Bubble Chamber Planning Meeting 07 August 2013 1.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

EMMA LAYOUT Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.
Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
5 MeV Mott Measurement for CEBAF Operations group Joe Grames, Marcy Stutzman February 14 th, 2007 Sir Nevill F. Mott at the ceremony with his Nobel Prize.
INJECTOR TEST FACILITY UPGRADE PHASE I: 5-10 MEV INJECTOR Feb. 7, 2014.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
G2p/GEp Beamline Tim Michalski Project Lead. Overview Facilitate the design, procurement, and build of the beamline – up to the target chamber g2p/GEp.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Bubble Chamber Planning Meeting 04 September
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
Low Energy RHIC e - Cooling Meeting Notes 1 –LF Solenoids & HF (Matching) Solenoids: Out for bid??? –20 o Dipole  Magnet gap is 4 inches/transport lines.
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
Bubble Chamber Experimental Readiness Review September.
Beamline update Ken Moffeit 5 June 2013 The Beginning Overview of the beamline Beam diagnostics Silicon Protection New options for location of HPS Beamline.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
SR Vacuum Systems and Front Ends
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Experiment beam line installation (9/4/2014) SystemThus FarTo Do Vacuum~ Torr, IP’s on, Vac interlock checkNone Fast valveValve + CCG installed,
W. Decking, M. Dohlus, C. Gerth, A. Krasnov, S. Lederer, T. Limberg, N. Mildner, D. Noelle FEL Beam Dynamics Meeting, XFEL Bunch Compressor.
FNAL, May 10, Introduction for Beam Diagnostics Laboratory Main Mission: R&D on charged particle beam diagnostics for e + /e - linear colliders.
Introduction to Bubble Chamber: Ops Training September.
Bubble Chamber: Experimental Overview August 18, 2015.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
Beam line Experiment area SC magnet Pion production target
Managed by UT-Battelle for the Department of Energy SNS Injection and Extraction Systems Issues and Solutions by M. Plum for the SNS team and our BNL collaborators.
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
ECS workshop, CERN, may ‘00M. Ferro-Luzzi LHCb Vertex Detector System Reminder of current VELO design Controls: Motion mechanics Vacuum system Cooling.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
Error Analysis 04 September Penfold-Leiss Cross Section Unfolding Measure Yields at: where, The solution can be written in two forms: 2.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz UITF Beam-line Modeling (2) UITF Mtg. JLAB,
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
R. Arnold SLAC 24 June 2002 Real Photon Collaboration Conceptual Design Review Beam Monitoring Instruments.
Report Technical Director Storage-Ring-Installation Completed
High energy beam transport.
Bubble Chamber Planning Meeting
Electron Beam Setup for Bubble Chamber
5 MeV Mott Measurement for CEBAF Operations group
Bubble Chamber Summer 2015 Installation and Beam Test Schedule
Introduction to Bubble Chamber: Ops Training
Bubble Chamber – Beam Requirements
Bubble Chamber Readiness Review
Photons centered on collimator
CLIC damping rings working plan towards the CDR
J. Seeman Assistant Director for PPA/LCLS
Bubble Chamber Experiments at UITF
Installation and Beam Test Schedule
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Extraction Michael Bevins May 17, 2007
Ion Source and LEBT Beam Diagnostics
Two-beam Test-stand Design and Construction Status
UITF Conduct of Operations Review
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Isotope Readiness Review Run Plans
Presentation transcript:

Bubble Chamber Planning Meeting 07 August

Agenda 1.Bubble Chamber progress at Argonne 2.Beamline Layout 3.Bubble Chamber cost estimate: procurement and labor 4.Background from 17 O(γ,n) 16 O and subsequent neutron elastic scattering with 16 O and 14 N nuclei 5.Background from 13 C(γ,n) 12 C (in case we decide to use CO 2 instead of N 2 O) 2

I.HARP to measure beam profile II.Fast Valve to protect from vacuum failure III.Distance between two BPMs = 55” (was 18” for PEPPo) IV.Camera for OTR light from Cu foil V.Electron Dump: isolated to measure beam current, 2 kW VI.Beam Properties at Radiator: Beamline Layout Beam Kinetic Energy, (MeV)3.0 – 8.5 Beam Current (µA)0.01 – 100 Absolute Beam Energy0.1% Relative Beam Energy0.1% Energy Resolution (Spread), σ T /T0.06% Beam Size, σ x,y (mm)1 – 2 3

42” 25° 100” Valve Ion Pump Viewer Quad BPM Corrector 35” HARP Fast Valve Quad BPM Corrector Radiator Viewer Ion Pump 55” Sweep Dipole 25° Vacuum Window Cu Collimator Electron Dump Photon Dump 92” Bubble Chamber 81” 4 Faraday Cup

Cost Estimate 5 I.Radiator motion and Sweep Dipole must be in FSD II.BCM0L02 and Electron Dump in Beam Loss Accounting (BLA) III.Cooled: Radiator and Electron Dump. IV.Uncooled: Photon Collimator and Photon Dump V.Re-use PEPPo radiator and beamline VI.New beamline components: 2 Super Harps + Fast Valve VII.Summary of labor cost by group: GroupLabor Survey & Alignment3 wks x 2 Magnet Test1 wk x 2 Engineering Design12 wks Software3 wks x 2 EES6 wk x 2 EH&Q4 wks

6 ItemMaterial Procurement ShopLabor New Dipole MagnetDipole Magnet ($8,000) Hall Probe ($2,000) Mapping (1 week) EESDC (1 week) Alignment (2 days) New Power SupplyPower Supply ($5,000)Software (2 weeks) New Beamline2 Super Harps and Fast Valve ($30,000) Pipes + Pedestals ($20,000)Design (6 weeks) Alignment (1 week) Software (4 weeks) EES (5 weeks) Radiator (cooled ladder, FSD) 0.02 and 0.10 mm Cu foils ($2,000) $4,000Design (2 week) Alignment (2 days) Sweep Dipole Electron DumpPure Cu ($5,000)Dump + Pipes ($15,000)Design (2 week) Alignment (1 day) Cu CollimatorPure Cu ($5,000)Collimator + Stand ($5,000)Design (1 week) Alignment (1 day) Photon Dump & StandPure Al ($3,000)$4,000Design (1 week) Alignment (1 day) Safety Review4 weeks Install6 weeks Bubble ChamberAlignment (1 week) Total$60,000$48,000$60,000 Total (with overhead)$75,000$60,000$90,000

17 O(γ,n) 16 O Background 7

 Depletion: I. 17 O depletion=5,000 II. 18 O depletion=5,000  Natural Abundance: I. 17 O: 0.038% II. 18 O: 0.205% Ion Energy Distribution 8

9

13 C(γ,n) 12 C Background 10  Depletion: I. 13 C depletion=1,000  Natural Abundance: I. 13 C: 1.07% For comparison, 17 O(γ,n) 16 O