LBT Q2 2008 Engineering/Software Review ROTRotators.

Slides:



Advertisements
Similar presentations
Principles of I/O Hardware I/O Devices Block devices, Character devices, Others Speed Device Controllers Separation of electronic from mechanical components.
Advertisements

Prescriptive Process models
06 April 2009 LBT Q Eng/SW Review LBT Q Eng/SW/Mtn Review OSS – Optical Support Structure Paul Grenz.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Cutting-edge technology for the development of business software applications Takes advantage of the most recent international trends, combining Microsoft.NET.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
NRC* Perspective on HDPE Road Maps Eric Focht, Materials Engineer U. S. Nuclear Regulatory Commission Office of Nuclear Regulatory Research Division of.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
Project Status Group B-4 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these.
Students:Gilad Goldman Lior Kamran Supervisor:Mony Orbach Mid-Semester Presentation Spring 2005 Network Sniffer.
Coordinate Based Tracking System
ALMA Real Time Control System Jeff Kern Ralph Marson, Thomas Juerges.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 Control Group Planning Rafael Hiriart, Control Group Lead.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
CSNB334 Advanced Operating Systems Course Introduction Lecturer: Abdul Rahim Ahmad.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
Lecture Introduction to Software Development SW Engg. Development Process Instructor :Muhammad Janas khan Thursday, September.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Real-Time Embedded Operating System for a SoC System Hsung-Pin Chang Department of Computer Science National Chung Hsing University.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
Scope Development Component Specification Concept Development Design, Mockup, Engineering Prototyping Production This project timeline template is customizable.
LBT Q Engineering Review MCSC Mount Control System.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Engineering Review SAB Static Balancing.
Stand Up Comedy Project/Product Management
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
System Maintenance Modifications or corrections made to an information system after it has been released to its customers Changing an information system.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
Together we can build something great FORWARD | 2016 Change Order Management in contractERP – Best Practices Brian Mills and Ken Smith.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
Experimental Software Engineering Course for Training Practitioners in Embedded Real-Time Systems Real-Time Systems LAB, School of Electronic Engineering,
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
CMS November Upgrade Week
Intro. To Operating Systems
Software Development Process
EOSCpilot All Hands Meeting 8 March 2018 Pisa
Chapter 13: I/O Systems.
Chapter 13: I/O Systems “The two main jobs of a computer are I/O and [CPU] processing. In many cases, the main job is I/O, and the [CPU] processing is.
Presentation transcript:

LBT Q Engineering/Software Review ROTRotators

21-Jul-2008LBT Q Engineering Review Highlights (Q2/2008) SX BG cable chain and DX rotator installed SX BG cable chain and DX rotator installed BG cable chain tested in lab BG cable chain tested in lab DG development, ISS out to bid DG development, ISS out to bid Mucho s/w and electronics functionality added Mucho s/w and electronics functionality added

21-Jul-2008LBT Q Engineering Review Open Issues Technical Technical BG: Numerous small details to attend to BG: Numerous small details to attend to DG: Must complete design DG: Must complete design DG: Cable chain scaling uncertain DG: Cable chain scaling uncertain Bittware/Jungo DSP driver still has issues, changing behavior at initialization on new releases. Bittware/Jungo DSP driver still has issues, changing behavior at initialization on new releases. Behavior with L/R FBG together unknown for overall system throughput. Behavior with L/R FBG together unknown for overall system throughput. Schedule Schedule BG: Commissioning will be revealing, no time to fix problems properly BG: Commissioning will be revealing, no time to fix problems properly DG: Schedule pushed to reduce cost DG: Schedule pushed to reduce cost

21-Jul-2008LBT Q Engineering Review Open Issues (cont.) Financial Financial Cable chain and DG components exceeding budget Cable chain and DG components exceeding budget Resource Resource Competition with other projects Competition with other projects Availability of telescope for commissioning Availability of telescope for commissioning

21-Jul-2008LBT Q Engineering Review Progress (Q2/2008) Complete BGR2 lab integration  Complete BGR2 lab integration  Complete BG cable chain design  Complete BG cable chain design  Complete BG cable chain integration  Complete BG cable chain integration  Install SX BG cable chain on telescope  Install SX BG cable chain on telescope  Complete DGR detailed mechanical design Complete DGR detailed mechanical design Start manufacture of large DGR structure Start manufacture of large DGR structure Order other DGR long lead items Order other DGR long lead items

21-Jul-2008LBT Q Engineering Review Progress (Q2/2008) “jet” kernel stability improved “jet” kernel stability improved Non-maskable interrupt crashes rare Non-maskable interrupt crashes rare FPGA DMA problem resolved, fixing AZ behavior and telemetry holes FPGA DMA problem resolved, fixing AZ behavior and telemetry holes Cable chain code added to rotator DSP code Cable chain code added to rotator DSP code Rotator->Linux interrupts now synchronous, eliminating hangs. Rotator->Linux interrupts now synchronous, eliminating hangs CANbus, ADC and DAC software operating CANbus, ADC and DAC software operating.

21-Jul-2008LBT Q Engineering Review Planning (Q3/2008) Commission SX BG rotator/cable chain Commission SX BG rotator/cable chain Address known issues Address known issues Complete DG rotator/cable chain design Complete DG rotator/cable chain design Start manufacture of large DGR structure Start manufacture of large DGR structure Order other DGR long lead items Order other DGR long lead items Build out electronics modules Build out electronics modules

21-Jul-2008LBT Q Engineering Review Planning (Q3/2008) (cont.) Test Cable Chain control on the telescope Test Cable Chain control on the telescope Finish adding events for rotators and Cable Chain Finish adding events for rotators and Cable Chain Add a Rotator control/status GUI to MCSGUI (Q4+) Add a Rotator control/status GUI to MCSGUI (Q4+) Test Cable Chain control on the telescope. Test Cable Chain control on the telescope. Finish full implementation of 8051 (LCD, serial console, refined CANbus timeouts) Finish full implementation of 8051 (LCD, serial console, refined CANbus timeouts) Upgrade “jet” to new Linux. Upgrade “jet” to new Linux.