PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings
ABT components and related elements (Small reminder) Vertical Septum BI.SMV Beam slices are further deflected by BI.SMV septa into the BI.BVT vertical dipole to achieve the required booster beam level separation of 360mm between each ring. Proton Distributor BI.DIS System of pulsed magnets, which kick slices of the 160 MeV H - beam from LINAC4 to different vertical positions at the vertical septum BI.SMV. H - Charge-Exchange System The beam is injected through a graphite stripping foil BI.STR to convert ~98% of the beam to H +, using 4 magnets BI.BSW creating the injection bump and a 4 horizontal kickers KSW, outside the injection region, producing the painting bump. PSB Injection Region Related Control systems for all Equipment
ABT components and related elements (Small reminder) Vertical Septum BI.SMV Beam slices are further deflected by BI.SMV septa into the BI.BVT vertical dipole to achieve the required booster beam level separation of 360mm between each ring. Proton Distributor BI.DIS System of pulsed magnets, which kick slices of the 160 MeV H - beam from LINAC4 to different vertical positions at the vertical septum BI.SMV. H - Charge-Exchange System The beam is injected through a graphite stripping foil BI.STR to convert ~98% of the beam to H +, using 4 magnets BI.BSW creating the injection bump and a 4 horizontal kickers KSW, outside the injection region, producing the painting bump. PSB Injection Region Related Control systems for all Equipment Luc Thierry Remy Cedric Luis Roger & Gregor Chiara: Beam dynamics
BI line and Injection region KSW BI Line Injection Region
New Injection Region design For each ring: 4 BSW chicane magnets Undulated Inconel vacuum chambers 4 Ion pumps BTV with Camera Stripping foil unit Vacuum sectorisation Beam loss monitors Internal H 0 H - dump
Planning Wim Weterings, LIU 2013, April 12, 2013 LIU-PSB timeline for H - injection agreed by the LIU project. 77th IEFC meeting INDICO event LIU-PSB timeline for H - injection agreed by the LIU project. 77th IEFC meeting INDICO event Stripping foil Test Stand installation Q Half Sector Test Stripping foil Test Stand installation Q1 2016
Building 355 Mock-up assembly
Foil lab space near the PSB Ghislain Roy has found lab space in building 37 that BE can loan to TE/ABT for a few years (up to LS2). Office 37/R-023
List of all LIU-PSB specifications List of all LIU-PSB specifications, make sure available and in EDMS Tony INDICO , ABT LIU project review follow up
Updated list of all LIU-PSB specifications New TDR Nearly completed PSB-MSMIB-EC-0001
THANK YOU FOR YOUR ATTENTION!