04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC Wed 16 Sept 2015 Struggling with cryo o-night Tuesday - Wednesday 07:11 Injecting again 09:00 Dump on injection of train of 144 bunches, losses IP7.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
LHC 23 June :07: Started injection cleaning with B1. 08:13: Fault on MKI B2. –MKI Beam 2 in P8 had a breakdown at 07:49 during the SoftStart process.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Machine coordinators: R. Assmann & J. Uythoven MD coordination: R. Assmann, G. Papotti, F. Zimmermann Highlights:  v/d Meer scans:ALICE, ATLAS, CMS, LHCb.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wed 27/7 – Thu 28/7 09:00 LHC Controls problems
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Luminosity lifetime – fill 2932
Saturday 30th June - Sunday: Rocky !
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Thursday morning – optics correction
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Thursday 10th May - morning
Friday 14th December - morning
Wire almost entirely through beam before BLM triggers dump
Thu 15/9 – Fri 16/9 09:30 Controls network problem fixed The network problems have been fixed since 9:30am when the network switch for the Service IP57.
Yesterday’s morning’s controls issues
Finally.... We had to wait a long time.... We had many problems....
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Sunday
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday 24 October hours of 25ns MD
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Mon Access for switching temperature probe DFB L7.
LHC Morning Meeting - G. Arduini
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Tue/Wed 12/ :00 Probe beam back again
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Tuesday 20 September 2011.
Fri :52 Stable beams fill #2536
Coordination: Eva Barbara Holzer, Mike Lamont
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday morning / afternoon
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Presentation transcript:

04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2 until TS. The current of the other octupoles increased in functions to compensate. 10:30 Filling 1380 x  MKI resonant charging length increased. 11:48 Dumped by operator during ramp.  Losing almost all BPM crates on beam 1 13:00 Filling 1380 x :47 Dumped by operator during ramp.  Again lost orbit reading on many crates, beam 2 Tue LHC morning report

14:00 BPM investigation.  Decide to perform PS intervention on septum in the meantime.  Access Atlas and beam dump.  Restart of SIS with slightly tighter tolerances on COD trips. 16:32 Injection. BPM investigation ongoing.  When rebooting the BPM concentrators, it was observed that all the B2 front ends rebooted. This is not normal, and so we should not reboot concentrators with beam in until this issue is resolved by BI. 17:54 BPM issue solved by rebooting CS-CCR-COLSA (  report Alastair Bland). 18: b filled. 19:19 First stable beams with 1380b. New LHC record luminosity: ~5.1e33. Tue LHC morning report

Alastair Bland BE/CO

 The CPU load and memory use on CS-CCR-COLSA (Concentrator for BPMs and BLMs providing data to the YASP steering program) rose a lot from 11:30. Marek Misiowiec restarted the Injection Oscillation programs on this machine at 11:37. A few minutes later the CPU load (perhaps due to lack of memory) rose for BUNCHORBIT processes.  From 11:45 to 11:48, nineteen of the Beam1 BPM Front End Fesa servers crashed and restarted after 20 seconds.  At 11:48 Verena dumped the beam as she could not see Beam1 any more.

 A similar scenario occurred from 13:45 to 13:48 when ten of the Beam2 BPM Front End FESA servers crashed. Verena dumped the beam at 13:47.  Note that there was an unrelated event at 13:52 when the General Purpose Network Router of IT/CS for the CCC and Prevessin site crashed.  Later in the afternoon there were more problems with missing BPM data and unusual BPM response times in YASP so I rebooted CS-CCR-COLSA at 17:54 to clean up the memory.  The machine was swapping again, but less, during the injection around 18:30.

 Add more memory to CS-CCR-COLSA tomorrow, and/or during the Technical Stop next week, upgrade to a more powerful machine.  Marek says that the amount of memory used by the CS-CCR-COLSA processes is proportional to the number of bunches requested.  The reason that the BPM Fesa servers on the Front Ends crash when there is a slow client like CS-CCR-COLSA needs to be investigated.

Stable beams 1380b (114 MJ) LHC morning report

Lifetime Ramp & Squeeze & Collision LHC morning report

ALICE can still not take data ~2h after start of fill Highest pressure at VGI.514.4L2 (109 m from IP i.e. at end of 80cm diameter vac chamber in front of D2) Also left right comparison of VGI.514 gauges Seems that the increase in intensity has an effect on the e-cloud level in the large vac chambers on both sides of ALICE, but it is worth noting that for fills with 1096b the vac pressure rise decreased with number of fills Alick Vacuum conditions at Pt 2 left side LHC morning report

Left –Right Comparison Vacuum IR LHC morning report

History Last 6 Days LHC morning report

21:53 Abort gap population creeping up for B1. 22:14 Abort gap cleaning switched on. RF low level piquet checking: phase loop for beam 1 more noisy, but is this the problem? 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. TDI interlock:  The interlock treshold has been change for TDI.4R8/InterlockThresholdFunct#dump_inner_gap_upstream from to 9.27, and we don't touch position. 05:54 Stable beams, 1380b.  Again rapid debunching, this time starting much earlier in collision.  RF checking (Themis) Tue LHC morning report

B1 Issue (Debunching  RF?) LHC morning report

Abort Gap Population LHC morning report

Abort Gap Cleaning LHC morning report

First and second fill: Intensity LHC morning report

First and second fill: Lumi LHC morning report

Currently one amplifier for beam 1, vertical (ADT) down.  There is one bad tetrode in there and the amplifier has been put in an idle state by blocking both tubes with the Ug1 voltage. The result is that we have with a loss of this amplifier 25% less gain and kick strength for vertical beam 1. For me this is acceptable. The intervention has been done by Gino Cipolla on the surface in SR4 (to take out the amplifier). Ahead of the MD and the technical stop:  we from the LLRF (Daniel and myself) would like to go through all amplifiers of ADT with a test signal when there is no beam to check if there are other weak tubes that need attention before the MD or during the technical stop.  The matter is not so urgent, but still can you contact us at the earliest tomorrow a.m. for such a check when there are slots of 1 hour without beam ? ADT Issue (Wolfgang H.) LHC morning report

Thu – Fri Physics with 1380b. Sat06:00 Start of LHC MD #1 (cut short by 1 day) Mon06:00Start of LHC technical stop (new software for orbit feedback) Planning Ahead LHC morning report