Service Management Status 104 th ACCU Meeting 03 June 2014.

Slides:



Advertisements
Similar presentations
Delivering solutions Applying the Future Today - Intelligent Transport Systems (ITS) Presentation by Dr Adrian Withill Technical Director - WSP.
Advertisements

Unicenter© ServicePlus Service Desk How to manage helpdesk tickets
Conducting meetings. Why have meetings Clear and clarify confusion Deliver new information – policy issues / plans Discuss complaints from staff Interaction.
Accurate Monitoring and Real Time Tracking of Visits Complete Visitor Management Solutions A Product of Copyright © ANGLER Technologieswww.angleritech.com.
Manual Traffic Control An MTC. Traffic Control symbols/words TTM-Temporary Traffic Management MTC- Manual Traffic Controller TW 33 – Traffic Stop Go paddle.
Service Management Status 107 th ACCU Meeting 10 March 2015.
Work Zone Safety It Starts With YOU!!. 2 BOOK 7 What is NEW??? IMSA TECHNICAL EXPO October, 2014 Dave Edwards.
FIRST Training Resource – Volunteers Lead Team Queuing Regional or Championship.
Overview of New Behind the Blackboard for Blackboard Customers APRIL 2012 TM.
1. Contents I. GS Action list following the 98th meeting held on 7 December 2012 II. CERN Hotel III. LS1 i. Increased car fleet IV. Restaurant & Snack.
Service Management Status 108 th ACCU Meeting 09 June 2015.
Service Now New features for the CERN implementation November 2012.
Housing Service Review Service Report 24 November 2014.
Event Management & ITIL V3
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE’06 Conference logistics Alan Silverman – CERN IT Dept., Local Organising Committee.
CERNAccommodation Facilities (FAC) meeting A.Rozanov CERN ACCU Outlook Report on Accommodation Facilities meetings Sigurd Lettow, Catherine.
Complete Visitor Management Solutions A Product of Accurate Monitoring and Real Time Tracking of Visits Complete Visitor Management Solutions.
M. Tiirakari 9 December2009. CERN regular shuttle services CERN Hostel services and WWW booking Miscellaneous 9 December 2009 M. Tiirakari 2 Summary.
Service Management Status 106 th ACCU Meeting 02 December 2014.
What is new in SD What is New in ServiceDesk 7.1 Mark Hopper Technical Field Enablement.
30 th April 2007Stephen McAllister and Philippa Strange UKIROC Support Centre UKIROC Support Process – Key Points for Staff.
Accommodation & Hospitality Services Ops Team 1 Staff meeting 26 th February 2015 Please sign both attendance lists.
INTRODUCTIONS A TIME FOR SHARING Hello and Welcome back !
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
Service Management Status 99 th ACCU Meeting Wednesday, March 6, 2013.
CERN IT Department CH-1211 Genève 23 Switzerland t Service Management Project Status June 2010 Mats Moller IT-DI-SM.
Preparing for Winter 2011/12 Guidance Overview Stuart Low Planning Manager Scottish Govt NHSScotland Business & Performance Mgt Team.
THE UNIVERSITY OF GEORGIA Office of the Chief Information Officer Enterprise Information Technology Services Problem Management.
Lost In SAP Support Space 2014 Kristen Scheffler & Christopher Vozella - SAP Americas SESSION CODE: 0402.
Grid Security Vulnerability Group Linda Cornwall, GDB, CERN 7 th September 2005
PETER L. REICHERTZ INSTITUT FÜR MEDIZINISCHE INFORMATIK Medizinische Hochschule Hannover Utilizing Electronic Health Record Data to Determine the Health.
GTPE 04/06/15 L. Scibile 04/06/ EDMS:
Report from Accommodation Facilities meeting ACCU A.Rozanov Outlook Accommodation Facilities meeting Patrick Geeraert, Chris Onions,
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Service Management Status 102 th ACCU Meeting 04 December 2013.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Ops Portal New Requirements.
Access control and parking news 2015, 8 th September Didier Constant – Rui Nunes GS-DI – GS-ASE 8 September 2015 ACCU.
CERNAccommodation Facilities (FAC) meeting A.Rozanov CERN ACCU Outlook Accommodation Facilities meeting Sigurd Lettow, Matti Tiirakari,
GS CERN GS Department CH-1211 Genève 23 Switzerland CSC for Service Owners How to use the CERN Service Catalogue maintenance tool.
Agriculture, Human and Natural Resources Information Technology, Virginia Tech United States Department of Agriculture Peer Panel Meeting July 8-9, 2004.
Service Management Status 101 th ACCU Meeting Wednesday, September 11, 2013.
M. Tiirakari 1 9 September CERN Hostel Service 2 As requested by ACCU and the Management -Implementation of the WWW booking -New deals with hotels.
SMB Service Status 111 th ACCU Meeting Tuesday, 8 march 2016.
Estate MANAGEMENT. Estate MANAGEMENT Holistic solution to manage residential villages and estates. Developed by Impro.
© CGI Group Inc. CONFIDENTIAL Maximising Resources A Shared Approach Leighton Davies September 2015.
ACCU Report News and User Issues Darin Acosta (Non-Member State representative) U.S. LHC Users Meeting, Oct.20, 2012ACCU Report ~ Darin Acosta 1.
Travel Plan training Rob Sage Active Travel manager, Sustrans Cymru.
Using existing lifts in existing buildings to evacuate disabled persons Derek Smith Technical Director UK Lift and Escalator Industry Association.
1.CERN Hotel 2.Mobility 3.Storage 4.Hazardous waste 5.Green spaces 6.AOB 2 Contents.
Encouraging Cycling in London – A Lambeth perspective Dawn Rahman: Transport Policy Manager.
Work Place Transport. Members of the BPF Health & Safety Committee.
Service Management Status 105 th ACCU Meeting 09 September 2014.
I.GS Action List following the 96 th meeting held on 15 June 2012 II.CERN Hotel III.Shuttle IV.Bicycle entries V.NOVAE snack service improvement VI.Parking.
1.CERN Hotel 2.Mobility 3.AOB 2 Contents B. 38 (In progress) 1.Formulate and implement a safety plan for the whole building (In progress); Replacement.
How does McKesson Support the Electronic Staff Record in Wales? Fiona Gregory Head of ESR Customer Relations McKesson 25 th April 2013.
The Help Desk is Dead; Long Live the Service Desk A presentation and discussion of the ongoing Service Management approach to assisting students, faculty.
Housing Service Review Service Report 1 June 2015.
Oak Grove Elementary Afternoon Pick UP Directions
SMB Service Status 113th ACCU Meeting
SMB Service Status 114th ACCU Meeting
89th ACCU Meeting 8th September 2010
SMB Service Status 115th ACCU Meeting
Mobility service Presentation to EN
SMB Service Status 117th ACCU Meeting
SMB Service Status 116th ACCU Meeting
SMB Service Status 112th ACCU Meeting
Health & Safety Team | Edinburgh Napier University
Health & Safety Team | Edinburgh Napier University
Efforts to reduce speeding in Mulmur
Administrative and security issues
Presentation transcript:

Service Management Status 104 th ACCU Meeting 03 June 2014

Agenda Service Report (Performance, Availability, Customer Satisfaction, Complaints) Hotel capacity over summer Hotel policy for school children Report on ‘projects’ Library upgrade Accident prone areas Soft mobility (entrance prevessin, and path to prevessin) Parking reception area Information security (password reset campaign)

Service Report Reminder: we have Service Portal & Service Desk (single point of contact, 77777) Service Manager On Duty (SMOD) Service Status Board (news and information on service changes and interruptions planned and unplanned) Feedback (and Surveys) (is actively followed up) Complaints process

Service Management Trends 4 Service Desk acts on ~8k tickets/month ~ 50% Excluding ‘monitoring’ generated tickets 2011 Total77, Total124,926+62% 2013 Total159,871+28% 2014 ‘Forecast’176,616+10%

Service Reporting ~4000 tickets resolved per week (stable) Backlog ~5500 tickets up 10% (Backlog = snapshot of work that remains to be done)

Service Reporting Negative feedback systematically followed up on We are determined to get more feedback (by simplifying the process) to generate more meaningful metrics, to enable improving the services

Service Reporting (New) Service Level Status (SLS) NOW

Service Reporting (New) New Service Level Status (SLS) indicators available shortly (for IT services at first) SOON

Service Reporting (New) Integrated with service catalog Can be used by all services that wish/can use it SOON

Hotel capacity 2014 difficult year because Capacity down: 70 rooms (80 beds) not usable due to bad state of top floors building 38 renovation planned Sept 2014  Sept 2015 (25 rooms are can be used if really urgent until September) Trend in number of students (rising) LS1 still ongoing Status 27/05/2014Hotel CERNFoyer Schumann Juin88%87% Juillet98%99% Aout86%84% Septembre79%63% Capacity Assignment Capacity Hotel / Foyer

Hotel capacity continued Staff does it’s best to accommodate everyone

School CERN Hotel Reduce impact on capacity for other users

School CERN Hotel Rules clearly specified in Booking Form

School CERN Hotel Reduce risk of disturbance

School CERN Hotel AND it works!

Library project Planning of the removal/reorganization of work places has started to free up the space for the library extension. This will take about one year to be carried out. Once the people have been moved, the project will take about an additional 3 months

Accident prone areas First action in June: provisional reconfiguration roundabout restaurant 2. Not yet validated, unapproved DRAFT under discussion

Accident prone areas Traffic lights exit Prevessin: Long term not in our control, short term.. Cycle path  Prevessin Contact between CERN new mayor Prevessin planned. The recent elections and change of team in Prevessin will likely result in some delay. See ACCU meeting 11/09/2013

Bike + pedestrian entrance Prévessin Route du Maroc, close to 864, also easily accessible from the bus stop (line ‘O’) The installation is progressing well Available in June.

Parking Globe/Reception area Parking opened 2 nd of May Until the end of September 2014 (60 th anniversary), both the new parking and the “old” parking des drapeaux are opened The Parking du Globe will be dedicated to the 60 th anniversary during the 60 th anniversary event and won’t be accessible to users during this period (this implies that only the parking des drapeaux will be opened) After the 60 th anniversary (October), definitive closure of the parking des drapeaux in order to start the works of the “Esplanade des Particules”. Only the globe parking will be accessible. This corresponds to ~200 more places compared to the situation of April Access rules are the same as for the Parking des Drapeaux, with automatic plate recognition. Cars registered at CERN can enter without restriction (as well as P+R cars – list provided by the “Fondation des Parkings”). CERN Visitors have to declare their car at the reception. Otherwise, they will be blacklisted.

Entrance in B33 Sorry for not announcing this change Triggered by incidents and safety issues (observation of large number of people entering outside working hours without badging) Decided in extended directorate New solution requires badging No ‘tourniquet’ Capacity 30 people/min Operational ‘TODAY!’ Concerning flow control, Various preliminary ideas being considered Maybe something for a future ACCU

Many thanks for your attention!