet 24.77, 23.87, 21.36, Algo muon-any-jet 40.82, 38.62, 34.90, Algo muon-et_total 41.42, 39.21, 35.51, Algo muon-et_miss 40.12, 37.91, 34.30, Algo single ieg 12.84, 12.84, 12.84, Algo di-ieg 4.01, 4.01, 4.01, Algo single tau-jet 51.05, 51.05, 48.75, Algo di-tau-jet 20.86, 16.95, 18.45, Algo single jet 96.79, 96.79, 94.28, Algo double jet 89.67, 89.67, 84.95, Algo triple jet 66.50, 63.39, 63.39, Algo quad jet 50.35, 34.50, 34.50, Algo ieg-any jet 30.99, 19.26, 19.26, Algo ieg-tau jet 20.06, 13.24, 12.74, Algo et_miss 87.56, 87.56, 87.56, Algo ieg-et_miss 30.39, 15.04, 15.04, Algo any jet-et_miss 96.29, 93.18, 93.18, Algo et_total 83.75, 83.75, 83.75, Total efficiency: 99.8, 99.7, 99.4, 99.2%

CPT Week, April 2002 Claudia-Elisabeth Wulz28 +E Tmiss + jets +  -jet Efficiencies are calculated for 4 different DAQ bandwidth scenarios: 75kHz, 50kHz, 37.5kHz, 25kHz 1. Algo single muon26.9, 25.6, 22.9, Algo di-muon 6.8, 6.8, 7.4, Algo muon-ieg 12.7, 11.9, 10.9, Algo muon-tau-jet 19.7, 18.9, 17.8, Algo muon-any-jet 16.2, 15.4, 14.7, Algo muon-et_total 19.1, 18.0, 16.8, Algo muon-et_miss 21.9, 21.2, 20.2, Algo single ieg 21.6, 21.6, 21.6, Algo di-ieg 5.5, 5.5, 5.5, Algo single tau-jet 46.1, 46.1, 41.2, Algo di-tau-jet 17.2, 10.5, 12.5, Algo single jet 33.2, 33.2, 19.7, Algo double jet 17.4, 17.4, 9.9, Algo triple jet 8.6, 6.7, 6.7, Algo quad jet 7.6, 2.0, 2.0, Algo ieg-any jet 20.9, 16.3, 16.3, Algo ieg-tau jet 29.1, 23.1, 20.1, Algo et_miss 14.4, 14.4, 14.4, Algo ieg-et_miss 23.6, 15.1, 15.1, Algo any jet-et_miss 52.7, 27.3, 27.3, Algo et_total 3.0, 3.0, 3.0, 3.0 Total efficiency: 86.5, 79.9, 76.6, 70.8%

CPT Week, April 2002 Claudia-Elisabeth Wulz29 Sleptons   +  - + E T miss + no jets This channel has been generated and processed with ORCA_6_0_1 The efficiencies for best 3 algorithms for 4 different DAQ scenarios are: single muon 96.3%, 96.0%, 95.6%, 95.2% di-muon 74.0%, 74.0%, 74.8%, 74.0% muon-ETmiss 14.2%, 14.2%, 14.2%, 14.2% TOTAL EFFICIENCY  96.8%, 96.6%, 96.4%, 96.3% ±  ->  1 0 ± ~ ~

CPT Week, April 2002 Claudia-Elisabeth Wulz30 URL’s This talk may be found at: Other talks relevant to the Global Trigger presented during the April 2002 CPT week: (Trigger Meeting, A. Taurok) (Calibration Working Group, A. Taurok) General information about the Global Trigger and the Global Muon Trigger is available at:

CPT Week, April 2002 Claudia-Elisabeth Wulz31 Conclusions Progress in hardware design PSB-6U and backplane-6U ready Layout of GTL-6U in progress, conversion board for 9U crate ready Timing module designed, waiting for layout L1A Driver Board conceptual design ready FDL module and backplane-9U expected in October 2002 Design of TCS system updated, TCS module expected in Oct Crate and rack layout updated GT software incorporated in ORCA 6 Effiency studies performed for sample physics channels