MICE Spectrometer Solenoid Review A summary of P.Fabbricatore on behalf the review board Amalia Ballarino, Elwyn Baynham, Tom Bradshaw, Mike Courthold,

Slides:



Advertisements
Similar presentations
Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Spectrometer Solenoid Lead Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab MICO Meeting January 19, 2010.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
1 Technical Arguments in Favor of using the Cryomech PT-415 Cooler for Cooling the LH 2 Experiment Michael A. Green Lawrence Berkeley Laboratory Berkeley.
Spectrometer Solenoid Tech Board Schedule Discussion
MICE Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
Spectrometer Solenoid Update Steve Gourlay Steve Virostek Lawrence Berkeley National Lab Steve Gourlay Steve Virostek Lawrence Berkeley National Lab MICE.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
MICE Spectrometer Solenoid Review Some inputs for the in person meeting to be discussed at the November 13, 2009 phone meeting P.Fabbricatore on behalf.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
1 The Impact of SAS 112 on Governmental Financial Statement Audits GAQC Member Conference Call January 4, 2007 Presented by Chuck Landes, CPA.
Spectrometer Solenoid Fabrication & Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab NFMCC 2010 Collaboration Meeting University.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Review of PANDA Magnet Designs Reviewers A. Dael, D. Tommasini, and A. Yamamoto Held at GSI, th April, 2007.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Spectrometer Solenoid Overview Roy Preece 31 st January 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
CM-26 Cooler and Lead Test1 Tests of a PT415 Cooler with HTS Leads in the Drop-in Mode Michael A. Green Lawrence Berkeley Laboratory, Berkeley CA 94720,
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
Spectrometer Solenoid Documents and Review Plans Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
Spectrometer Solenoid Fabrication & Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICE Funding Agency Committee Meeting—RAL.
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
Presentation transcript:

MICE Spectrometer Solenoid Review A summary of P.Fabbricatore on behalf the review board Amalia Ballarino, Elwyn Baynham, Tom Bradshaw, Mike Courthold, and Chris White. MICE ex officio members Alain Blondel and Andy Nichols 1.Review Charge 2.Actual review process 3.Findings 4.Conclusions and recommendations

1) Review and comment on the construction, cooling and testing of the MICE Spectrometer Solenoids under construction at Wang NMR. In particular, comment on: Original thermal model for magnet including analysis and assumptions. Interpretation of the existing results on the cooling of the magnet using cryocoolers and powering of the magnet. Updated thermal analysis based on the recent testing 2) Review the proposed modifications aiming at assuring successful and reliable powering of the magnet to full current. Comment on Updated thermal model, operating margin and ability to maintain the LHe with cryocoolers. New cryo-cooler implementation and mechanical modifications to the assembly Thermal and vacuum instrumentation and diagnostics 3) Review the power supplies and the operational abilities of the magnet in relation to the expected operating modes. 4) Review the presented schedule for implementing changes and the overall magnet successful delivery schedule. Evaluate possible risks and sources of delays. Review Charge

Starting from October 5 th the committee analyzed many documents (drawings, photos, log data) related to the design, construction and tests of the two MICE spectrometer solenoids. Three phone meetings were held with the LBNL MICE team responsible for the spectrometer magnets, in a very good atmosphere of openness and friendly collaboration. Finally an in-person meeting was held in Berkeley on Nov. 18 th and 19 th. A preliminary report was written and it is available at the review web site (reporting all the review phases). The committee acknowledges the strong efforts Mike Zisman, Mike Green and Steve Virostek in providing the required information and their availability in answering the many questions asked by the committee. Actual review process

The central point identified by the committee is related to the overall thermal balance of the magnet in the turret area : at the root of the problems found with the two magnets there are three causes:

1.The current leads cause a concentrated heat dissipation, which the copper plate is not able to efficiently drain away. 2.The thermal analysis indicates that cooling of the shield could be limited due to a high thermal impedance between copper plate and shield. 3.The temperature of the Al shield is quite high (105 K measured); in contrast the calculated heat load on the shield is quite low (15 W). In fact for the magnet 2 a LN2 reservoir was implemented, directly connected to both the thermal shield and to the copper plate hosting the first stages of the cryo- coolers

For a deeper understanding of the point 3, the committee analyzed: 1.The thermal flow through the connection between copper plate and shield (resulting in 60 W from shield to copper plate) 2.The heat balance at the copper plate (resulting in W power input of unknown nature) 3.The temperature distribution on the shield as resulting from a thermal analysis done by. F Trillaud (resulting in a maximum credible thermal to the shield input of W).

Al6061-Ti Finite Element Analysis done by F.Trillaud for the shield and comparison with measured temperatures

It is not easy to reconcile the above three points unless the thermal connection between the copper plate and the shield is imputed to be highly unsuitable to transfer even a limited heat flow and, at the same time, a different ‘agent’ is causing a 50–60 W heat load. It is still unclear whether there really exists this additional 60W heat load to the copper plate or rather a lack of cooling ( bad thermal contact or poor performance of one or more coolers)

Review and comment on the construction, cooling and testing of the MICE Spectrometer Solenoids under construction at Wang NMR. In particular, comment on: The system appear to be quite complex. From design point of view a more accurate analysis would have sufficed for a better design of the thermal connection between copper plate and shield and for a better sizing of the copper plate. The additional loss of 60 W at 65K (or bad performances of cryo-coolers giving 60 W less cooling power ) is mainly a construction problem. The committee recommendation It is very important to improve Frederic Trillaud’s thermal model to take into account both the LN 2 reservoir and the additional cryocooler and apply it to predict the results of cooling down and powering up of magnet 2.

Review the proposed modifications aiming at assuring successful and reliable powering of the magnet to full current Fixes to magnet 2. Besides replacing the damaged current lead, the modification to this magnet consists in adding a 4 th single stage cryo-refrigerator with high cooling power at 50 K (172 W). The committee feels that this approach should solve the problems of magnet 2. At the moment the operating margin is unknown (Cooling power Heat 4.2K). It should be evaluated with the thermal model. It is essential that the operating margin be measured at the occasion of the magnet 2 cool down and operation, taking advantage of the cold mass heater. From a general point of view this solution is technically acceptable only because the MICE schedule demands this magnet to be operative as soon as possible

Single-stage cooler Thermal link HTS leads

According FT model … This model is not yet completely realistic but the results are confirmed by simpler computations

Fixes to magnet 1. The foreseen fixes to magnet 1 appear to be more substantial because they are aimed to directly solve what appear to be one of the main problems (i.e. the poor thermal conductance between copper plate and shield). The fix envisaged also involves the addition of a single stage cryocooler, much in the same way as for magnet 2, with the possibility to add a 4 th two-stage cryocooler if needed All these fixes seem reasonable and moving towards the rigth direction but the committee recommends to use Frederic Trillaud’s finite element thermal model for a clear understanding of the expected temperature distribution and of the heat 4.2 K

Review the presented schedule for implementing changes and the overall magnet successful delivery schedule. Evaluate possible risks and sources of delays The committee accepts the decision of the MICE LBNL team to proceed with implementation of a single stage cryocooler in magnet 2, as there is significant evidence that this should allow the magnet to operate, and the procurement of a second single stage cryocooler to be installed in magnet 1. The improved instrumentation and additional fixes to magnet 1 aimed at improving the heat transfers are welcome. The committee recommends that the test of magnet 2 be carried out to the point where the magnet operation is demonstrated, the margin of operation determined and the possible boil-off rate measured. Cool down of the magnet should be continued until the temperatures at the HTS leads fall below the operating point of 64K, and until the liquid N2 reservoir is frozen or thermal equilibrium is reached. An important milestone should be reached in January 2010 to decide whether the magnet 2 meets the specifications or not. If not, then a decision will need to be made by the MICE management to rebuild magnet 2, and proceed with magnet 1. In order to help the decisions needed in this negative case it will be very important that the tests of magnet 2 cool down and power up be carried out in such a way as to reveal as much information as possible.