Pad HPD Proposal 3 Nov 1999 C. Joram The Pad HPD as Photodetector of the LHCb RICH Detectors  General Design  L0 Electronics  R&D: Results + Future.

Slides:



Advertisements
Similar presentations
USE OF GEANT4 FOR LHCB RICH SIMULATION S. Easo, RAL, LHCB AND ITS RICH DETECTORS. TESTBEAM DATA FOR LHCB-RICH. OVERVIEW OF GEANT4 SIMULATION.
Advertisements

The HPD DETECTOR The HPD working principles The HPD production CLUE Experiment The TOM Project The TOM HPDs LAB/Mountain HPD Measurements Michele Giunta.
Peter Križan, Ljubljana Peter Križan University of Ljubljana and J. Stefan Institute The HERA-B RICH counter.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Assisi – 23 June 2005 Tito Bellunato 1 Status of the LHCb RICH detector and the HPD Beauty 2005 Assisi – 23 June 2005 Tito Bellunato – Università degli.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
Jianchun Wang, Syracuse UniversityDPF conference, Jan 7, CLEO III RICH Detector and Test Beam Results J.C.Wang representing M.Artuso, R.Ayad, F.Azfar,
C. Joram CERN / PH International Scoping Study CERN Meeting September Development of spherical HPDs for a Water Cherenkov Detector (initiated by.
Measurement of the absolute efficiency,
Page The TORCH PMT: A close packing, multi-anode, long life MCP-PMT for Cherenkov applications James Milnes Workshop on picosecond.
Photon detection Visible or near-visible wavelengths
1 Sept 2005Paul Dauncey1 MAPS award and issues Paul Dauncey Imperial College London.
T. Sumiyoshi (TMU) 30, Nov del Carmen 1 Development of HPD (HAP D) Photon-detector for the Aerogel RICH Photon-detector for the Aerogel.
Peter Križan, Ljubljana March 17, 2006 Super B Workshop, Frascati Peter Križan University of Ljubljana and J. Stefan Institute Aerogel RICH and TOP: summary.
D.Websdale, LHCC referees meeting, CERN,  Developments since 13 May meeting  Outcome of review on 24 June  HPD planning  MaPMT planning.
May 31, 2008 SuperB PID sessionMarko Starič, Ljubljana Marko Starič J. Stefan Institute, Ljubljana Report on hardware tests and MC studies in Ljubljana.
Experimental set-up Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE Multi-Channel MCP PMTs S.Korpar a,b, R.Dolenec.
RICH detectors for LHCb Tito Bellunato INFN Milano-Bicocca On behalf of the LHCb RICH collaboration 10th International Conference on Instrumentation for.
MaPMT Readout Workshop / Introduction MaPMT Workshop Imperial College 26/27 June 2003 Franz Muheim University of Edinburgh.
HPD Performance in the RICH Detectors of the LHCb Young Min Kim University of Edinburgh IoP HEPP Conference – April
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
RF Cherenkov TOF and TOP Detectors for JLab Physics Applications A. Margaryan.
Development of the RICH Detectors in LHCb S. Easo Rutherford-Appleton Laboratory June 5, 2002 RICH2002 PYLOS, GREECE For the LHCb-RICH Group.
work for PID in Novosibirsk E.A.Kravchenko Budker INP, Novosibirsk.
LHCb VErtex LOcator & Displaced Vertex Trigger
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
R Lambert, LHCb RICHPD07, 28th June The LHCb Pixel Hybrid Photon Detectors Robert W. Lambert, University of Edinburgh On behalf of the LHCb RICH.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
Mauro Iodice INFN Roma (Italy) Hall A Collaboration Meeting - JLAB May 18, 2004.
RF source, volume and caesiated extraction simulations (e-dump)
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Particle Identification with the LHCb Experiment
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
RICH meeting, F.Muheim1 Proposal for MAPMTs as Photodetectors for the LHCb RICH Franz Muheim University of Edinburgh on behalf of the MAPMT group.
18 Sep 2008Paul Dauncey 1 DECAL: Motivation Hence, number of charged particles is an intrinsically better measure than the energy deposited Clearest with.
TORCH IOP meeting Manchester March 31, 2015 TORCH Maarten van Dijk On behalf of the TORCH collaboration (CERN, University of Oxford,
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
The RICH detectors of LHCb and the proposed upgrade Antonis Papanestis On behalf of the LHCb RICH collaboration 1.
23/02/07G. Vidal-Sitjes, VCI2007 Vienna Conference on Instrumentation1 The LHCb RICH detector G. Vidal-Sitjes on behalf of the LHCb RICH team Outline:
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
K.Wyllie, CERNIWORID 2004 Readout of the LHCb pixel hybrid photon detectors Ken Wyllie on behalf of the LHCb collaboration and industrial partners The.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Peter Križan, Ljubljana September 17, 2008 SuperB PID Peter Križan University of Ljubljana and J. Stefan Institute Forward PID: - SiPM as photon detectors.
Magnetic Shielding Studies of the LHCb RICH Photon Detectors Mitesh Patel, Marcello Losasso, Thierry Gys (CERN )
Performance of 1600-pixel MPPC for the GLD Calorimeter Readout Jan. 30(Tue.) Korea-Japan Joint Shinshu Univ. Takashi Maeda ( Univ. of Tsukuba)
The Ring Imaging Cherenkov Detectors for LHCb Antonis Papanestis CCLRC – RAL On behalf of the LHCb RICH group.
Development of RICH Detector and Large-area HPD for LHCb Experiment
Plans for this week MWPC: wire stretching today
RICH detector layout Photon detectors Performance and first data
Status of GEANT4 in LHCb S. Easo, RAL, The LHCb experiment.
5% The CMS all silicon tracker simulation
Particle Identification in LHCb
The Pixel Hybrid Photon Detectors of the LHCb RICH
Multianode Photo Multipliers for Ring Imaging Cherenkov Detectors
on behalf of LHCb RICH Group
Vertex Detector Overview Prototypes R&D Plans Summary.
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
RICH 2004 Characterization and compensation of magnetic distortions for the pixel Hybrid Photon Detectors of the LHCb RICH Gianluca Aglieri Rinella,
Development of hybrid photomultiplier for Hyper-Kamiokande
Pre-installation Tests of the LHCb Muon Chambers
Particle Identification with the LHCb Experiment
The LHCb Front-end Electronics System Status and Future Development
How can we study the magnetic distortion effect?
The MPPC Study for the GLD Calorimeter Readout
RICH 2004 Characterisation and compensation of magnetic distortions for the pixel Hybrid Photon Detectors of the LHCb RICH Gianluca Aglieri Rinella,
Presentation transcript:

Pad HPD Proposal 3 Nov 1999 C. Joram The Pad HPD as Photodetector of the LHCb RICH Detectors  General Design  L0 Electronics  R&D: Results + Future  Tube Fabrication + costs C. Joram for the Pad HPD team

Pad HPD Proposal 3 Nov 1999 C. Joram Granularity ca. 2.5 mmHigh filling factorSingle photon sensitivityRobust operationCost effectiveness LHCb RICH Requirements Large areaHigh sensitivity for E<5.5 eV LHC speed readout

Pad HPD Proposal 3 Nov 1999 C. Joram

The Design of the Pad HPD  Total (active) diameter: 127 (114) mm  69% filling factor when hex. closed pack + 3mm gap  space for mu-metal + insulation  Bialkali photocathode + UV extended borosilicate window  good compromise between  E and   chrom.  Fountain shaped electron optics  purely linear adjustable demagnification  strong E-field over full tube  robustness against magnetic fields  Work at maximum high voltage (25 kV)  large signal (ca e - )  low point spread function (  pixel error)  robustness against magnetic fields  Round Si sensor with pads of 1 x 1 mm 2  no dead space, no unused pads  pixel error matches other error sources E n

Pad HPD Proposal 3 Nov 1999 C. Joram  Analog readout electronics  full exploitation of information  continuous online pedestal determination + subtraction  can cope with common mode + other noise sources  Tube design allows to re-use all components  Tube can be manufactured by LHCb RICH group or by industry

Pad HPD Proposal 3 Nov 1999 C. Joram

L0 Electronics of the Pad HPD SCTA128 modified according to LHCb specifications.  SCTA128_LHCb  Analog readout chip in rad hard DMILL technology.  Chip is fully identical with proposed  vtx chip. SCTA128 exists and has demonstrated  peaking time  25 ns  analog multiplexing at 40 MHz  expected noise figures: pF -1  For the Pad HPD (ca. 4 pF) we expect a pedestal noise of 650e - ENC  S/N = 10   det. = 92.8% (4  cut)  Necessary LHCb modifications will be discussed under future R&D

Pad HPD Proposal 3 Nov 1999 C. Joram R&D programme of the Pad HPD Concept, design, fabrication of HPD components Test of electron optics, Si sensor, VA electronics (CsI PC) Design, fabrication, commissioning of HPD plant Development of tube processing (PC, sealing, getter) Further optimization of processing. Final electronics.  Main Results of the R&D  Difficulties and problems  Future R&D

Pad HPD Proposal 3 Nov 1999 C. Joram Main Results of the R&D Q.E. of a good HPD Summary of all cathodes produced since March 1999  Quantum efficiency of bialkali cathodes

Pad HPD Proposal 3 Nov 1999 C. Joram Comparison of lab. measured Q.E. and test beam data PC59 tested with 180 cm long C 4 F 10 radiator Expect 48 p.e. Find 54 p.e. (noise subtracted) Agreement within uncertainties Online display of single event ring  Electron Optics of the Pad HPD 114 mm active  Linear demagnification, adjustable Fit residuals  200  m

Pad HPD Proposal 3 Nov 1999 C. Joram  Electron optics with mu-metal shield 128 mm, 0.9 mm thick Linear optics not affected by grounded shield.

Pad HPD Proposal 3 Nov 1999 C. Joram  Point spread function measured on Si plane

Pad HPD Proposal 3 Nov 1999 C. Joram  Measurement in B-field (Helmholtz coil) Axial B-field, no shield Axial B-field, with shield

Pad HPD Proposal 3 Nov 1999 C. Joram A 160 mm long mu-metal shield is very effective for B  E : reduction of  by factor 12,  R/R  0 B  E: reduction of  x by factor 12 For reasonably low fields (B<10 Gauss) the shift and the rotation becomes negligible A short shield (110 mm) has been tested but found to be less efficient (only factor 3 reduction) If a long shield has to be used, a pointing geometry is possible (12% fewer tubes required) measured on Si-plane x y B Transverse B-field, For reasonably low fields (B<10 Gauss) the shift and the rotation become negligible pointing geometry

Pad HPD Proposal 3 Nov 1999 C. Joram Pedestal cut (4  ) Single pad S/N = 20 1 p.e. 2 p.e. 3 p.e. Viking VA3 chip (  peak = 1.3  s, 300 e - ENC) U C = -26 kV ADC counts  Signals on the Si sensor thanks to a thinned n + and Al layer

Pad HPD Proposal 3 Nov 1999 C. Joram  Exposure to direct charged particles Data at 0º and 25º incidence angle Photons from C-effect in window well localized  multi photon hits. Charged particles in Si sensor easily identifiable Results in agreement with Malcolm’s simulations. Analog information useful for event cleaning. C-photons from window  x =  x  1.2 mm Signals from charged particles  x  1.3 mm  Y  2.2 mm

Pad HPD Proposal 3 Nov 1999 C. Joram Difficulties and Problems Phototube fabrication is not extremely difficult, but...  we started essentially from zero  many parameters have to be precisely tuned  difficult diagnostics of ambiguous symptoms  only few trials Two problems caused significant delays  Some envelopes develop leaks during bakeout Problem understood and fixed by SVT. A good fraction of our envelopes are affected. However: All tubes can be repaired!  Some tubes with bialkali cathode do not stand full cathode voltage Problem understood but not fully fixed. K and Cs atoms adhere to impurities on glass surface.  Surface conductivity  Field distortions  atomic excitation under HV  light emission Improved (chemical) cleaning helps ! Walls can be protected by mask. To be tested.

Pad HPD Proposal 3 Nov 1999 C. Joram Future R&D  Further optimization and stabilization of the of tube fabrication process  Build tubes with final LHCb electronics Modification of SCTA analog frontend FE identical to existing ABCD chip expect 650 e- noise in Pad HPD submission still in 1999 Modifications of SCTA backend 4  s pipeline 4  32 multiplexing reduced set-up time submission by 2/2000

Pad HPD Proposal 3 Nov 1999 C. Joram In the meantime…  demonstrate vacuum operation of existing SCTA128HC  demonstrate baking of SCTA128HC Finally…  produce sealed HPD with existing SCTA128HC  produce sealed HPD with final SCTA128_LHCb R&D finished by mid 2000 !

Pad HPD Proposal 3 Nov 1999 C. Joram Tube Fabrication We considered 3 possible fabrication scenarios A)In-house production at CERN (baseline of proposal) B)Distributed in-house production (CERN + other institutes inside LHCb) c)Industrial fabrication: 1 offer available (Thomson, France), a 2 nd offer in preparation (Photek, UK)

Pad HPD Proposal 3 Nov 1999 C. Joram Our baseline scenario 240 Pad HPDs are required to be ready and tested by mid  2 new optimized fabrication plants have to be built (re-using existing special components)  4 Pad HPDs are produced per week  240 tubes can be produced in 22 months assuming  average yield of 80%  40 production weeks/yr  HPD fabrication should start by beginning of 2002 There is sufficient time to design, build and commission plants re-iterate on SCTA128 if required All technical labour is included in cost estimate !

Pad HPD Proposal 3 Nov 1999 C. Joram Cost estimate (Details will be given by Dave Websdale.) Total cost of 216 tubes (incl. encapsulated electronics) A) In-house: 2.0 MCHF (ca. 30% labour) B)Distr. in-house: unknown, could be less than A) C)Industry:3.2 MCHF

Pad HPD Proposal 3 Nov 1999 C. Joram Conclusion  The Pad HPD is a photodetector which has been coherently designed to fulfill the LHCb RICH requirements in an optimum way.  The achieved performance and the expected results of the remaining R&D phase make it an excellent candidate.  The (distributed) in-house fabrication represents a cost-effective scenario, which allows to produce all tubes well in time and still provides sufficient reserves. Many thanks to all members of the Pad HPD team, our industrial partners, and all people who generously supported us.