PSB Injection Overview + Specification changes ABT LIU Project Review 2015 20-11-2015 Wim Weterings.

Slides:



Advertisements
Similar presentations
Kicker SloW (KSW) magnets and Generators PSB 160 MeV H - injection L. Feliciano TE/ABT.
Advertisements

Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.
Transfer Line Linac4 to PSB: Injection Aperture Limitations.
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
E.Benedetto, 30/05/13, LIU-PSB Meeting, PSB chicane magnets: Inconel chamber PSB H- chicane magnets: Inconel vacuum chamber option & consequences on beam.
Linac4 Beam Commissioning Committee PSB Beam Optics and Painting Schemes 9 th December 2010 Beam Optics and Painting Schemes C. Bracco, C. Carli, B. Goddard,
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato LIU - PSB Ho-H- Injection Meeting 1.
PSB h- injection Layout issues –Are 3 or 4 KSW needed –Geometry of the injection –Element lengths and locations Element performance specifications H 0.
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Status Report of the PSB Half-Sector and Stripping Foil Test in L4T
Technology Department 1 Stripping Foil and instrumentation R. Noulibos - W. Weterings – Pieter Van Trappen Technical meeting 21-mai-2014 L4 – PSB - Injection.
Updated status of the PSB impedance model C. Zannini and G. Rumolo Thanks to: E. Benedetto, N. Biancacci, E. Métral, B. Mikulec, N. Mounet, T. Rijoff,
Specifications for PSB Injection System Upgrade C. Bracco, J. Abelleira on behalf of BTP Acknowledgments: E. Benedetto, C. Carli, V. Dimov, L.M. Feliciano,
Vacuum sectorisation H- Injection Some history Wim Weterings
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I: Current Situation a) Overview of TE-ABT Systems & equipment b) Naming conventions used.
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
Some ideas to optimise PSB injection chicane Wim, Brennan, Jan, Masamitsu.
PSB H - injection system commissioning J.Borburgh, C.Bracco, C.Carli, E.Carlier, B.Goddard, K.Hanke, B.Mikulec, J.Hansen, C.Maglioni, A.Newborough, D.Nisbet,
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
LIU-PSB Overview K. Hanke for the LIU-PSB Working Group K. Hanke, LIU-2011, 25 Nov 2011.
ADSR Inst.July 2009 From PAMELA to ADSR, T.Yokoi From PAMELA to ADSR Takeichiro Yokoi (JAI)
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Internal H0/H- dump M. Delonca On behalf of EN/STI Thanks to: A. Christov, C. Maglioni, S. Mathot, C. Pasquino, A. Patapenka.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Wim Weterings Remy Noulibos
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
PS2 WG Injection and extraction systems Basics and assumptions
Status of the BI Work Package in the LIU-PSB frame
Linac4-PSB 160 MeV connection readiness review
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Subject: INJECTION SYSTEM Junction LINAC4-booster
J.-L. Sanchez Alvarez(PSB-EIC)
Status of HESR 18th March Gießen Dieter Prasuhn.
LINAC4 ADVISORY COMMITTEE
ELENA installation and commissioning status
PSB injection: beam dynamics studies
Options and Recommendations for TL and Dumps
Booster ring ICL /06/14 Nicolas Chritin EN/MME Cedric Delory EN/MME
Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable.
LIU–PLI report LIU PSB meeting.
LIU-PSB Status and Outlook
TE-ABT Activities for LS2
HALF SECTOR TEST: a test for the future PSB injection
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
PSB-PS instrumentation for LIU
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Beam Injection and Extraction Scheme
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
Transfer Line for EIC.
Presentation transcript:

PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings

ABT components and related elements (Small reminder) Vertical Septum BI.SMV Beam slices are further deflected by BI.SMV septa into the BI.BVT vertical dipole to achieve the required booster beam level separation of 360mm between each ring. Proton Distributor BI.DIS System of pulsed magnets, which kick slices of the 160 MeV H - beam from LINAC4 to different vertical positions at the vertical septum BI.SMV. H - Charge-Exchange System The beam is injected through a graphite stripping foil BI.STR to convert ~98% of the beam to H +, using 4 magnets BI.BSW creating the injection bump and a 4 horizontal kickers KSW, outside the injection region, producing the painting bump. PSB Injection Region Related Control systems for all Equipment

ABT components and related elements (Small reminder) Vertical Septum BI.SMV Beam slices are further deflected by BI.SMV septa into the BI.BVT vertical dipole to achieve the required booster beam level separation of 360mm between each ring. Proton Distributor BI.DIS System of pulsed magnets, which kick slices of the 160 MeV H - beam from LINAC4 to different vertical positions at the vertical septum BI.SMV. H - Charge-Exchange System The beam is injected through a graphite stripping foil BI.STR to convert ~98% of the beam to H +, using 4 magnets BI.BSW creating the injection bump and a 4 horizontal kickers KSW, outside the injection region, producing the painting bump. PSB Injection Region Related Control systems for all Equipment Luc Thierry Remy Cedric Luis Roger & Gregor Chiara: Beam dynamics

BI line and Injection region KSW BI Line Injection Region

New Injection Region design For each ring: 4 BSW chicane magnets Undulated Inconel vacuum chambers 4 Ion pumps BTV with Camera Stripping foil unit Vacuum sectorisation Beam loss monitors Internal H 0 H - dump

Planning Wim Weterings, LIU 2013, April 12, 2013 LIU-PSB timeline for H - injection agreed by the LIU project. 77th IEFC meeting INDICO event LIU-PSB timeline for H - injection agreed by the LIU project. 77th IEFC meeting INDICO event Stripping foil Test Stand installation Q Half Sector Test Stripping foil Test Stand installation Q1 2016

Building 355 Mock-up assembly

Foil lab space near the PSB Ghislain Roy has found lab space in building 37 that BE can loan to TE/ABT for a few years (up to LS2). Office 37/R-023

List of all LIU-PSB specifications List of all LIU-PSB specifications, make sure available and in EDMS Tony INDICO , ABT LIU project review follow up

Updated list of all LIU-PSB specifications New TDR Nearly completed PSB-MSMIB-EC-0001

THANK YOU FOR YOUR ATTENTION!