06/08/2005 The 2nd Mars Expedition Planning Workshop (2005) MARTIAN MOTHS: THE USE OF SIMPLE, ROBUST, SINGLE PARAMETER SENSORS TO MAP PHYSICAL CHARACTERISTICS.

Slides:



Advertisements
Similar presentations
Aeronautics airplane aileron balloon aircraft clouds 1.
Advertisements

Stephen Hu Deployment Vehicle Selection Helicopter Design Hours Worked: Team Member Stephen Hu.
International Planetary Probe Workshop 10
6. Space research and exploration of space increases our understanding of the Earth‘s own environment, the Solar System and the Universe. 4. Rapid advances.
6. Space research and exploration of space increases our understanding of the Earth‘s own environment, the Solar System and the Universe. 4. Rapid advances.
ATMOSPHERIC REENTRY TRAJECTORY MODELING AND SIMULATION: APPLICATION TO REUSABLE LAUNCH VEHICLE MISSION (Progress Seminar Presentation - 2) K. Sivan (Roll.
Principles of Propulsion and its Application in Space Launchers Prof. Dr.-Ing. Uwe Apel Hochschule Bremen REVA Seminar1.
Mars EDL CubeSat Mission Jekan Thanga 1, Jim Bell 1 Space and Terrestrial Robotic Exploration Laboratory School of Earth and Space Exploration (SESE) Arizona.
Autonomous Landing Hazard Avoidance Technology (ALHAT) Page 1 March 2008 Go for Lunar Landing Real-Time Imaging Technology for the Return to the Moon Dr.
AAE450 Senior Spacecraft Design Atul Kumar Presentation Week 3: February 1 st, 2007 Aerodynamics Team Re-Entry vehicle analysis - Lifting body 1.
UHM CanSat Team Members: Chris Ho: Team master, software Tyson Fukuyama: Hardware.
1 AE - Control and Simulation – Micro Air Vehicle laboratory Flying Robots : the MAV-lab - Delfly: 3g, 10 cm, camera - Guinness book of records - Autonomous.
Navigation Systems for Lunar Landing Ian J. Gravseth Ball Aerospace and Technologies Corp. March 5 th, 2007 Ian J. Gravseth Ball Aerospace and Technologies.
Satellite communications and the environment of space Images: NASA.
Hypersonic Reentry Dynamics Faculty Advisors Professor Mease (UC Irvine) Dr. Helen Boussalis (CSULA) Student Assistants Katie Demko Shing Chi Chan 7/12/2015NASA.
Review Chapter 12. Fundamental Flight Maneuvers Straight and Level Turns Climbs Descents.
Stephen Hu Deployment Vehicle Selection Helicopter Design Hours Worked: 98 1 Team Member Stephen Hu.
Reducing the cost of sustained operations through technology infusion April 2004 Darin Skelly NASA Kennedy Space Center Transformational Spaceport & Range.
1 TEC-MTT/2012/3788/In/SL LMD1D v1 and v2 Comparison with Phoenix Flight Data Prepared by Stéphane Lapensée ESA-ESTEC, TEC-MTT Keplerlaan 1, 2201 AZ Noordwijk.
Today’s APODAPOD  Read NASA website:  solarsystem.nasa.gov solarsystem.nasa.gov  IN-CLASS QUIZ THIS FRIDAY!!  Solar Lab, Kirkwood, Rooftop this week.
New Ash Green Primary School  System 1: Landing Confirmation  The side of the lander is covered with a touch- sensitive pad. This can detect when.
Modularly Adaptable Rover and Integrated Control System Mars Society International Conference 2003 – Eugene, Oregon.
Dhruv Patel 12th- Project manager Max Beasley 11th- Systems Engineer Trey Hargett 11th Jonathan Ford 11th Brent Higdon 11th Austin Lambert 11th Jay Chenault.
UPC TEAM Sustainable profit-making long-term plan Google Lunar X PrizeUPC Team.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
Galactic Bulge Time On Target May These charts examine the compatibility of a 500 day microlensing program with a 6 month SNe observing program.
FRR Presentation IF AT FIRST YOU DON’T SUCCEED, TRY AGAIN… AND AGAIN AND AGAIN AND AGAIN.
Passive-adaptive composite structures for unsteady fluid loading. A. Gallagher, S.W. Boyd and S.R.Turnock Fluid Structure Interactions Research Group;
What does it take to LAND on Mars? Whitney Eggers Emmett, Idaho Aaron McKinnon, Boise, Idaho Mentors: Behzad Raiszadeh, Eric Queen Whitney Eggers Emmett,
AEM 5333 UAV Search and Surveillance. Mission Description Overhead surveillance and tracking – Humans on foot – Moving vehicles Onboard GPS transceiver.
Structural Design Considerations and Airspeeds
LUNAR ROVER Concept proposal meeting Dr. Ashish Dutta Indian Institute of Technology Kanpur Kanpur, INDIA ( *** for private circulation only)
Stephen Hu Deployment Vehicle Selection Helicopter Design Hours Worked: Team Member Stephen Hu.
Mars Exploration Rover MER Surface Lifetime Presented at Landing Site Selection Workshop #3 March 26-28, 2002 J. Matijevic 3/28/02.
Mars Exploration Rovers (MER) Entry, Descent, Landing, and Deployment.
Jet Propulsion Laboratory California Institute of Technology August 4, 2015 Austin Nicholas Landing Site Considerations Related to the Potential Sample.
Autonomous Air & Ground Surveillance Unit Objectives, Preliminary Specifications, and Option Analysis.
Maple Seeds Concept Generation Group Members: Clinton Bencsik Mark Brosche Chris Kulinka Chris Redcay.
How do you land a rover on Mars? Collaboration Challenge.
STRATEGIES FOR MARS NETWORK MISSIONS VIA AN ALTERNATIVE ENTRY, DESCENT, AND LANDING ARCHITECTURE 10 TH INTERNATIONAL PLANETARY PROBE WORKSHOP June,
A White Paper on the potential for a small scale airborne system for Threat assessment, Characterization, Monitoring, and Tactical feed-back for deployment.
MICRO AIR VEHICLES. WHAT ARE MAVS(  AV’S)? Multi functional, militarily capable, small flight vehicles. size should be less than15cms. Reynolds's no.
Mars Exploration Rovers Entry, Descent, Landing and Deployment.
Basic Aeronautics Know the principles of basic aeronautics. 1. Describe the effects of angle of attack. 2. Identify the four forces of flight.
The Augustine Committee Review of Human Spaceflight Plans Committee Briefing to COMSTAC October 29, 2009 Review of US Human Space Flight Plans Committee.
Universal Chassis for Modular Ground Vehicles University of Michigan Mars Rover Team Presented by Eric Nytko August 6, 2005 The 2 nd Mars Expedition Planning.
DemoSat II Colorado Space Grant Consortium Design (EPICS) Division Colorado School of Mines Golden Colorado Critical.
Multi-Mission Earth Entry Vehicle: Aerodynamic and Aerothermal Analysis of Trajectory Environments Kerry Trumble, NASA Ames Research Center Artem Dyakonov,
AVAT11001: Course Outline 1.Aircraft and Terminology 2.Radio Communications 3.Structure, Propulsion, Fuel Systems 4.Electrical, Hydraulic Systems and Instruments.
Introduction to IWA. The IWA is based on a patented, next generation design called the Internal Wing Aircraft. The concept brings three separate wings.
SFINX Surveying Flying IN-situ eXplorer Old Dominion University
Behavior-based Multirobot Architectures. Why Behavior Based Control for Multi-Robot Teams? Multi-Robot control naturally grew out of single robot control.
Basic Aeronautics Know the principles of basic aeronautics. 1. Describe the effects of angle of attack. 2. Identify the four forces of flight. Lesson.
AIAA Student Section Meeting December 2, 2004 spacegrant.colorado.edu/ demosat Colorado Space Grant Consortium.
AAE450 Senior Spacecraft Design Atul Kumar Week 1: January 18 th, 2007 Aerodynamics Team Entry vehicle analysis 1.
A&AE 450 – Senior Design Un-pressurized Surface Vehicles, Local Science Issues and Robotic Exploration February 13, 2000 Christopher Burnside.
MARS EXPLORATION PROGRAM NSTA Robotics E-Class MARS EXPLORATION PROGRAM NSTA Robotics E-Class Sheri Klug Mars Space Flight Facility Arizona State University.
By: Kaila, Bailey, Mersades, Kimberlin, Courtney. Mission to Mars.
The History Of Space Exploration Chapter 6 Lesson 2 Page 214.
Mini Autonomous Flying Vehicle CASDE is part of the National effort to develop a Micro Air Vehicle. CASDE has chosen a Mini Vehicle, in the short term,
AAE 450 – Spacecraft Design 1 Solar Power & Docking Options Eric Gustafson 1/18/2005 Power group & docking sub-committee Solar power and autonomous docking.
SATELLITE AND SENSORS.  Satellite Characteristics Satellite Power sources Satellite Orientation Orbits and Swaths  Sensors Active Sensors Passive Sensors.
MODULAR SELF -RECONFIGURABLE MULTI-FUNCTIONAL ROBOTIC SYSTEM.
CubeSat Re-Entry Experimental System Testbed C.R.E.S.T. STK 11 This software is an orbital simulator that allows the user to examine the flight path of.
Simulation-to-Flight 1 Additional Resources:
Matching of Propulsion Systems for an Aircraft
Lockheed Martin Challenge
AAE 450: Aero-thermodynamics
IEEE ICRA 2005 Planetary Rover Workshop April 22, 2005
Rocketry Trajectory Basics
Presentation transcript:

06/08/2005 The 2nd Mars Expedition Planning Workshop (2005) MARTIAN MOTHS: THE USE OF SIMPLE, ROBUST, SINGLE PARAMETER SENSORS TO MAP PHYSICAL CHARACTERISTICS OF THE MARTIAN PLAINS Alan Drew International Space University –SSP

06/08/2005 The 2nd Mars Expedition Planning Workshop (2005)

06/08/2005 The 2nd Mars Expedition Planning Workshop (2005)

06/08/2005 The 2nd Mars Expedition Planning Workshop (2005)

06/08/2005 The 2nd Mars Expedition Planning Workshop (2005) Mission Architecture Launch rocket deploys Mars Moths into the atmosphere at a given altitude and location The Mars Moths autorotate to the ground at a set design velocity Once on the ground the robots acquire experimental data while gathering solar energy required for take of and flight. When sufficient energy for the next flight has been acquired, the Mars Moths take off and complete their next flight.

06/08/2005 The 2nd Mars Expedition Planning Workshop (2005)

06/08/2005 The 2nd Mars Expedition Planning Workshop (2005) Design Requirements (1/2) Mars Moths must withstand the deployment launch environment...must tolerate repeated impacts during landing..must tolerate the aerodynamic loads resulting from flapping motion during flight..must be of low enough mass to permit lifting by flapping wings

06/08/2005 The 2nd Mars Expedition Planning Workshop (2005) Design Requirements (2/2)..must be able to acquire experimental data..must be able to communicate data with Meridiani base outside line of sight (relays)..must be capable of completely autonomous flight, landing, take-off..must be capable of take-off and power generation regardless of landing orientation

06/08/2005 The 2nd Mars Expedition Planning Workshop (2005) Mass1.5kg Wingspan0.9m Wing Surface Area0.15m 2 Solar Panel Surface Area0.12m 2 Energy Storage Capacity2000J Design Altitude50m Design Range (per hop)25m Maximum Design Range (per day) 500m Mars Moth Initial Design

06/08/2005 The 2nd Mars Expedition Planning Workshop (2005) Mars Moth Initial Design Solar Panel Batteries Antenna Sensors

06/08/2005 The 2nd Mars Expedition Planning Workshop (2005) Mars Moth Mission Characteristics Not suitable for measurement of time- varying parameters (1 sample/location) Versatility may be added by fitting different types of instrument on the Moths Can cover very large areas in short time without constraint of land vehicle motion Area approx 5,500m 2 per moth per day. This area scales with number of moths

06/08/2005 The 2nd Mars Expedition Planning Workshop (2005) Conclusions Mars Moth may present a cheaper and more reliable source of data Data is less diverse than with rovers, however this may be improved by using several instrument types Mars Moths have significant advantages over rover technology in terms of mobility

06/08/2005 The 2nd Mars Expedition Planning Workshop (2005) Questions?