Presented by: Presented By: MIL-STD 881 Update Neil F. Albert MCR, LLC 26 August 2010.

Slides:



Advertisements
Similar presentations
M EASURING P ERFORMANCE – N EW R EQUIREMENTS FOR D O D P ROJECTS AND P ROGRAMS IPMR I NTEGRATED P ROGRAM M ANAGEMENT R EPORT (IPMR) (DID) DI- MGMT-81466B.
Advertisements

Presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Neil F. Albert MCR, LLC 12 May 2010.
Policies and Procedures for Proper Use of Non-DoD Contracts Revised April 19, 2005 Deidre A. Lee Director, Defense Procurement and Acquisition Policy Office.
DCIPS Performance Evaluation Administrative Reconsideration Guidance
1 ANSI/EIA A STANDARD Earned Value Management Systems Proposed Changes Discussion January 31, 2007 NDIA Program Management Systems Committee.
BENEFITS OF SUCCESSFUL IT MODERNIZATION
CENTRAL CONTRACTOR REGISTRATION (CAGE CODES) DFARS Case 2003-D040 DFARS Parts 204, 212, 213 and 252 are amended to remove policy on Central Contractor.
Parts Management Reengineering TLCSM Executive Council Update Gregory Saunders, Director Defense Standardization Program Office 05 Oct 06.
Standard Financial Information Structure (SFIS) Overview Presented by: Ray Bombac Business Transformation Agency.
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding Virginia Concrete Conference Richmond, VA March 6, 2014.
FHWA Life Cycle Costs Analysis and Pavement Type Selection Guidance Maryland Concrete 2014 Conference March 18, 2014.
UID Discussion DAEC October 7, UID Status DoD’s policy issued July 29, 2003 Serious implementation questions exist based on draft DFARS rule.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems Work Breakdown Structures (WBS) Current: 14 January 2015.
OMB A-123 Update CRT April 20, 2015 Mike Wetklow
Configuration Management
The program work breakdown structure (WBS) establishes the essential
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Unclassified. Program Management Empowerment and Accountability Mr. David Ahern Director, Portfolio Systems Acquisition AT&L(A&T) 14 April 2009 The Acquisition.
1 Navy Center for Earned Value Management (CEVM) January 2007.
Configuration Management, Logistics, and Universal CM Issues Larry Bauer Boeing Commercial Airplanes NDIA Conference Miami March 4-5, 2005
1 Contractors on the Battlefield Mr. Gary Motsek Assistant Deputy Secretary of Defense (Program Support) November 12, 2009.
NDIA PMSC Scheduling Working Group. Exploratory working group Objective Objective Brainstorm and explore concerns and issues in scheduling bring them.
MIL-HDBK 881 Work Breakdown Structure Handbook Update
Presented by: Presented By: MIL-STD 881 Update Status Neil F. Albert MCR, LLC 21 May 2009.
1 NASA Earned Value Management Update August 2006.
Work breakdown structure
DoD Parts Management Reengineering Defense Standardization Program Office Industry Day, 8 May 2007 PMRWG Final Report.
1 Lecture 3.1: Project Planning: Work Breakdown Structure (WBS) [SEF Ch 9] Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Parts Standardization & Management Committee (PSMC) Meeting Oct 22, 2007 San Diego, CA Parts Management Reengineering Implementation Process Team (PMRIPT)
Mandatory Technical Standards Engineering Management Board Goddard Space Flight Center July 10, 2003 Updated October 7, 2003 HQ/Code AE R. Weinstein.
Revised Department of Defense Earned Value Management Policy Deborah A. Tomsic Senior Program Analyst Office of the Under Secretary of Defense (Acquisition,
OSD Earned Value Management Activities Update Larry L. Axtell Senior Program Analyst Office of the Under Secretary of Defense (Acquisition, Technology.
© MCR, LLC MCR Proprietary - Distribution Limited Earned Value Management Application, Guidance, and Education Neil F. Albert President/CEO MCR, LLC
1 Walt Cooper – OSD CAPE Jim York – Technomics August 27, 2009 Weapon System Sustainment: Collection of Contractor Costs.
OSD CAIG 1 Walt Cooper OSD Cost Analysis Improvement Group (CAIG) August 13, 2008 Weapon System Sustainment: Collection of Contractor Costs.
BCF-262 EVMS Validation and Surveillance. BCF-262 DAU Catalog Description EVMS Validation and Surveillance The earned value management system (EVMS) validation.
UN/CEFACT XML Schema Status and Data Exchange Requirement Guidelines Joan Ugljesa NDIA PMSC August 26, 2010.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Presented to: NDIA By: Keith Kratzert Date: August 16, 2006 Federal Aviation Administration Improving Program Performance at FAA.
0 Office of Performance Assessments and Root Cause Analyses (PARCA) PARCA EVM Update Presenter: Phone:
Office of Management & Budget Office of Federal Procurement Policy Breaking News May 2011.
UID Unique Identification DFARS
XML Working Group Joan Ugljesa NDIA PMSC August 7,
NASA Update NDIA PMSC Quarterly Meeting February 4, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis Team)
Government Furnished Property Policy Breakout
1 June 18, 2008 Cost Management with Data for Costing Mort Anvari Director, Acquisition Costing (SAFM-CEA) June 18, 2008 Cost Management Panel PRICE Customer.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
1 Felisha Hitt, Senior Procurement Analyst March 18, 2008 Defense Acquisition Regulations System
US Army Corps of Engineers BUILDING STRONG ® Mr. Daniel Carrasco Chief, Contracting Division USACE – LA District 13 OCT 2015.
Presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Meeting Neil F. Albert MCR, LLC 4 February 2010.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting August 7, 2007 Prepared by; NDIA IBR Working Group August 2007.
Introduction to the Management Control System (MCS) Process Presented by: Enrique (Rick) Contreras Program Management Specialist SAIC & Dan Crain Process.
Scheduled Government-Furnished Property Attachment: Step-by-Step Tutorial Updated 11 Jan 2016.
GFP Attachment Fields Mandatory/Optional Updated 11 Jan 2016.
ICT industry briefing Review of Procure IT v3.1 Customer Contract 16 February 2016.
Scheduled Government-Furnished Property Attachment: Step-by-Step Tutorial Updated 17 May 2016.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
Breakdown Work Structure Applying Management Tools to a Project.
Evaluating Small Business Participation
IUID and Government Furnished Property Basics
EVM in the LAR Program Paine
Revision reflects an evolution, not a revolution
Introduction to the Federal Defense Acquisition Regulation
Earned Value Management
Commercial Item Group Overview.
DFARS CASE 2003-D009 Payment and Billing Instructions
Supplier Information Session Safeguarding Covered Defense Information and Cyber Incident Reporting, DFARS August 16, 2016 Christian Ortego.
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding
NDIA Earned Value Management Application Guide
Presentation transcript:

presented by: Presented By: MIL-STD 881 Update Neil F. Albert MCR, LLC 26 August 2010

Background of MIL-STD Update Update initiated in October 2008 with requirement to: –Update to Incorporate Changes to reflect DoD Acquisition Policy and Guidance (DODI ) –Add/Improve upon WBS Definitions –Clarify How WBS can be used with Newer Terms and Processes –Ensure the WBS is characterized as an Acquisition tool –WBS to support budget, cost, schedule, technical, contractual and performance management –Ensure Industry Participation Mr. Young’s memorandum of 9 January 2009 –Establishes MIL-HDBK as MIL-STD to ensure consistency in application –Enforces April 2005 Memorandum and DFARs clause - WBS is consistent for Cost and Software Data Reporting (CSDR), Performance Measurement (EVM), and Scheduling (IMS) –Supports development/maintenance of Central Repository 2

Appendices Aircraft Systems AIS/ERP Systems (new appendix) Electronic Systems including embedded SW (adding templates: Processors, EW, Radar, Comm, Nav/Guide, propulsion, etc.) Missile Systems Launch Vehicles (new appendix) Space Systems Unmanned Aircraft Systems Sea Systems Unmanned Maritime Systems (new appendix) Ordnance Systems Surface Vehicle Systems Construction (new appendix) Common Elements 3

Changes from Current Handbook Most appendices have been restructured to account for technology changes and integration changes Most appendices have been defined to level 4 or 5 of the WBS vs. level 3 –Reporting to level will be determined based on a contract to contract basis – could be 3, 4, or 5 –CSDR reporting vs. CPR reporting level may be different but needs to be consistent at the level reported (i.e., level 4 of the CPR should be the same as level 4 on the CSDR) –If elements are considered high cost, high risk, or high technology in nature reporting will go to that level for those items only Added “other” elements to account for changes in configuration or new technology that is not defined within the MIL-STD Eliminated Application and System Software – only Software Changed definitions for embedded Software in Appendix B Added discussion of WBS use with system of systems and family of systems (i.e., take into consideration of common vs. unique WBS elements) Added common elements for sustainment activities – Interim Contractor Support or Contractor Logistics support Added Logistics Management element Expanded discussion on development of WBS to include: –Numbering of a WBS –Prime/Sub relationship –Elements to include vs. not include Added pre-acquisition framework discussion Updated Common elements for unique commodity areas (Space, Aircraft, Missiles, etc) 4