© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.

Slides:



Advertisements
Similar presentations
DRAFT Shipperless and Unregistered sites 3 November 2010.
Advertisements

Third Energy Package for Change of Supplier 2009/73/EC.
Shipperless & Unregistered Workgroup Wednesday 29 th January 2014.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
Implementation of Non Effective Days Nexus Workgroup – March
Reasonable Endeavours Claims Distribution Workstream MOD231 16/12/08.
SGN S&U Update Lisa Warnock 1 st November Agenda Data cleansing (set to dead/extinct) Shipper interaction SGN root cause measures.
New project process – timescalesDN xoserve IGT/ Agent Shipper Apply for connection Ref IG123 OR AG123 Issues quote Ref DN123 Accepts quote Quotes Developer/UIP.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
1 Modification 422 Creating the permission to release data to Meter Asset Provider organisations A presentation by the Community of Meter Asset Providers.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
Shipperless & Unregistered Workgroup Friday 1 st November 2013.
Xoserve sense checks & validation Reasonable Endeavours Claims.
Copyright National Grid Metering NGM Daily Meter Reads UNC RG 0175.
MPRN Creation Workgroup Tuesday 27 th March 2012.
Shipperless & Unregistered site working group Recommendations to Process Backlog Shipper Activity Monthly report No interest - orphaned Widened identity.
P274 – National Revenue Protection Service. 2 Principles of X-industry gas theft service The impact on the participants will be revenue neutral (no supplier.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve.
DN Emergency Procedures – Theft of Gas Simon Trivella –15 th June 2009 Review Group 0245 – Theft of Gas arrangements.
1 Industry Shipperless &Unregistered Working Group Wednesday 5 th May 10.30am at xoserve.
Shipperless & Unregistered Workgroup Monday 1 st July 2013.
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
PN UNC Workgroup iGT Services 7 th February 2012.
Industry Shipperless &Unregistered Working Group Thursday 17 th September 10:30 at Xoserve.
Current and New process Current Process New Process Response: Does not want service but live supply -Passed into Orphaned Report Intends to confirm – Remains.
Results of Group Discussion. Discussion Points Shipperless and Unregistered Sites have been partly There are a number of Shipperless and Unregistered.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
Single National Provider for the Detection & Investigation of the Illegal Use of Gas UNC Review Proposal October 2009 Anne Jackson, Scottish.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
1 Industry Shipperless &Unregistered Working Group Wednesday 8th September 10.00am at xoserve.
1 Industry Shipperless &Unregistered Working Group Thursday 7 th January 10.30am at xoserve.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal February 2010 Karen Kennedy ScottishPower.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
COR2789 – Measures to Address Unregistered and Shipperless Sites Implementation of MOD424, MOD410a & G
David Addison / Steve Deery
Supply Point Register 10th January 2012
Revised registration for unregistered sites
Must Read Process Guide For Shippers
Chris Warner Network Code Manager
PAF Risk Register and PARR mapping
Project Nexus Workgroup
New project process – timescales
Theft on Shipper-less Sites
Reasonable Endeavour Claims
Chris Warner Network Code Manager
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
0630R Review Group meeting 21 February 2018 Settlement Data topic
Industry Shipperless & Unregistered Working Group
Project Nexus Workgroup
Shipperless and Unregistered Workgroup
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
UK Link Replacement Programme additional supporting UNC modifications
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Lessons Learnt UKLC - November 2015
Theft: Shipperless Arrangements
Joint Theft Reporting Review (from meeting 1st March 2019)
Unregistered Sites Reports
M Number Creation process
Project Nexus Workgroup
Shipperless/Unregistered Sites
DN Interruption Phase II
Project Nexus Workgroup
Unregistered and Shipperless Process
xoserve Services XOSERVE SCOPE Sites Register Maintenance Shipper
Development Work Group 194
Presentation transcript:

© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter withdrawal Meter found in situ Example 1A – Incorrect data flow sent, Transporter identifies meter, Shipper A is contractually responsible for the site back to the effective withdrawal date Example 1B – Effective withdrawal following vacant property. Shipper A fails to register new customer. Shipper A is contractually responsible from the effective withdrawal or meter fit date

© British Gas Trading Limited 2011 Slide 2 Re-establishment of Shipperless Sites UNC0425 Shipper’s liability Scenario 2 – Shipper A withdrawal / Shipper B activity Effective meter withdrawal Meter found in situ Other Shipper activity (e.g. failed registration) 1.Transporter identifies meter in situ and Shipper B activity (failed confirmation, registration, meter readings or asset updates to the C&D store). 2. Shipper B contractually responsible for registration to effective withdrawal date or meter fit date.

© British Gas Trading Limited 2011 Slide 3 Re-establishment of Shipperless Sites UNC0425 Shipper’s liability Scenario 3 – Shipper A withdrawal / Customer activity Effective meter withdrawal Meter found in situ Customer fitted meter Example 3 – Shipper A effective withdrawal. Customer connects meter. Customer signs supply contract or risks disconnection 4. Transporter contacts customer informing them to obtain a supply contract or they risk being disconnected. 3. Shipper A passes evidence to Transporter. 2. No supply contract obtained by the customer - Theft in Conveyance. 1. Shipper A writes to customer notifying them to obtain a supply contract.