Loading stave 4000  Receiving test of modules : No problem despite some damages at one edge of few modules (AMS) One MCC failure in one module, reworked.

Slides:



Advertisements
Similar presentations
Electrical and thermal testing at Glasgow and Liverpool.
Advertisements

Z x 725 Sensor Mark 140 x Sensor Coordinates Bump Bond Pad Ø = 12/ FE PAD#2 110 x 210 LM Structure FE Chip Coordinates Bump.
Lab 10 : Arithmetic Systems : Adder System Layout: Slide #2 Slide #3 Slide #4 Slide #5 Arithmetic Overflow: 2’s Complement Conversions: 8 Bit Adder/Subtractor.
Introduction to Culinary Arts
Be prepared before it happens!! Have procedures and policies in place before you have to respond to a retrieval. Training- Have personnel that are.
Stave -1 status and other reports Stave Loading Meeting, November 8 th 2011 G. Barbier, F. Cadoux, A. Clark, D. Ferrère, C. Husi, G. Iacobucci, A. La Rosa,
QUAD MODULE TESTING 18 th January 2013 Kate Doonan University of Glasgow.
Vertex 2002, Kailua-Kona Tobias Stockmanns, Universität Bonn1 Serial Powering of Pixel Modules T. Stockmanns, P. Fischer, O. Runolfsson and N.
Stave loading with Si-heaters at UniGe with jigs v-1 August 2011 Maarten, Coralie, Franck, Didier.
Validation and Verification Today will look at: The difference between accuracy and validity Explaining sources of errors and how they could be overcome.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
1 Research Objectives Develop non-contact, non-destructive, low cost, fast, accurate, high resolution and automated system for evaluating quality of solder.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
Status and outlook of the Medipix3 TSV project
July 10, 2003M. Garcia-Sciveres -- Module Assembly & Test1 WBS (& W.B.S & Services) Pixel Module Assembly & Test 1.Technical Status.
1 IC Wafer Thinning Desired thickness goal for front-end ICs on modules is 150  Prototype results obtained so far have used mechanical thinning(grinding)
Fabian Hügging – University of Bonn – February WP3: Post processing and 3D Interconnection M. Barbero, L. Gonella, F. Hügging, H. Krüger and.
10/03/2005 V.Kostyukhin 1 # Raw survey data file. # # All coordinates are in SURVEY reference system # assuming that stave is placed horizontally on flat.
LSU 09/12/2013Electronics - SkeeterSat1 Building SkeeterSat Inventory Components  Identify components Use the parts list and assembly manual  Tape to.
From hybrids pixels to smart vertex detectors using 3D technologies 3D microelectronics technologies for trackers.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
Module Flex status. 4 types: M4, M2, M1plane, M1mountain. constraint: components and bonding on the same side → folded wing geometry of the flex module.
P. Riedler- GGT Meeting 3/4/20061 Status of Sensor Irradiation and Bump Bonding P. Riedler, G. Stefanini P. Dalpiaz, M. Fiorini, F. Petrucci.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
SOLDERING is the process of bonding together two or more metal parts with a thin alloy or soldering lead. Soldering is accomplished by heating the metals.
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
CERN, CT Workshop, ID Week, July 2 nd, 2007 Problems and solutions during the integration. Unconformities in the detector Claudia Gemme, CERN - INFN Genova.
Chapter 1 The Requirements Problem
M. Gilchriese Sector Status Module Loading Task Force Meeting November 25, 2004.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
Stave 4028 Thermal tests Electrical tests. 4028: THERMAL TESTS We have studied the effect of the liquid speed on the modules heating. Test 1: all 13 modules.
Genova Site - Report at SQTF G. Darbo - INFN / Genova SQTF, January 2005 Genova Site Report C.Gemme, G. Darbo, V.Kostyukhin INFN / Genova Copy of.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Valencia Report 5 Pre-qualification (2 mechanical + 3 electrical) All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity.
US stavelet update 12th April PPB2s on serial power side 12 Apr SAMTEC connector (floating) Bond pad (connected to EoS through WB + bus tape.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Opener Find the volume of each prism. 2) 3) 3 cm 4 cm 5 cm 5 yd 4 yd 7 yd V = 30 cm 3 V = 70 yd 3 1) 4 in 3 in 12 in V = 144 in 3.
Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
MM Status Mostly unchanged (Feb. 3 rd 2016). Parts Mildly modified bridges, allowing to actually move 130nm pickup tools along r*phi –Turned out to be.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Session 2: Cutting and Shaping Tools; Other Common Hand Tools
Safety Makerspace at Tyndall.
Study of Indium bumps for the ATLAS pixel detector
ATLAS pixel module assembly flow
Stave 4008 Z rubyballs coordinates
Sector 002 Assembly status report
The Best Way To Sharpen a Knife
Ladder Assembly All tools and jigs produced Glue dispensing works
Chapter 21 More About Tests.
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
Preproduction Status & Results
Nikhef/Bonn LepCol meeting
Grinding Edges Square & Parallel
Hybrid & Module Electrical Testing
Mean positions should be shifted by ~50m
Correct Procedures for Changing, Storing, and Maintaining Saw Blades
Presentation transcript:

Loading stave 4000  Receiving test of modules : No problem despite some damages at one edge of few modules (AMS) One MCC failure in one module, reworked at Bonn  Preparing modules : Flex cutting tool (with Charlie’s blades) seems OK : We never obtain a really straight line but distance between detector and flex edge ranges between µm (correct). Few modules with test wire-bond still there. Measure of detector current just after flex cutting for each module  Loading : 2 problems : 1 “human” mistake : One module fall down (few cm) after picking up by the robot (vacuum problem was detected but ignored). These module has been retested (digital) before mounting it again (Module M6C) (Tool needed to handle a module for testing it without support)

Loading stave 4000 (con’t) Flex bow on one module : These defect, undetected before loading, induces an increase of the force applied by the robot during pick-up (from 10gf to 80 gf). (The module behaves as it was thicker ). We decided to load it without further test.(M3A)

Loading stave 4000 (con’t) Chip #15  Electrical tests after loading: Module M6C : More damaged bumps chip 0 and 15 (34 total) Module M3A (the one with bow): 1 chip missing in test register +digital Inspection of WB: very difficult Other ones : Few less significant differences except on module Unc-Bumps on this module : Flex =0 Received=46 Load=105 (mainly on chip#3)

Thermal tests Module with flex bow Mean DT/W

Loading stave 4000  Survey : Completely done : One misalignement (300 µm) has been detected between the 2 sides of the stave. Seems to be due to misalignement of the stave in the loading robot : To be more carefully checked during prod  Burning and post-burning tests : to be done after stave survey in 3 sites