The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.

Slides:



Advertisements
Similar presentations
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Advertisements

TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
The ATLAS Pixel Detector
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Stephanie Majewski Stanford University
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
1 UA9 September 2010 test beam Si telescope hardware status Mark Raymond – 3/9/10.
Waclaw Karpinski General meeting CMS TRACKER SYSTEM TEST Outer Barrel –TOB Inner Barrel –TIB End cap –TEC TIB TOB TEC Different Geometries One.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
Commissioning and Operation of the CMS Tracker analogue optical link system at TIF with CMSSW: R.Bainbridge, A.Dos Santos Assis Jesus, K.A.Gill, V. Radicci.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
Operation of the CMS Tracker at the Large Hadron Collider
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
Michał Dwużnik, for the SCT collaboration
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
BeamCal Electronics Status FCAL Collaboration Meeting LAL-Orsay, October 5 th, 2007 Gunther Haller, Dietrich Freytag, Martin Breidenbach and Angel Abusleme.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
1 UA9 telescope first ideas Rome – 12/3/2010 Mark Raymond –
Development of radiation hard Sensors & Cables for the CBM Silicon Tracking System Sudeep Chatterji On behalf of CBM-STS Collaboration GSI Helmholtz Centre.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
GuidoTonelli /TK_GM/CERN/07_12_05 1 TIB/TID Status Report (on behalf of the INFN consortium) STATUS OF THE INTEGRATION ACTIVITY OF THE TIB/TID_FWD TIB-MTCC.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
ICHEP02 Chris Parkes ALICE m2 Pixels+Drift+Strips LHCb m2
Readout System of the CMS Pixel Detector
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Commissioning and performance of the CMS silicon microstrip detector
SIT AND FTD DESIGN FOR ILD
Planar Edgeless Silicon Detectors for the TOTEM Experiment
Tracker Outer Barrel Silicon
5% The CMS all silicon tracker simulation
Results from module testing
TIB contribution for the X5 - May 2003 Test Beam
The CMS Tracking Readout and Front End Driver Testing
Setup for testing LHCb Inner Tracker Modules
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development and Application of Semiconductor Tracking Detectors Carmel Mission Inn, California September 11-15, 2006

Pixel Detector Inner Barrel (TIB) Inner Disks (TID) Outer Barrel (TOB) End Caps (TEC) The CMS Silicon Tracker 4 layers in TIB 6 disks in TID 6 layers in TOB 18 disks in TEC S. Mersi 1.2 m 2.7 m

Carlo Civinini INFN-Firenze STD063 Silicon Strip Modules Kapton Bias Circuit Carbon Fiber/Graphite FrameSilicon Sensors Front-End Hybrid Pitch Adapter APV and control chips Kapton tails TIB Module 29 different Module Flavours All single sided sensors  double sided detectors are realized gluing back to back two single sided modules

Carlo Civinini INFN-Firenze STD064 Sensors p on n 6” wafers Inner region: low resistivity k  cm, thin 320  m Outer region: higher resistivity k  cm, thick 500  m Polysilicon resistor Biasing AC-coupled Al readout strips Si orientation Metal overhang on implant strips Single sided Thin wafers  Thin detectors (1 sensor) Thick wafers  Thick detectors (2 sensors) More than 200 m 2 of Silicon Surface 16 Sensor Designs This room is 180 m 2

Carlo Civinini INFN-Firenze STD065 Front-end Electronics APV25 PLL MUX DCU 12 hybrid designs Strips  electronics channels APV chips Bonds analog optical links 3000 km optical fibres Kapton Multilayer Hybrid circuit

Carlo Civinini INFN-Firenze STD066 Front-end Electronics APV25 Radiation tolerant 0.25  m CMOS technology Charge sensitive amplifier with  =50 ns, CR-RC shaper, 192 cell pipeline (4.8  s deep) per channel 128 channels multiplexed to 1 analog output Operation modes: Peak mode (1 sample,  =50 ns); Deconvolution mode (weighted sum of 3 samples,  =25 ns)  High Luminosity MUX 2 APV25 chips outputs onto a single differential line PLL Decodes clock & trigger signals + delay adjusts DCU Slow control data 12 bit ADC (onboard temperatures, leakage current, low voltages) AOH Analog opto-hybrid, converts the front-end analog output current to laser light All functional parameters of these devices can be down/uploaded by mean of I2C bus

Carlo Civinini INFN-Firenze STD067 Module Test The (+spares) produced modules have been tested to spot possible problems and each strip has been characterized in term of noise, short, open, pinhole etc… Information about module quality has been stored in a production database A large fraction of production has been also thermally stressed before integration on the mechanical structures

Carlo Civinini INFN-Firenze STD068 Module Test TOB noise distribution for 4-chip and 6-chip modules 400V bias (30% production) opens noisy C. Marchettini

Carlo Civinini INFN-Firenze STD069 Module Production Summary Percentage of bad strips on good modules at level of 0.05% - 0.1% Modules produced Good after assembly* Bad*% good TIB/TID % TOB % TEC % Total % * Sept. 4st 2006 (Includes also module repair) M. Krammer

Carlo Civinini INFN-Firenze STD0610 TIB Integration … how to assemble a piece of Tracker (16 half shells)

Carlo Civinini INFN-Firenze STD0611 TIB Integration Mechanical structure (with cooling pipes and precision ledges) Mount Analog OptoHybrids and Mother Cables Modules installation Tests

Carlo Civinini INFN-Firenze STD0612 Mechanical Structure Temporary fibre Holders Carbon fibre Structural part PT1000 Temperature Probes Cooling pipes Cooling precision Ledges Half shell of half barrel TIB+ or TIB- Depending on the side of the interaction point Plus Minus

Carlo Civinini INFN-Firenze STD0613 AOH and MC Mounting 2 meters long pigtail optical fibres Analog electrical signals from the module Mother Cable: Kapton circuit which provides Modules with power, clock, trigger and I 2 C data Analog Optical Hybrid

Carlo Civinini INFN-Firenze STD0614 Modules Precision Insert Each module has been mounted by hand on the mechanical structure Double sided modules, because of their complexity, need a simple mechanical tool to guide the operator’s hand The precision is anyway defined by the mechanics, no loss of precision or reproducibility in this operation Very rare accidents because of handling…

Carlo Civinini INFN-Firenze STD0615 Tests After each single module has been mounted a fast connectivity test is done (I 2 C bus scan, module identity check) When a string of modules (3) is mounted a deep test is performed: readout timing and optoelectronics optimization then pedestals and 400V bias

Carlo Civinini INFN-Firenze STD0616 Cumulative noise ADC Counts Layer 4 Backward up noise Distribution Deconvolution 400V bias Opens (0.03%) 2.1 is the cut used During module production Test to flag a noisy strip C. Genta

Carlo Civinini INFN-Firenze STD0617 Full of modules…

Carlo Civinini INFN-Firenze STD0618 Burn in All TIB half shells and TID disks were checked for possible weak components fail and for temperatures and noise behaviour A structure is fully powered and readout during this test. Runs are taken both at room temperature and at cold (C 6 F -25 o C and -15 o C), peak and deconvolution mode Same sequence as integration: timing and optogain optimization then pedestals and noise run

Carlo Civinini INFN-Firenze STD0619 Burn-in Noise Noise distribution at Burn-in of Layer4 backward up Deconvolution 400V Bias ADC counts A. Venturi M. Vos

Carlo Civinini INFN-Firenze STD0620 Building the TIB+ The TIB half shells are coupled together and then inserted one into the other (4,3,2,1 sequence) to form the barrel T. Lomtadze & A. Basti

Carlo Civinini INFN-Firenze STD0621 TIB+ Seen from the interaction point R. Dell’Orso

Carlo Civinini INFN-Firenze STD0622 Conclusions The CMS Silicon Strip Tracker Collaboration has finished the components production –O(10 5 ) complex objects (modules, electronics boards, mechanical parts, cables, fibres, etc.) tested The integration phase is now well advanced (an O(10 5 ) pieces puzzle) and the different sub- detectors (TIB/TID, TOB, TEC) will be joined together in the coming months Then commissioning and finally Physics…