1Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 Stefan Gerhardt (with a lot of help from physics operations team, diagnostics team) Operations.

Slides:



Advertisements
Similar presentations
Examples of ITER CODAC requirements for diagnostics
Advertisements

XP 1157 Increasing the CHI start-up current magnitude in NSTX B.A. Nelson et al. 1.
ASC XP-823 Error Field Correction and Long Pulse J.E. Menard, S.P. Gerhardt Part 1 Determine the source of, and optimal correction for, the observed n=3.
APS-DPP-2005-LeBlanc-1 Update on MPTS B.P. LeBlanc Princeton Plasma Physics Laboratory NSTX Results Review July 26-27, 2006 Princeton, NJ.
1 Edge Electrode Biasing Experiments on NSTX S. Zweben, C. Bush, R. Maqueda, L. Roquemore, R. Marasla M. Bell, J. Boedo, R. Kaita, Y. Ratises, B. Stratton.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Plasma Dynamics Lab HIBP Abstract Measurements of the radial equilibrium potential profiles have been successfully obtained with a Heavy Ion Beam Probe.
Physics of fusion power Lecture 10 : Running a discharge / diagnostics.
V. A. Soukhanovskii Lawrence Livermore National Laboratory, Livermore, CA Acknowledgements: R. Kaita a, A. L. Roquemore a, K. Tritz b a Princeton Plasma.
9/20/04NSTX RESULTS REVIEW NSTX rtEFIT implementation progress results NSTX 2004 RESULTS REVIEW September 20&21, 2004 REAL-TIME EQUILIBRIUM RECONSTRUCTION.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 03/15/2012Preliminary Design Review.
Edge Neutral Density (ENDD) Diagnostic Overview Patrick Ross Monday Physics Meeting Monday, March19, 2007.
NSTX S. A. Sabbagh XP501: MHD spectroscopy of wall stabilized high  plasmas  Motivation  Resonant field amplification (RFA) observed in high  NSTX.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Profile Measurement of HSX Plasma Using Thomson Scattering K. Zhai, F.S.B. Anderson, J. Canik, K. Likin, K. J. Willis, D.T. Anderson, HSX Plasma Laboratory,
Generator magnet program: The future. 85T Multi-Shot and 60T Long Pulse magnets are state of the art world record magnets with an established user program.
1 CHI Summary Transient CHI (XP606) –All systems operated reliably without any faults Edge Current drive (XP533)
V. A. Soukhanovskii NSTX Team XP Review 31 January 2006 Princeton, NJ Supported by Office of Science Divertor heat flux reduction and detachment in lower.
NSTX Centerstack Upgrade: initial discussions of the Machine Protection System (MPS) Robert Woolley 4 November 2009.
Flows, Turbulence, and the Edge Plasma in NSTX C.E. Bush, S. Zweben, R. Maqueda, W. Davis, D. Johnson, R. Kaita, H. Kugel, L. Roquemore, G. Wurden and.
NSTX-U NSTX-U PAC-31 Response to Questions – Day 1 Summary of Answers Q: Maximum pulse length at 1MA, 0.75T, 1 st year parameters? –A1: Full 5 seconds.
Demonstration of 200 kA CHI Startup Current Coupling to Transformer Drive on NSTX B.A. Nelson, R. Raman, T.R. Jarboe, University of Washington D. Mueller,
T.M. Biewer, Oct. 20 th, 2003NSTX Physics Meeting1 T. M. Biewer, R.E. Bell October 20 th, 2003 NSTX Physics Meeting Princeton Plasma Physics Laboratory.
OPERATIONAL SCENARIO of KTM Dokuka V.N., Khayrutdinov R.R. TRINITI, Russia O u t l i n e Goal of the work The DINA code capabilities Formulation of the.
PF1A upgrade physics review Presented by D. A. Gates With input from J.E. Menard and C.E. Kessel 10/27/04.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Leblanc_03Feb09_1 MPTS Phase 4 Benoit P. LeBlanc PPPL 19 June 2009.
Advances In High Harmonic Fast Wave Heating of NSTX H-mode Plasmas P. M. Ryan, J-W Ahn, G. Chen, D. L. Green, E. F. Jaeger, R. Maingi, J. B. Wilgen - Oak.
Integration and Plasma Control D.A. Gates, M.G. Bell NSTX 5-Year Plan June 30-July 2, 2003.
CHI Run Summary for March 10-12, 31 & April 9, 2008 Flux savings from inductive drive of a Transient CHI started plasma (XP817) R. Raman, B.A. Nelson,
Brent Stratton for the NCSX Team Princeton Plasma Physics Laboratory Oak Ridge National Laboratory NCSX Program Advisory Committee Meeting #8 Princeton.
OPERATIONAL SCENARIO of KTM Dokuka V.N., Khayrutdinov R.R. TRINITI, Russia O u t l i n e Goal of the work The DINA code capabilities Formulation of the.
CCFE is the fusion research arm of the United Kingdom Atomic Energy Authority Presentation on prioritisation of DIVSOL proposals for M9 Andrew Kirk.
Progress on NSTX towards steady state at low aspect ratio D. A. Gates, Princeton Plasma Physics Laboratory on behalf of the NSTX Research Team Supported.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
L. Zanotto – 10 February 2011 – RFX-mod programme workshop TF2: Active control of RFP and tokamak plasmas Report on experimental proposals L. Zanotto,
Work with TSC Yong Guo. Introduction Non-inductive current for NSTX TSC model for EAST Simulation for EAST experiment Voltage second consumption for different.
RFX-mod programme workshop, January 2009 Scenario and operational issues for high current L. Zanotto, R. Cavazzana, S. Dal Bello, F. Milani.
Parallel Correlation of SOL Turbulence S.J. Zweben, F. Scotti, J.W. Ahn, T. Gray, M. Jaworski, S. Kubota, R. Maqueda, N. Mandell, D. Smith, V. Soukhanovskii.
Low-density Start-up D. Mueller, M. Bell, S. Gerhardt, J. Menard, R. Raman, S. Sabbagh NSTX FY12 low density discussion: May 12, 2011.
Beam Halo Monitoring using Optical Diagnostics Hao Zhang University of Maryland/University of Liverpool/Cockcroft Institute.
Dependence of Pedestal Structure on Ip and Bt A. Diallo, R. Maingi, S. Zweben, B.P. LeBlanc, B. Stratton, J. Menard, S. Gerhardt, J. Canick, A. McClean,
ASIPP Magnetic Diagnostics of HT-7U Tokamak Shen Biao Wan Baonian Institute of Plasma Physics, CAS P.O.Box 1126, Hefei, Anhui , P.R.China (e_mail:
Solenoid Free Plasma Start-up Mid-Run Summary (FY 2008) R. Raman and D. Mueller Univ. of Wash. / PPPL 16 April 2008, PPPL 1 Supported by Office of Science.
NSTX-U Run Planning Guidance for 2015 NSTX-U Research Forum 1 FY2015 (and 2016) research milestones will guide prioritization of eXperimental Proposal.
Edge Turbulence in High Density Ohmic Plasmas on NSTX K.M. Williams, S.J. Zweben, J. Boedo, R. Maingi, C.E. Bush NSTX XP Presentation Draft 5/25/06.
1Field-Aligned SOL Losses of HHFW Power and RF Rectification in the Divertor of NSTX, R. Perkins, 11/05/2015 R. J. Perkins 1, J. C. Hosea 1, M. A. Jaworski.
Martin Peng NSTX Program Advisory Committee Meeting (PAC-14) January 21 – 22, 2003 PPPL Princeton, NJ PAC-13 Action Items Supported by Columbia U Dartmouth.
Engineering Operations Outage Status: Tile cleaning is complete Tentatively planning on 2 LITER operation. Design Review upcoming Shielding of HHFW/in-vessel.
1/16 NSTX-U Physics Mtg, Initial results XP-108, Charles Skinner et al., 11 Jan 2016 C. H Skinner, J.P. Allain, F. Bedoya, W. Blanchard, D. Cai, B.E. Koel,
1 NSTX EXPERIMENTAL PROPOSAL - OP-XP-712 Title: HHFW Power Balance Optimization at High B Field J. Hosea, R. Bell, S. Bernabei, L. Delgado-Aparicio, S.
Development and Assessment of “X-point limiter” Plasmas M. Bell, R. Maingi, K-C. Lee Coping with both steady-state and transient (ELM) heat loads is a.
3/2 NTMs, XP 834, X/X/20081 XP 834: Threshold and Small Island Physics of the 3/2 NTM S.P. Gerhardt, D. Gates Helpful discussions with E. Fredrickson,
Initial Results from the Scintillator Fast Lost Ion Probe D. Darrow NSTX Physics Meeting February 28, 2005.
Pedestal Characterization and Stability of Small-ELM Regimes in NSTX* A. Sontag 1, J. Canik 1, R. Maingi 1, J. Manickam 2, P. Snyder 3, R. Bell 2, S. Gerhardt.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Masa Ono February 5, 2016 NSTX-U Team Meeting.
Recent Disruption Studies in NSTX S.P. Gerhardt. Four Destructive Phenomena Associated With Disruptions Thermal Quench –Extremely Rapid (
NSTX SAS – GMS Mtg. 12/1/04 S. A. Sabbagh and J. E. Menard NSTX RWM Active Feedback System Implementation Plan Discussion NSTX Global Mode Stabilization.
NSTX S. A. Sabbagh XP452: RWM physics with initial global mode stabilization coil operation  Goals  Alter toroidal rotation / examine critical rotation.
Fast 2-D Tangential Imaging of Edge Turbulence: Neon Mantle (draft XP) R. J. Maqueda, S. J. Zweben, J. Strachan C. Bush, D. Stutman, V. Soukhanovskii Goal:
NSTX S. A. Sabbagh XP407: Passive Stabilization Physics of the RWM in High  N ST Plasmas – 4/13/04  Goals  Define RWM stability boundary in (V , 
1NSTX-U FY2016 Q1 Review – Program / Menard – February 8, 2016 Jon Menard, Stan Kaye, Masa Ono (PPPL) For the NSTX-U Team NSTX-U Program FY2016 Q1 Report.
NSTX APS-DPP: SD/SMKNov Abstract The transport properties of NSTX plasmas obtained during the 2008 experimental campaign have been studied and.
1 Edge Characterization Experiment in High Performance (highly shaped) Plasmas R. J. Maqueda (Nova Photonics) R. Maingi (ORNL) V. Soukhanovskii (LLNL)
Peter Križan, Ljubljana September 17, 2008 SuperB PID Peter Križan University of Ljubljana and J. Stefan Institute Forward PID: - SiPM as photon detectors.
Research Operations Update S.P. Gerhardt August 2015 NSTX-U Team Meeting PPPL 8/14/2015 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Design of Interferometer System
Presentation transcript:

1Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 Stefan Gerhardt (with a lot of help from physics operations team, diagnostics team) Operations Update Monday Physics Meeting B-318 1/11/2016 Place your institutional logo(s) here:

2Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 About 6-8 Total Calendar Days of Running So Far 12/19/2015 +

3Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 Shots are: –202439, from 1/23/2015 –202532, from 1/5/2016. Clear benefits: –Reduced flux consumption –Higher stored energy –Reduced CS OII Intend to repeat boronization tonight (1/11/2016) Boronization Was Successful In Decreasing Oxygen Levels IPIP I OH W MHD CS O II CS D 

4Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/ kA pre-charge chosen to match NSTX, but 20 kA provides more total flux for driving current. 20 kA case has smaller null, and requires more loop voltage initially. Both He shots. PCS shuts down both shots after detecting a VDE. All further operations in this talk used 8 kA pre-charge; will revisit this topic. Higher Pre-Charge Scenarios Have Been Developed IPIP I OH V loop 

5Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 Source 1A: –From TS: Had run in the high 50s [kV], but ran at about 40 kV on 1/8/2016 because we had some M/R and arc problems Source 1B: –From TS: 1B has been working in the 40s. It needs conditioning time. Source 1C: –From TS: 1C has been up to 65 kV and ran reliably at 60 kV. Source 2C: –From TS: 2C has been steady at 60 kV but we have not raised it due to questions about the transmission line. These sources are now available for operations. Sources 2A and 2B will be commissioned once their trunk-line issues are resolved. Each Beam Was Put Into a Helium Plasma in XMP-127

6Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 Collected Data for Neutron Calibration Neutron transfer important because the model train calibration is done using ‘count mode’, but big plasma shots use ‘current mode’ –Need shots where both modes have good signals. These were the first D 2 shots ever for NSTX-U. Shot is the highest neutron emission, largest Q=integral(I), for NSTX-U , IPIP I OH W MHD elongation Neutrons [Arb.]

7Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 Recent Efforts Have Looked at Increasing the Elongation Increase the elongation by both lowering the PF-3 current and raising the divertor current. Stored energies of ~70 kJ achieved with NB heating in larger elongation shots. IPIP I OH W MHD elongation I PF-1aL

8Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 Recent Efforts Have Looked at Increasing the Elongation Increase the elongation by both lower the PF-3 current and raising the divertor current. Stored energies of ~70 kJ achieved with NB heating in larger elongation shots. IPIP I OH W MHD elongation I PF-1aL

9Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 Vertical Control Has Been Problematic When Increasing Elongation Internal inductance is ramping up. Vertical oscillations and LoC are common when the elongation is increased. Now looking at ways to lower l i. IPIP lili W MHD elongation I PF-3U -I PF-3L

10Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 Consistent Improvements in Duration and Stored Energy Database excluding ‘fizzles’

11Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/ But Need to Reduce The Internal Inductance From Menard, et al, Nuclear Fusion 2012 NSTX-U Achieved  vs l i Extrapolation of the NSTX database implies there is not a lot of room for improvement at this l i

12Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 Demonstrated –Control of multiple plasma wall gaps from simple shape control algorithm.  (SP gaps in PCC algorithm) –Use of multiple sensors for vertical control. –Sloped baseline subtraction for magnetics. –Automatic plasma shutdown when a disruption is deemed imminent.  I P rampdown, beams & gas off, shaping reduction, automatically when VDE or I P transient is detected. Being rolled out now –Loop voltage compensations on the RWM sensors. –Reduced noise processing for vertical position detecting sensors. Many Upgrades to PCS Compared to NSTX

13Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 Magnetics: –Equilibrium flux and field measurements in good shape, support EFIT and PCS operations. –New diamagnetics loops appear to be working out well. –RWM sensors writing data to tree, but need better plasmas to complete calibration. –High-n and high-f arrays both producing data. CHERS –CHERS, pCHERS, ERD, RTV systems are up & running. Acquisition software is working OK for all systems. –So far, we confirm light from CHERS, RTV & top views of pCHERS  bottom shutters were kept closed during shots, so no pCHERS bottom views have seen light). –Analysis software is still under development to account for new hardware & software configurations. MPTS –The MPTS system has started data acquisition in its upgraded 42-channel configuration. –The analysis T_e, n_e and p_e profiles are not ready for dissemination as they reflect alignment and hardware problems. Some Diagnostic Status Notes (I)

14Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 BES [Dave Smith] –Not ready yet. A few hardware tasks to complete, and the computer group is still configuring the BES digitizer. Irvine EP diagnostics [Deyong Liu] –v-FIDA and t-FIDA: work reasonably well, in the process of fine turning and data validity check. –ssNPA: pick up huge noise during plasma operations, currently troubleshooting noise problem. Survey spectroscopy [Vlad Soukhanovskii] –EIES (aka filterscopes) operational, 7 channels viewing lower divertor, 5 channels viewing inner wall, 5 channels viewing upper divertor with common filters for edge intensities of D-alpha, C II, O II, B II, Li I –Survey UV-VIS spectrometer VIPS 2 operational with 4 simultaneous views Plasma TV [Mike J.] –Bay B Plasma-TV: operating. Unexpected vignetting is making it appear like the current lens is not fish-eye. I'll be changing it out when schedules permit. –Bay I Plasma-TV: waiting on some installations in the test cell. Some Diagnostic Status Notes (II)

15Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 IR Cameras [Travis Gray] –Lower Divertor Fast IR Camera: Revised Work Package submitted. Waiting approval –Lower Divertor wide-angle IR Camera: Revised Work Package submitted. Waiting approval –Upper Divertor Fast IR Camera: Plan to install during first maintenance break –Testing and debugging of automated data acquisition software is in progress. Physics Cameras [Scotti] –Three wide angle divertor fast cameras (two lower, one upper) installed and running, equipped with filter wheels. –New LLNL filtered fast camera with lower divertor view installed and running. –Two new radiation-hardened CID cameras equipped with custom two-wavelengths optics (TWICE-1, -2) installed. TWICE-1 has been running routinely. Working on acquisition for TWICE-2. –Overall 2D imaging of lower divertor available at 7 different wavelengths simultaneously. –The new ENDD installed and running. Mirror alignment being improved. Some Diagnostic Status Notes (III)

16Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 Core AXUV Bolometry System [Luis D.-G.] –Core diode arrays, electronics and DAQs for AXUV-bolometer are installed. –New fiber optic and ethernet cables will be installed during the two-week maintenance period. JHU Spectroscopy [Kevin T.] –Poloidal USXR is mounted and waiting for ethernet in the rack and mounting of the stepper motors. –MESXR systems are mounted and ready, but working on the noise issues. –TGIS is ready to be installed, blue folder work packet has been generated. MSE-CIF [Howard Yuh] –MSE-CIF is ready to go. We should be ready to take data when it is available. Langmuir Probes [Mike J.] –delayed due to schedule and priority constraints. 90% fabricated but some remaining design work needed. Some Diagnostic Status Notes (IV)

17Physics Meeting, Operations Update, S.P. Gerhardt, 1/11/2016 Presently repairing a leaky fitting on the TF coil. –Plan to boronize tonight, run tomorrow (1/12/2016). Run weeks of 1/11/2016, 1/18/2016 PAC is week of 1/25/2016 Maintenance weeks on 1/25/2016, 2/1/2016. Key items: –Repairs of NB 2a and 2b trunk lines. –LITER electrical and mechanical. –Argon purge system piping –You can work on any of your systems with approved work permit or work package. –LoWEUS/XEUS/MONALISA electrical/mechanical. Run again starting 2/8/2016 Near Term Schedule