9/25/2006All experimenters meetingA. Jansson 1 Tevatron Ionization Profile Monitors Andreas Jansson.

Slides:



Advertisements
Similar presentations
FNAL Emittance Devices Flying Wires (FW) Sync Lite Ion Profile Monitors (IPM) aah,6/20/2000.
Advertisements

Development of a Chromaticity measurement application using Head-Tail phase shift technique.
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
11 October 2006Basic Layout of LER G. de Rijk1 Basic Layout of LER  The basic idea  VLHC type magnets  LER in the LHC tunnel  Layout  LER experiment.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
TEVATRON IONIZATION PROFILE MONITOR Andreas Jansson Fermilab.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
The Development of an Ionization Profile Monitor for use in the Tevatron Lawrence Short Bull SJSU, San Jose, CA Supervisor: Andreas Jansson Beams Division,
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
IPM status and plans 1.Yellow vertical detector has extremely low coupling to beam and to signal-gating grid. It also has improved resolution due to reduced.
H. Matis, M. Placidi, A. Ratti, W. Turner [+ several students including S. Hedges] (LBNL) E. Bravin (CERN), R. Miyamoto (BNL – now at ESSS) H. Matis -
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
Tevatron IPM status Oct 2009 Andreas Jansson K.Bowie, T.Fitzpatrick, R.Kwarciany, C.Lundberg, D.Slimmer, L.Valerio, J.Zagel Also thanks to: T.Anderson,
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
3/14/2007AD/Instrumentation Department Jim Zagel 1 MFW Update 3/14/07 Latest problems RFT Looses Phase Lock –Real 53 MHz connected to the RFT at MI-10.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
CALIBRATION OF TEVATRON IONIZATION PROFILE MONITOR (IPM) FRONT END (FE) MODULES Moronkeji Bandele Physics and Engineering Department Benedict College,
Status of Tev IPMs September 3, 2008 Andreas Jansson.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
TEVATRON IONIZATION PROFILE MONITOR Andreas Jansson Fermilab.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
Fermilab Run 2 Accelerator Status and Upgrades
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
Proton Source Improvement Workshop Cogging W. Pellico Dec 6&
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Motivation and overview.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
12/06/2006 MFW. 12/06/2006 P-Bar Injection 12/06/2006 MFW Latest problems stem from RFT Module loosing phase lock. Greg Vogel informs us that the “real.
10/5/2005 jrz1 Not quite “All” you want to know about Flying Wires At Fermilab Jim Zagel 10/5/2005.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
F f Quadrupole Pick-Ups at CERN & Fermilab A.Jansson FNAL.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
1 Roger Rusack The University of Minnesota. Projects  Past Projects  11,000 channels of 0.8 Gbs for the CMS crystal calorimeter readout.  1,500 channels.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
A Survey of TBT Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Tevatron Department Meeting February 18, 2005 Beams-doc-1583-v2.
A Survey of the Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Run II Meeting March 24, 2005 Beams-doc-1752-v2.
Tevatron Ionization Profile Monitors - design, results & status Andreas Jansson K.Bowie, T.Fitzpatrick, R.Kwarciany, C.Lundberg, D.Slimmer, L.Valerio,
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Ion Profile Monitors _ 2017 Jim Zagel GSI - IPM17 Workshop
Results with the RPC system of OPERA and perspectives
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Summary of experience with Tevatron synchrotron light diagnostics
Summary of experience with IPM measurements at BNL-RHIC
LHC (SSC) Byung Yunn CASA.
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
RPC Front End Electronics
The LHCb Front-end Electronics System Status and Future Development
MEIC New Baseline: Performance and Accelerator R&D
Presentation transcript:

9/25/2006All experimenters meetingA. Jansson 1 Tevatron Ionization Profile Monitors Andreas Jansson

9/25/2006All experimenters meetingA. Jansson 2 Team rooster Accelerator Division A. Jansson, C.Lundberg, D.Slimmer, L.Valerio, J.Zagel, T.Anderson, A. Chen, R.Dysert, S.McCormick, S. Suleimani, C.Rivetta, B.Hively, D.Miller, J.Volk Particle Physics Division K.Bowie, T.Fitzpatrick, A.Bross, H.Nguyen, T.Zimmermann Z.Tang Computing Division R.Kwarciany, M.Bowden Technical Division H.Glass, D.Harding, V. Kashikin Also thanks to the DOE for the RunII upgrade money!

9/25/2006All experimenters meetingA. Jansson 3 Motivation Luminosity is inversely proportional to beam size. Don’t dilute the emittance! Measure beam size turn-by-turn, especially at injection (to detect focusing errors).

9/25/2006All experimenters meetingA. Jansson 4 IPM detector 0.2T MCP -1kV -100V 0V -9.9kV -10kV All signal cables are enclosed in a Faraday cage!

9/25/2006All experimenters meetingA. Jansson 5 DAQ system CMS-QIE chip digitizes signal in tunnel. Serial data uplink on optical fiber. Receiver and data buffer in upstairs PC Timing + QIE clock + QIE clock supplied from PC thru cat-5E cable Timing card (PCI) Timing fanout QIE cards (16x 8 ch) Data Buffer (2x 8 links) (PCI) Host PC (LabView) Service building Tunnel

9/25/2006All experimenters meetingA. Jansson 6 Setup Control PC E0 service building IPM detector and QIE boards Tev E0 straight section Nitrogen injection system Tev E0 straight section

9/25/2006All experimenters meetingA. Jansson 7 Beam profile at 150GeV Proton bunch #22 at 150GeV during store #4772. Measured beam size 1.05mm, turn-by-turn variation ~50um. Total signal per bunch ~1.7pC. 1 cm 30 turn average single turn Single bunch proton profiles Magnet at 200A

9/25/2006All experimenters meetingA. Jansson 8 Flying wire comparison Known electronics problem (cross talk from timing pulse) Comparison of vertical beam size from IPM and nearby Flying Wire. Tuning of abort gap cleaner timing had caused blow-up of certain bunches. From MAD lattice file, expect a 13% wider beam at Flying Wire. See ~1%.

9/25/2006All experimenters meetingA. Jansson 9 Injection turn-by-turn Proton bunch #21 turn-by-turn 1 cm Store #4772Magnet at 200A RMS profile width [mm] FFT 0 35 turns

9/25/2006All experimenters meetingA. Jansson 10 Transfer tuning study September 20 th : changed selected x-fer line quads Nominal settings Q701 at -22A Q701 at -42A Q711 at -25A NB. Q711 was found to steer the beam significantly

9/25/2006All experimenters meetingA. Jansson 11 Measured mismatch vectors Nominal settings Q701 at -22A Q701 at -42A Q711 at -25A Need to increase Q711 by ~15A (saturation?) Should result in 5-10% smaller vertical emittance Should have very little effect on horizontal plane. Should have been tested this morning…

9/25/2006All experimenters meetingA. Jansson 12 A first look at pbars First look at circulating pbars during store 4963 on Tuesday September 19 th ! (average over 40 turns)

9/25/2006All experimenters meetingA. Jansson 13 Conclusions Tevatron Ionization Profile Monitor see vertical injection mismatch, which can be mitigated with transfer line quad corrections. Should result in 5-10% smaller emittance, and corresponding increase in luminosity. May also alleviate beam-beam effect on protons. Still need to look at horizontal plane (need to fix tunnel hardware). Have seen coasting pbars, but pbar mismatch measurements (single turn) may need higher vacuum pressure.

9/25/2006All experimenters meetingA. Jansson 14 Extra slides

9/25/2006All experimenters meetingA. Jansson turns Four injection measurements superimposed

9/25/2006All experimenters meetingA. Jansson turns FFT of: First 100 turns Turn

9/25/2006All experimenters meetingA. Jansson 17 P150 transfer line Plot from M. Berdnikov

9/25/2006All experimenters meetingA. Jansson 18 Beam profile at low beta Proton bunch #1 at low beta during store #4758. Measured beam size 0.55mm, turn- by-turn variation (noise) 20µm. Total signal per bunch ~1.3pC. 30 turn average single turn Magnet at 200A

9/25/2006All experimenters meetingA. Jansson 19 QIE card 8 channels (CMS QIE8) per board. Achieved noise ~1.8fC with 4’ cable. Data is combined with timing information, serialized by CERN GOL ASIC (rad hard) and sent thru optical fiber at 1.1Gbps data rate Timing fanout board cleans up and distributes clock and timing signals

9/25/2006All experimenters meetingA. Jansson 20 Data buffer card Handles 8 incoming optical links (64 channels, 1.1 GB/s of data) Can sparsify data on–the- fly based on timing masks 512MB RAM allows for – turns of continuous data – turns for 72 bunches –6 million turns for a single bunch Read out thru PCI64 bus. Two boards are used to handle 128 channels. IPM buffer board doubled as prototype for BTeV L1 data buffer. Considered for use in MICE experiment.

9/25/2006All experimenters meetingA. Jansson 21 Timing card Produces the 15MHz (2/7 RF) QIE clock Decodes and transmits beamsync revolution marker + injection and trigger events Controls QIE settings. 396 ns (21 buckets) p-pbar separation ~120ns RF 2/7

9/25/2006All experimenters meetingA. Jansson 22 Software Both IPMs now have new software and firmware. Software/Firmware still being improved. Vertical IPM works pretty well. Horizontal IPM has some hardware problems (one dead FE board, one FE board with a sync problem, several broken channels) that require an access. NB. REAL DATA!