ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February 2007 1 Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
20/01/09 OPERA general meeting Nagoya CNGS report.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Energy Saving Jean-Paul Burnet & Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters.
MTTR, spare parts and stand- by policy for ATB equipments R. Losito AB/ATB 23th Jan ATC/ABOC Days 1.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 1 MAGNETS FOR SPS & BEAM LINES MTTR & Spare Policy for the LHC Injectors & Exp.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
Linac2 Review  L2 operated with 99 % uptime in 2010 and 98% in the last 10 years  Systems review: all under control even for L2 till LS2 if ‘nightmare’
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
21 January 2008ATC/ABOC Days, P. Strubin Overview of the main events related to AT equipment in the LHC injector chain for 2007 P. Strubin, on behalf of.
ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Operational Scenarios for 2008 P. Collier, CERN AB/OP 21st January 20081P. Collier, CERN AB/OP.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Controls Issues Through the Backbone R. Steerenberg with help of many colleagues ATC – ABOC Days 23 January 2007 ATC – ABOC Days 23 January 2007.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
LSC May 2013 Outcome of the magnets tests from the PS, Leir and transfer lines Dominique Bodart.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
CERN accelerator chain (operating and approved projects)
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
SPS availability K. Cornelis Acknowledgments : A. Rey and J. Fleuret.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
P.Collier: Session 3 Summary1 ATC/ABOC Days 2007 Session 3: The LHC Injector Chain.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
What’s Falling Apart in the Injector Chain ? PS/SPS Days January 2005.
EYETS David Hay EN-OSS.
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
EN-CV interventions during EYETS for PS and PSB
Alexander Herlert, CERN (PH-SME-IS)
Michael Benedikt AB/OP
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Power cut 18kV cable for EMD404/E9 is heating
D. Manglunki with input from C. Carli, K. Cornelis, T. Dobers, I
Present and Future test facilities for High-intensity Targetry CERN
SLHC-PP kick-off meeting, CERN 9 April 2008
How to control the local beam density
Experimental Areas – LS2 planning
Presentation transcript:

ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation in 2007 and Outlook for 2008: 5 presentations  Operations Review 2007 for the LHC injector Chain:  Rende Steerenberg  Overview of the main events related to TS equipment for 2007:  Serge Deleval  Overview of the main events related to AT equipment in the LHC injector chain for 2007:  Pierre Strubin  Operational Scenarios for 2008  Paul Collier  The plans and needs of the Experimental Areas in 2008 and Beyond:  Lau Gatignon

Operation in 2007 and Outlook for 2008 ATC-ABOC days Summary Session; February Talk by Rende Steerenberg AB-OP Overall excellent performance of the whole injector complex!  the consolidation investment seems to pay off!!! Analysis by machine: LINAC2  Vacuum problem in tank 3 could be fixed. However, this is still a improvised fix and a vacuum fault in LINAC2 remains a major worry!  Working sets under Java console manager did not always report coherent information  X-motif will remain available in 2008

Operation in 2007 and Outlook for 2008 ATC-ABOC days Summary Session; February Talk by Rende Steerenberg AB-OP Analysis by machine: PSB  quick start-up; all LHC beams; 3.8E13ppp  LINAC2 to PSB trajectory troublesome due to PS stray fields  work is underway to tackle this problem  Problems related to the fast wire scanners (2 out of 8 broken, calibration)  additional vacuum valves plus new electronics  Problems with the tune measurement system (worked only at the end of the run and for one ring)  new BBQ system for whole PS complex!  Erratic readings from ejection transformers  new electronics; will not be available for beginning of 2008 run; no spares for old electronics  Beam intensity limitations (feedback and h1 CO4)  proposed new operation modes need to be tested in 2008

Operation in 2007 and Outlook for 2008 ATC-ABOC days Summary Session; February Talk by Rende Steerenberg AB-OP Analysis by machine: PS good beam availability of 93%  problems related to 5-current mode PFW PC (e.g. MTE ; DIRAC)  problems solved by end of run with many back and forth switching  new installations should be tested in parallel  problems related to the tune measurement system  the old system will be made available again in 2008  nonlinear Q’ measurements could not be finished  PFW matrices are incomplete  PS not in good shape for Q and Q’ control  MTE installation advances well but one needs to verify the application software readiness

Operation in 2007 and Outlook for 2008 ATC-ABOC days Summary Session; February Talk by Rende Steerenberg AB-OP Analysis by machine: SPS good beam availability of 82%; high intensity beam delivered to North area; extraction without tune-split; Pb ion MDs  some problems due to RF transmitter (worse after startup with ion MD)  being worked on, but status not clear  problems related to the 18kV cables  compensator overheating when SPS is not pulsing  both points are addressed by Serge Deleval  CNGS run stopped due to radiation issues  major consolidation effort in 2007/2008 shutdown  talk by E. Gschwendtner

Overview of the Main Events related to TS equipment ATC-ABOC days Summary Session; February Talk by Serge Deleval TS-CV SPS compensators  no backup in 2007  SVC2 and SVC3 will be in service in 2008; BEQ1 as backup SPS 18kV cables  consolidation is ongoing radioactive gas release in Isolde complex in 2007  modifications in the ventilation system implemented during shutdown CNGS ventilation  new installation with adequate shielding for 2008 run.

Overview of the Main Events related to AT equipment ATC-ABOC days Summary Session; February Talk by Pierre Strubin AT-VAC AD, Booster, ISOLDE and East Hall miss a clear status report and documentation of the equipment  a complete inventory should be made Major problems have been identified and solutions found  water leaks in the SPS magnets  PS magnet consolidation  vacuum leaks in ion-pump feed throughs due to corrosion  Vacuum and magnet system should not develop major problems in ‘08 But: equipment is ageing and requires constant monitoring & maintenance! North Area: long delays for repair due to cool down periods

Operational Scenarios for 2008 ATC-ABOC days Summary Session; February Talk by Paul Collier AB-OP It is still possible to have a sector test with beam in the LHC in May No Pb ion beam operation in 2008 except for the 18GHz acceptance test in LINAC3 CNGS can at best receive 3.1 to 3.8 E19 protons while the experiment asks for 4.5E19 (flexible use of supercycles but still too few protons!) MDs organized again in blocks: 6 blocks in 2008  additional parasitic MDs will be needed throughout the year  special Wednesday MDs for MTE commissioning Implementation of a CERN wide panel for ‘intervention prioritization’ will start work in 2008

Plans and Needs of the Experimental Areas in 2008 ATC-ABOC days Summary Session; February Talk by Lau Gatignon AB-ATB AD: three main experiments (ALPHA, ASACUSA and ATRAP) community expects to run beyond 2010  orbit jump have been identified and fixed by magnet replacement  consolidation bears its fruits and should continue REX Isolde:  need solution for radiation leakage through ventilation system  need 3 weeks offline run for new RILIS solid state pump laser  beyond ‘08: need consolidation of robot, transformers and vacuum system LEIR: no run in 2008  beyond ‘08: Need to clarify future ion program for North Area (NA61)

Plans and Needs of the Experimental Areas in 2008 ATC-ABOC days Summary Session; February Talk by Lau Gatignon AB-ATB nTOF and MERIT:  MERIT will be dismantled  nTOF requires new target and reinstallation of beam line  this must have no impact on TT2 beam availability EAST Area:  needs many EASTB cycles with maximum flat top for DIRAC  beyond ‘08: DIRAC continues in 2009; CLOUD till 2012 magnet situation is worrying!

Plans and Needs of the Experimental Areas in 2008 ATC-ABOC days Summary Session; February Talk by Lau Gatignon AB-ATB North Area: Need optimum duty cycle for COMPASS; operation foresees intense program in EHN1  beyond ‘08: possibly new experiments in ECN3 (NA62) and FP7 proposal for test beams and radiation facilities CNGS: Need to consolidate facility by May 2008;  need high intensity asap (missing target mass & shorter run)  need MTE asap  beyond ‘08: question if OPERA will run for more than 5 years

Summary ATC-ABOC days Summary Session; February Large physics program for the injector complex in addition to LHC:  2008 will put additional cycles on injector complex  ‘low priority’ cycles (East Hall) are most stressful for PS  reliability Overall excellent performance of the whole injector complex!  the consolidation investment seems to pay off!!! The injector complex is aging and requires continues maintenance!  consolidation and sufficient support are vital even if focus is now shifting to the LHC!