Well Development and Efficiency Groundwater Hydraulics Daene C. McKinney.

Slides:



Advertisements
Similar presentations
Sources of water (RAIN)
Advertisements

Well Development and Efficiency Groundwater Hydraulics Daene C. McKinney.
Chapter 14: Well-Performance Tests
Environmental Drilling By: Josh Humphreys October 8,2006.
Plugging Abandoned Wells in Unconsolidated Formations.
CONSTRUCTION OF SOIL NAILING WALLS
Trinity Glen Rose Groundwater Conservation District Monty McGuffin, Santos Tovar and Jim O’Connor Resource Compliance and Protection Department March 10,
Terra Slicing Technology Overview.
Sediment – Causes & Prevention Improving Water Quality- Well Rehab & Downhole Camera Applications Michael L. Vaught, PG Hydrogeologist Certified Well.
The specification states that you need to be able to: The specification states that you need to be able to: Define and explain the following terms: Define.
Warm Up Think about where water comes from. Is there more or less water on Earth than there was 1 billion years ago?
Lesson 14 Jet Bit Nozzle Size Selection
Drilling Engineering – PE 311 Drill Bit Optimization
Drilling Methods Rotary rigs –Most-used method for deep production wells –Uses a fluid (mud, water or forced air) to carry drill cuttings to surface Hollow-stem.
GEOTHERMAL DRILLING James C. Witcher Witcher and Associates
PETE 203 DRILLING ENGINEERING
WASH Cluster – Emergency Training GWD GWD4 1 1 Groundwater Development and Drilling Session 4 Developing Groundwater Sources.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Welcome Domestic Well Owners Workshop Sponsored by The Nevada Water Resources Association Spring 2011.
Groundwater Math Math for Water Technology MTH 082 Lecture 2 Well Drawdown, Well yield, Specific Capacity, Well Disinfection Course Reader Week 2 Chapter.
Groundwater. In the U.S. we use: 400 million gallons of water a day to drink 450 billion gallons of water a day in our homes, agriculture and industry.
Principles of Liquid Flow through Pipelines
Soils Investigation Soil Investigation
Basic Hydraulics Irrigation.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Core Ag Engineering Principles – Session 1
Drilling String Design
Drilling operation to get subsurface data. Why subsurface drilling is needed? As we cant look into subsurface directly, drilling is done to bring the.
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
Sources of water (RAIN)
Well Design PE 413.
The Islamic University of Gaza Faculty of Engineering Civil Engineering Department Water Resources Msc. Groundwater Hydrology- ENGC 6301 lecture 4.
Monitoring Well Post-Installation Consideration By: Pierre-Orly Dupont.
Radial Flow at a well Removal of groundwater faster than it can flow back lowers the water table near the well. The GWT becomes a radially symmetrical.
Water Supply Development Mike Kizer OSU Extension Irrigation Specialist.
Hydrology & Water Resources Engineering
CHAPTER SEVEN Groundwater
Pavement Analysis and Design
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
- Water beneath the Earth’s surface in sediment and rock formations.
CAISSON FOUNDATION.
Ground Water. Ground water: the water that lies beneath the ground surface, filling the porous space between igneous and sedimentary rock, and filling.
ME31B: CHAPTER EIGHT DESIGN OF EXTERNAL FACILITIES TWO: GROUNDWATER, BOREHOLES AND WELLS.
Introduction: Excavations and other engineering constructions in the ground are central to many civil and mining projects. Ground reinforcement includes.
Introduction to Energy Management
The specification states that you need to be able to: The specification states that you need to be able to: Define and explain the following terms: Define.
2015 International Petroleum Environmental Conference
ARTIFICIAL LIFT METHODS
GOVERNMENT ENGINEERING COLLEGE, BHARUCH (014) Chemical Engineering department SEM-iii Sub: fluid flow operation topic: orifice meter & rotAmeter Guid by:
Location and construction of water wells
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Home Water Supply Basic Facts a Homeowner Needs to Know
An introduction to Private Water Systems
Overview of Petroleum Industry Chapter 4B – Drilling Operations
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
CASING.
Mansour Khost KAC President Water and environmental specialist.
Introduction: Excavations and other engineering constructions in the ground are central to many civil and mining projects. Ground reinforcement includes.
Cementing How it is Done
SUSTAINABLE DRILLING OF OIL & GAS WELLS
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Assoc. Prof. Dr. Tarkan Erdik
Drilling Rig Accessoires and Tools
Water Wells Unit 4.
CONSTRUCTION METHODS & TECHNOLOGY
The Islamic University of Gaza Faculty of Engineering Civil Engineering Department Water Resources Msc. Groundwater Hydrology- ENGC 6301 Section 2:
Section 1: Water Beneath the Surface
Ground Water Write EVERYTHING in Orange
Large Air Systems – Sales Training
Presentation transcript:

Well Development and Efficiency Groundwater Hydraulics Daene C. McKinney

Introduction Well Drilling – Augers – Cable Tool – Rotary – Mud Well Completion – Unconsolidated formations – Consolidated Formations – Well Screens – Gravel Packs Well Development – Well Drawdown – Well Losses – Specific Capacity – Step Drawdown Test – Well Efficiency

Domestic Hand Pumped Well Domestic dug well with rock curb, concrete seal, and hand pump ~20 m depth > 1 m diameter < 500 m 3 /day Hand dug well in Trets, France Hand dug well in Beirut, Lebanon

Augers Hand-driven augers ~15 m depth > 20 cm diameter Power-driven augers ~30 m depth > 1 m diameter

Power Auger Auger drilling is done with a helical screw driven into the ground with rotation; cuttings are lifted up the borehole by the screw ~ 30 m depth < cm diameter < 500 m 3 /day

Drilled Well - Cable Tool Traditional way of drilling large diameter water supply wells. The Rig raises and drops the drill string with a heavy carbide tipped drill bit that chisels through the rock and pulverizes the materials. 8 – 60 cm 600 m

Mud/Air Rotary Rotary drilling relies on continuous circular motion of the bit to break rock at the bottom of the hole. Cuttings are removed as drilling fluids circulate through the bit and up the wellbore to the surface.

Drilling Mud Circulation Lift cuttings from the borehole and carry to pit; Cuttings drop out in the pit; Length of drill pipe is added; Film on the borehole wall prevents caving; Seals borehole wall to reduce fluid loss; Cools and cleans bit; and Lubricates bit, bearings, mud pump and drill pipe.

Well Completion After drilling, must “complete” the well – Placement of casing – Placement of well screen – Placement of gravel packing – Open hole

Well Construction Well casing – Lining to maintain open hole – Seals out other water (surface, formations) – Structural support against cave-in

Well in Limestone Surface casing – From ground surface through unconsolidated upper material

Well in Unconsolidated Aquifers Pump chamber casing – Casing within which pump is set

Well in Consolidated Aquifer Cementing – Prevent entrance of poor quality water – Protect casing against corrosion – Stabilize formation

Placing the Pack

Well Design, Completion and Development Gravel Pack – Installed between screen and borehole wall – Allows larger screen slot sizes – Reduces fine grained sediment entering Development – Washing fines out of the aquifer near the well – Cleaning the well with water – Air-lifting, surging, pumping, or backwashing

Well Screens Head loss through perforated well section – Percentage of open area (minimum 15%) – Diameter depends on well yield and aquifer thickness – Entrance velocities must be limited V s = entrance velocity Q = pumping rate c = clogging cefficient D s = screen diameter L s = screen length P = Percent open area

Well Screens May or may not be required Proper screen improves yield Slot size – Related to grain-size Other considerations – Mineral content of water, presence of bacteria, and strength requirements – Excess convergence of flow Groundwater and Wells, Driscoll, 1986

Well Development After completion, wells are developed to increase specific capacity and improve economic life. Remove finer materials from the formation. Pumping Surging Compressed air

Pumps Shallow Wells – Hand-operated – Turbine – Centrifugal (shallow, high volume) Deep Wells – turbine, submersible turbinesubmersible Motor

Well Diameter vs Pumping Rate (max 5 ft/sec in casing) Well CasingWell Yield (in. ID)(gpm) Groundwater and Wells, Driscoll, 1986

Drawdown in a Well Drawdown in a pumped well consists of two components: Aquifer losses – Head losses that occur in the aquifer where the flow is laminar – Tme-dependent – Vary linearly with the well discharge Well losses – Aquifer damage during drilling and completion – Turbulent friction losses adjacent to well, in the well and pipe

Well Losses Excess drawdown due to well design, well construction, or the nature of the aquifer Note UNITS!

Specific Capacity Specific capacity = Q/s w – Yield per unit of drawdown – gpm/ft, or m 3 /hr/m Drawdown in the well Specific capacity - linear function of Q Observing change in s w as Q is increased – select optimum pumping rate

Step Drawdown Test To evaluate well losses Pump a well at a low rate until drawdown stabilizes Increase pumping rate Pump until drawdown stabilizes again Repeat at least three times

Step-Drawdown Test Q (m3/day)S (m)

Step Drawdown Test Plot s w /Q vs Q Fit straight line Slope = a 1 = C Intercept = a 0 = B

Step-Drawdown Test (Example) Q (m3/day)S (m) C = 1.6x10 -6 day 2 /m 5 = 3.32 min 2 /m 5 Severe deterioration or clogging

Losses: Formation, Well, Total

Well Efficiency Specific capacity = Q/s – Relationship between drawdown and discharge of a well Describes productivity of aquifer and well Specific capacity decreases with – Time – Increasing Q Well efficiency = ratio of aquifer loss to total loss

Summary Well Drilling – Augers – Cable Tool – Rotary – Mud Well Completion – Unconsolidated formations – Consolidated Formations – Well Screens – Gravel Packs Well Development – Well Drawdown – Well Losses – Specific Capacity – Step Drawdown Test – Well Efficiency

Spring Box

Wellhead Protection Grout seal, concrete slab, and well seal for sanitary protection.

Well Design, Completion and Development Well diameter – Dictated by size of pump – Affects cost of the well – Must ensure good hydraulic efficiency Well depth – Complete to the bottom of the aquifer More aquifer thickness utilized Higher specific capacity (Q/s, discharge per unit of drawdown)

Collector Well Sonoma County Water Agency collector well along Russian River near Wholer Bridge. The water agency operates five similar wells on the Russian River. All use the Raney design with laterals extending beneath the river bed in a radial pattern from the main caisson. Each of these wells are capable of producing between 15 and 20 million gallons of water per day. The river water is naturally filtered as it moves through the river bed sediments to the collector wells.

Specific Capacity Map

Pumping System