LHC Collimators Phase 2 - Visit to Plansee 28th August 20081 Materials for Phase II collimators.

Slides:



Advertisements
Similar presentations
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Advertisements

WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
Status of R&D and Beam Plans for Low-Impedance Collimators F. Carra 1,2 A. Bertarelli, R. Bruce, A. Dallocchio, M. Garlasché, L. Gentini, P. Gradassi,
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Specification Meeting – 7/11/2008 Phase II Collimators: design status, options and future outlook.
ZTF Cryostat Finite Element Analysis Andrew Lambert ZTF Technical Meeting 1.
First TBL PETS prototype tank development D. Carrillo, E. Rodríguez, F. Toral, CIEMAT N. Chritin, S. Doebert, I. Syratchev, CERN CERN, 24/01/2008 Courtesy.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Cavity support scheme options Thomas Jones 25/06/15.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
A. Bertarelli, A. DallocchioLHC Collimation Phase II – Conceptual Review 02/04/2009 Phase II Collimators at CERN: design status and proposals LHC Collimation.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
A. Bertarelli – R. Perret CERN TS – MME Group 1 CERN European Organization for Nuclear Research Mechanical Engineering and Thermo-mechanical.
CERN-SLAC meeting June, The LHC Collimator Project LHC Collimators for Phase 1 CERN-SLAC meeting – June, Palo Alto, Ca Alessandro Bertarelli.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
BNL Irradiation Facility Use Collimator Materials for LHC Luminosity Upgrade.
A. Bertarelli, A. DallocchioEuCARD/ColMat Kick-off Meeting 17/06/2009 EuCARD/ColMat Kick-off Meeting EuCARD/ColMat Kick-off Meeting 17 th June, 2009 A.Bertarelli,
Vacuum, Surfaces & Coatings Group Technology Department 4 h May 2015 R. Kersevan, C. Garion, V. Baglin2 Preliminary Design of the HL-LHC Shielded Beam.
Cavity support scheme options Thomas Jones 25/06/15 1.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
S. Atieh EN-MME Manufacturing R&D for SPL β =1 cavities at CERN on behalf of the SPL cavities mechanical design and manufacturing team.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
Beam Vacuum Interconnect Design Options Ray Veness.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Phase II Collimators: design status, options and future outlook LHC.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
SPS High Energy LSS5 Thermal contact & cooling aspects
First Wall Panel - Overview
on behalf of the Phase II Collimation Design team
EuCARD Status: September 2010.
Status of material tests
LARP Phase II Secondary Collimator RC1
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Local Supports for Inclined Layout: CERN Update
Preliminary Y-chamber specifications – First draft
Cedric Garion, TE-VSC-DLM, WP12
Dump Core Studied Design Solutions
Thermo-mechanical simulations jaws + tank
Niklas Templeton – STFC – UK Collaboration
TCTW Collimator Design F. Carra1,2 A. Bertarelli, M. Garlasche, L
Diamond based Composites for Collimators Contribution to EuCard
EuCARD 1st Annual Meeting
2th EuCard Col/Mat WP Meeting
Recommendations of 12/16/05 review committee & SLAC response
23 April 2012 Tom Markiewicz/SLAC
Phase II Collimators : design status
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
Presentation transcript:

LHC Collimators Phase 2 - Visit to Plansee 28th August Materials for Phase II collimators

LHC Collimators Phase 2 - Visit to Plansee 28th August Rib Stiffener, why molybdenum Active part where most of heat is deposited tends to deflect due to thermal gradient Stiffener linked in a midpoint to limit deflection of the active part X-deflection simulation Stiffener material requirements: Minimise own thermal distortion Low CTE High thermal conductivity Minimise deflection by the force in the midpoint link High Young’s modulus Shafts, fixed points Link

LHC Collimators Phase 2 - Visit to Plansee 28th August Stiffener, why molybdenum Al-C-fiber composites

LHC Collimators Phase 2 - Visit to Plansee 28th August Stiffener made of Mo, old monolithic version

LHC Collimators Phase 2 - Visit to Plansee 28th August Stiffeners made of Mo, assembled by bolts and pins How are the stiffners Long plates 15 x 47 x 1100 mm³ Thinner extremities Circular holes and slots Tolerance ~0.1 mm Threaded holes for cooling clamps Spacers Positioning system Bolts and pins

LHC Collimators Phase 2 - Visit to Plansee 28th August Stiffener, raw material Overall dimension of long plate (mm) –≥15 x 47 x 1100 Standard dimensions by Plansee –12.7 x 500 x 600 –20 x 500 x 600 Possibility of having customized production Ideas to make it out of standard dimension plate for prototypes (4÷8 plates), eventually for series (~250 plates) –EB butt weld –Connect overlapped plates, bolted or riveted Also –Spacers –Positioning system –Bolts and pins EBW

LHC Collimators Phase 2 - Visit to Plansee 28th August Stiffener, machining Recommended machining parameters Plansee as possible supplier of finished components –Tolerances achievable Extremity holes Positioning system elements –Do you see any other issue not mentioned?

LHC Collimators Phase 2 - Visit to Plansee 28th August Cooling coil, interest of using molybdenum Phase 1, implemented solution:Phase 2, increased energy deposition. -Cooling capacity has to be increased - 6 x tubes ID8 mm - reduce contact thermal resistance -Geometrical stability has to be maintained - use material with optimised k/CTE Ideal solution: Cooling coil back-casted in M-CD block C-C GlidCop CuNi Brazing Contact

LHC Collimators Phase 2 - Visit to Plansee 28th August Cooling coil, interest of using molybdenum Cooling coil material for Ideal solution requires –Metallurgical compatibility with metal of the block Avoid dissolution of the coil in the liquid metal Avoid inconvenient inter-metallic phases at the interface –CTE matching with M-CD Avoid distortion, residual stresses or debonding at the interface when solidifying and cooling from infiltration temperature Gaps at the interface leads to poor thermal conduction and virtual leaks –Feasibility of the coil Cooling coil materials believed to be good candidates from the first two points of view –For Cu-CD: molybdenum, niobium, tantalum –For Al-CD: zirconium (preliminary test program is in progress in cooperation with L. Weber EPFL including also stainless steel)

LHC Collimators Phase 2 - Visit to Plansee 28th August Cooling coil, interest of using molybdenum Molybdenum coil in Cu-CD block –CTE –Phase diagram –Feasibility of the coil Cu-CD Al-CD

LHC Collimators Phase 2 - Visit to Plansee 28th August Cooling coil, interest of using molybdenum Liquid Cu would dissolve Ti or Zr tube !

LHC Collimators Phase 2 - Visit to Plansee 28th August Cooling coil, interest of using molybdenum Mo, Nb and Ta have limited solubility in liquid Cu and do not form inter-metallic phases

LHC Collimators Phase 2 - Visit to Plansee 28th August Cooling coil, interest of using molybdenum Feasibility of long intricate coil is a question mark. –ID 8 mm x L 3800 mm –Bending radius as small as 18 mm Tests and trials –Tensile test at RT on molybdenum tube OD10xID8 (our CA ) Rp0.2 = 570 MPaRm = 685 MPa A ≥ 40% !!! but transversally very low ductility Inner wall of the tube is oxidised –Bending tests to be done at CERN workshop What are your recommendations? –Butt welding, your recommendations

LHC Collimators Phase 2 - Visit to Plansee 28th August Avoid virtual leaks (confined volumes with low aperture that make long time to evacuate) Avoid any welding or brazing between water and beam vacuum !  use of continuous seamless tube Other solutions if the last constrain can be relaxed: –Cooling circuit machined in a block, closed by brazing or welding Brazed to the main block Back-casted inside the main block –Any other? –Any experience in similar large surface brazing Cooling coil, vacuum related constrains