Federal Aviation Administration OSU & NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st &

Slides:



Advertisements
Similar presentations
3/5/14. Work is nearly complete. Containment to be removed in the coming weeks. Hourly checks on the space temperature have ensured proper environment.
Advertisements

Boiler Operation Procedures
HEAT FLUX GAUGE CALIBRATION UPDATE (CHAPTER HF DRAFT) 2014 June Materials Meeting Switzerland Materials Working Group Michael Burns, FAA Tech Center June,
Federal Aviation Administration HEAT RELEASE RATE Updates 2014 June Materials Meeting Switzerland Materials Working Group Michael Burns, FAA Tech Center.
Federal Aviation Administration Radiant Panel Updates 2014 June Materials Meeting Switzerland Materials Working Group Michael Burns, FAA Tech Center June,
Federal Aviation Administration Evacuation Slide Test Method: Round Robin 3 Results 0 Evacuation Slide Test Method: Comparison Test Results Federal Aviation.
NexGen Burner Update International Aircraft Materials Fire Test Working Group Meeting October 21, 2009 Atlantic City, NJ.
MAJOR REPAIRS AND ALTERATIONS
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised.
Problem How does the density of different woods affect how long the wood can burn?
CASE STUDY-III BOILER TUBE FAILURE. The Incident  Boiler Make: MIURA  Date: March 26, 2010  Place: At sea  Initial Indication: Frequent water being.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Discussion on Format of New Test.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised.
11-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 11 OPERATION.
OSU & NBS March Materials Meeting
 Latent heat  Sensible heat  Total heat  Specific heat.
Seat Cushion Testing Methods Fire Test FAA Hand Book Regulation Lab A Lab F Lab B Lab G Lab C Lab D Lab E.
Federal Aviation Administration AVIATION HEAT FLUX CALIBRATION STANDARD 2013 Triennial International Fire & Cabin Safety Research Conference Philadelphia,
Concept Equipment design and manufacture fire testing instruments according to international test methods. Our range of products are used to test the fire.
Federal Aviation Administration Revised Rate of Heat Release Test Method 2013 December Triennial Conference Philadelphia, PA USA Michael Burns, FAA Tech.
Federal Aviation Administration OSU & NBS Updates 2010 March Materials Meeting Boeing Facility - Renton, WA Materials Working Group Michael Burns, FAA.
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
Presentation of Findings - Dissolved Methane Method Study Shale Network Workshop May 7-8, 2015 State College, PA Presented by Rock J. Vitale, CEAC Environmental.
International Aircraft Materials Fire Test Working Group Meeting
Gage Repeatability & Reproducibility for Continuous Data Instructor’s Name.
Federal Aviation Administration Burnthrough Update International Aircraft Materials Fire Test Working Group Meeting June 17, 2009 Köln, Germany.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on New Flammability.
Presented to: International Aircraft Materials Fire Test Working Group, Atlantic City, NJ By: Robert Ian Ochs Date: Tuesday, October 21, 2008 Federal Aviation.
Federal Aviation Administration 0 Composite Wing Tank Flammability April 2-3, Composite and Aluminum Wing Tank Flammability Comparison Testing Steve.
Just a few reminders ……. Agenda  General Guidelines Types of Awards Enrollment Calculation Tool Tips  Application Document Family Homes & Group Homes.
Review of Handbook Chapters Pat Cahill
Just a few reminders ……. Agenda  General Guidelines Types of Awards Enrollment Calculation Tool Tips  Application Document Site Supports Professional.
Federal Aviation Administration Aircraft Wiring 0 Federal Aviation Administration International Aircraft Materials Fire Test Working Group Bremen, Germany.
Presented to: By: Date: Federal Aviation Administration Downloaded from How to Survive A Ramp Check Aircraft Operator Maintenance Responsibilities.
Microspectrophotometry Calibration. Calibration Calibration ensures that the instrument is functioning to an acceptable level. Before carrying out calibration.
Presented to: By: Date: Federal Aviation Administration In-Flight Burn- Through Tests Aluminum vs. composite materials Aircraft Systems Fire Working Grp.
Federal Aviation Administration Radiant Panel Test for Thermal/Acoustic Insulation 0 Federal Aviation Administration International Aircraft Materials Fire.
Federal Aviation Administration HRR 2 Development Task Group 2011 March Materials Meeting Savannah, GA Materials Working Group Michael Burns, FAA Tech.
Federal Aviation Administration OSU & NBS Updates 2009 March Materials Meeting Materials Working Group Michael Burns, FAA Tech Center March 4 th & 5 th,
Federal Aviation Administration COMPOSITE MATERIAL FIRE FIGHTING Presented to: International Aircraft Materials Fire Test Working Group Atlantic City,
Federal Aviation Administration OSU & NBS March Materials Meeting Materials Working Group Michael Burns, FAA Tech Center June 17 th & 18 th, 2008.
Presented to: IAMFTWG, Renton, WA By: Robert Ochs Date: March 3, 2010 Federal Aviation Administration NexGen Burner for Seat Cushion Fire Testing.
Eight tips for burning wood. Tip 1 Air! The wood is utilised in the best way when the draught control is fully open and the flames are intense. That will.
Background Numerous FAR’s mandate fire protection in aircraft powerplant fire zones Parts 23, 25, 27, 29, 33… FAR Part 1 Section 1.1 – Definitions and.
Federal Aviation Administration HEAT FLUX CALIBRATION STUDY 2010 March Materials Meeting Boeing Facility - Renton, WA Materials Working Group Michael Burns,
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Update Handbook Chapters IAMFT WG, Cologne,
Federal Aviation Administration 0 Composite Wing Tank Flammability November 20, Composite and Aluminum Wing Tank Flammability Comparison Testing.
Exquisite Heat For Steam Boilers. Time based system  Thermostat Demand Analysis over time will determine the length of burner fire time of the boiler.
Chemistry Lab Equipment
Federal Aviation Administration 0 Composite Wing Tank Flammability May 19 th, Composite and Aluminum Wing Tank Flammability Comparison Testing Steve.
Federal Aviation Administration 0 Composite Wing Tank Flammability May 20, Composite and Aluminum Wing Tank Flammability Comparison Testing Steve.
Tim Marker Discussion of Burnthrough Test Method for Aircraft Thermal Acoustic Insulation Blankets FAA Technical Center.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised.
Federal Aviation Administration 0 Maintenance Workshop June 9, FAA Perspective on Part 145 Repair Stations in Europe Presentation to: Europe/U.S.
Federal Aviation Administration Slide Evacuation Test Method TSO C69A 0 Slide Evacuation Test Method TSO C69A Federal Aviation Administration International.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Discussion of Full-Scale Testing of Leather.
BMC Medical Co., Ltd. Nov Training Course. 1 Table of Contents 1. CATALOGUE 2. INSTALL& DISASSEMBLE 3. SET UP.
Federal Aviation Administration 0 Composite Wing Tank Flammability May 11, Composite and Aluminum Wing Tank Flammability Comparison Testing Steve.
Federal Aviation Administration OSU & NBS Updates 2010 June Materials Meeting Koeln, Germany Materials Working Group Michael Burns, FAA Tech Center June.
Federal Aviation Administration OSU & NBS Updates 2009 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st &
U.S. General Services Administration Federal Acquisition Service Center for Transportation Management Federal Acquisition Service TSP Quarterly Meeting.
Tim Marker Round Robin 5 Test Results for Proposed Insulation Burnthrough Test Standard FAA Technical Center.
PERFORM THE TASKS AND FULFILL THE RESPONSIBILITIES OF RANGE PERSONNEL PO/EO: REF.: B-GL /TS-000, TRAINING SAFETY.
11 th Annual OSU and Smoke Round Robin Presented By Mike O’Bryant (The Boeing Co) 7/11/2006 at C&D Zodiac.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Test Cell Airflow Study For Cargo.
Federal Aviation Administration Aircraft Ducting 0 Federal Aviation Administration International Aircraft Materials Fire Test Working Group Atlantic City,
Uninterruptible Power Supply - Interrupted
Instrument Maintenance
Ensuring Reliability June 2013 Paul Beaumont.
AIRCRAFT FIRE REGULATIONS
Presentation transcript:

Federal Aviation Administration OSU & NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st & 22 nd, 2008

2 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd, Agenda 1.“Mini” European Round Robin Results 2.NBS Update Photometric System Round Robin Experimental Furnace 3.Visit To Vatell Corp. Calibration Method Recoating Techniques 4.New FAA Equipment 5.Maintenance Tips & Reminders 6.Next Steps

3 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd, Mini-Study ‘Mini-Study’ Complete –4 Labs In All –Two Honeycomb Panels S-SCCP (Brown) Marker Panel (White) OSU –Peak Heat Release Rate –2 minute Total Heat Release Rate –Time To Peak NBS –Maximum Specific Optical Density (4 Minute)

4 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd,

5 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd,

6 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd,

7 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd,

8 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd,

9 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd,

10 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd,

11 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd, NBS Photometric System Round Robin FAA Is Currently Conducting A Round Robin Check Out Of The NBS Photometric System Using Neutral Density Light Filters These Filters Provide A Linearity Check Of Five Data Points

12 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd, NBS Photometric System Round Robin No Furnace Heat Or Pilot Burner Required Zero Then Span system Gradually Slide Filter Over Lower Glass Window 12 Domestic Labs Have Participated To Date Filter Information: Edmund Optics Product.cfm?productid=1523http:// Product.cfm?productid=1523 Filters Available For International Lab Testing Within The Next Few Weeks.

13 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd, NBS Furnace NBS Furnace Upgrade –Longer Service Life Of Heating Element. Experimental Furnace Endurance Testing Progress –Incoloy Vs. Inconel –Approx. 742 Hours Of Operation –43 Cycles –28 Samples

14 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd, Visit To Vatell Corp. Calibration Method Differed From What The FAA Has Been Doing  Ramping Heat Up During Calibration Vs. Down New Study In Progress To Measure Any Differences Between Procedures Observed Re-Coating Techniques B’s (Lower Range, Most Common) Black Velvet A’s Krylon Visit To Medtherm Corp. Slated For Early 2009

15 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd, New FAA Equipment FAA Has Recently Purchased A New: OSU Heat Release Rate Apparatus – Fire Test Technology Ltd. NBS Smoke Chamber – Newport Scientific, Inc. Due To Arrive In the Next Few Weeks Facility Being Painted Installed Once Complete Original Equipment Will Remain Available For Special Testing And Occasional Training

16 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd, Maintenance Tips & Reminders OSU -Inspect And Clean Lower Air Distribution Plate On A Regular Basis -Keep The Upper Cone Walls And Chimney Clean NBS -Remember To Clean Windows Before Each Test (Top Then Bottom) -Ensure Proper Alignment Of Pilot Tubes To Sample Face

17 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd, Next Steps International Labs Who Would Like To Participate In The NBS Photometric System Round Robin Please Contact The FAA Complete Study To Measure Any Differences Between Heat Flux Gage Calibrating Procedures FAA Remains In The Process Of Updating Chapter 6 Of The FAA Handbook (NBS) Thank You For Comments On Chapter 6 Updates FAA Contact Information: Michael Burns At +1 (609)