Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 Converting API 11B Specification for Sucker Rods to ISO 10428 Sid Thomas Wilson International.

Slides:



Advertisements
Similar presentations
Long & Slow vs. Short & Fast
Advertisements

1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Drawings for an Oyster Strainer and Drain Pan This design of strainer is required in AOAC International (953.11) for use in determining the drained.
1 ASTM Committee D18 on Soil and Rock SI Units In D18 Standards January 27, 2014 Ron Ebelhar Richard Ladd.
API SC6 Winter Meeting New Business: API Spec 6A Tensile Test Specimen Requirements Tim Haeberle 8 February 2011.
Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC.
Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.
Slim Hole Sucker Rod Pumps
ALRDC Seminar New and Novel Artificial Lift Technologies ConocoPhillips, Houston, Texas May 14, 2014 Type R Hydraulic Piston Pump Alex Hageman Applications.
P449. p450 Figure 15-1 p451 Figure 15-2 p453 Figure 15-2a p453.
Structural drawing Instructor: M.Yaqub
Threads and Fasteners.
Lecture # 2 Allowable Stress Objective:
MECHANICAL DRAWING Chapter 11: Threads Fasteners and Springs
Surface Area: Prisms and Pyramids
Surface Area of Rectangular Prisms 1.How many outside surfaces does a rectangular prism have? 2.What shape are each of the faces? The six rectangular sides.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All 2011 IN REVIEW: ITU’S ACTIVITIES IN THE FIELD OF STANDARDIZATION & IPR Antoine Dore, Senior Legal.
4 Unit Title Blocks and Notes. 4 Unit Title Blocks and Notes.
Accredited Standards Committee X9, Inc. An Introduction to Financial Industry Global Standards.
B2C Extended Packaging Bar Code Standard
SMART Agency Tipsheet Staff List This document focuses on setting up and maintaining program staff. Total Pages: 14 Staff Profile Staff Address Staff Assignment.
IEEE S2ESC Report1 Software And Systems Engineering Standards Committee (S2ESC) Paul R. Croll S2ESC Sponsor Chair June 2004 Report.
Threads, Fasteners, and Springs Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson.
Volume word problems Part 2.
AM test sample. outside 20 mm inside 19 mm wallthickness 1 mm height features 4 mm.
BCGWA Ground Water Protection Regulation Workshops 2005 BCGWA Conference Penticton, B.C. March 3-4, 2005 Gilles Wendling Kaya Forest.
Chapter 10 Test Formula Review.  Find the circumference of a circle with a diameter of 10. Identify the formula needed for the following questions.
Chapter Secretaries’ Workshop Steven D. Johnson Sooner State Chapter Secretary SCTE.
NACE STANDARDS Dept. of Metallurgy and Materials Engineering University of Indonesia.
1 Commercial Operations Sub-Committee Update to TAC October 5, 2007.
© 2011 Pearson Education, Inc. All Rights Reserved Automotive Technology, Fifth Edition James Halderman FASTENERS AND THREAD REPAIR 8.
Official Danish Center for Life Cycle Assessment and Life Cycle Approaches Frydendal, Hauschild, Hansen, Stranddorf, Legarth Jeppe Frydendal Head of LCA.
Fill in the area formulas for the following: Circle ____________________ Rectangle ________________ Triangle __________________.
TECH 104 – Technical Graphics Communication Week 7: Dimensioning.
How to Calculate Area, Perimeter, and Volume By Trayvona Ford
Find the perimeter of the figure below. 6 units 5 units u + 6u + 5u + 5u = 22u 1 NCSC - Mathematics Lesson.
Activities 2012 GS1 Jordan. © 2011 GS1 Staff & Departments Recently two new employees were hired, increasing the number of our staff to ten. A marketing.
TIME TO MAKE PARTS But first we need to set up part templates.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
Structural Steel Construction
Squared and Cubed Conversion Factors
B AJ Bureau of Justice Assistance Global Justice Information Sharing Initiative Global Infrastructure/Standards Working Group (GISWG)
Cubes Investigation Nets & Surface Area. Cube Nets How many are there? 11.
Measurement Notes Metric unit of length is the meter (m).
Destructive Testing The mechanical testing of weld samples to determine their strength and other characteristics. Performed on test specimens taken from.
FASTENERS AND THREAD REPAIR
Structural drawing.
Task Group Status January ,11, 2017
Fasteners.
Week 2 Experimentation TS Term 2.
Measures.
1.6 Allowable Stress Allowable Load < Failure Load
How to Identify a Bolt.
ISO Gas-Lift Work Task Session Fall 2003 Gas-Lift Workshop
Chapter 1 Section 1.7 Area and Perimeter.
Chapter 1 Section 1.7 Area and Perimeter.
API Gas-Lift Task Group Session Fall 2003 Gas-Lift Workshop
Everything you need to know about beam pumping, and more!
Alejandro F. Ameglio – Head Technical Services Tenaris Rods Division
The title of the poster goes here. This font is Arial Bold
FINAL PRESENTATION AND PAPER
Forging Forging is a deformation process in which the work is compressed between two dies, using either impact or gradual pressure to form the part. It.
Emulsion Task Force (ETF) Meeting
Internal Mount Flange Facing Machine
OCPS CCNA SELECTION COMMITTEE TRAINING
Goal: The learner will find area and perimeter.
CSOEM Materials Advisory Resource Group
Cuboid – Volume – Worksheet A
Surface Area and Volume
Presentation transcript:

Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 Converting API 11B Specification for Sucker Rods to ISO Sid Thomas Wilson International Chairman API Sub-Committee 11

Oct , Beam Pumping Workshop2 Standards History and Relevance Standards Importance – Specification vs. Recommended Practice History of 11B First Print 1927 Driving Influences for Specifications

Oct , Beam Pumping Workshop3 Committee Members API Membership Qualifications Function and Responsibility ISO and API Cooperation

Oct , Beam Pumping Workshop4 ISO Fast Track Documents Examples 11B & 11E Methodology – Industry Needs Difference ISO and API Documents

Oct , Beam Pumping Workshop5 ISO Process Format Process Five Levels of Approval Industry Compliance

Oct , Beam Pumping Workshop6 Notes: See Table A-3. See Figure 3 for details of shoulder connection. Figure 1 – General dimensions for steel sucker rod pin ends Diameter of rod body mm, +0.18/ mm, +0.20/ mm, / mm, +0.23/ mm, +0.25/-0.51 ( 5/8 inch) (+.007/-.014) (3/4 inch) (+.008/-.016) (7/8 inch) (+.008/-.016) (1 inch) (+.009/-.018) (1-1/8 inch) (+.010/-.020) Outside diameter of pin shoulder D f 31.8 mm, +0.13/ mm, +0.13/ mm, +0.13/ mm, +0.13/ mm, +/ (1.250 inches) (+.005/-.010) (1.500 inches) (+.005/-.010) (1.625 inches) (+.005/-.010) (2.000 inches) (+.005/-.010) (2.250 inches) (+/-.015) Width of wrench square W S 22.2 mm, +/ mm, +/ mm, +/ mm, +/-0.8 (7/8 inch) (+/- 1/32) (1 inch) (+/- 1/32) (1-5/16 inches) (+/- 1/32) (1-1/2 inches) (+/- 1/32) Length of wrench square W 1 (minimum length, exclusive of fillet) 31.8 mm 38.1 mm41.3 mm (1-1/4 inches) (1-1/2 inches)(1-5/8 inches) Length of sucker rod (measured from contact face of pin shoulder to contact face of pin shoulder) 7518/9042 mm, +/ /9042 mm, +/ /9042 mm, +/ /9042 mm, +/ /9042 mm, +/- 51 (296/356 inches), (+/- 2.0 ) (296/356 inches), (+/- 2.0 ) (296/356 inches), (+/- 2.0 ) (296/356 inches), (+/- 2.0 ) (296/356 inches), (+/- 2.0 ) Length of pony rods (measured from contact face of pin shoulder to contact face of pin shoulder) 508/1118/1727/ 2337/2946 mm +/ /1118/1727/ 2337/2946 mm +/ /1118/1727/ 2337/2946 mm +/ /1118/1727/ 2337/2946 mm +/ /1118/1727/ 2337/2946 mm +/- 51 ( 20/44/68/92/116 inches) (+/- 2.0 inches) Diameter of bead D U 31.1 mm +0.13/ mm +0.13/ mm +0.13/ mm +0.13/ mm +0.13/-4.76 ( 1-7/32 inches) (+.005/-1/8) (1-13/32 inches) (+.005/-1/8) (1-1/2 inches) (+.005/-1/8) (1-29/32 inches) (+.005/-3/16) (2-3/16 inches) (+.005/-3/16) A R (Typically verified in forging die qualification) 47.6 mm, +/ mm, +/ mm, +/ mm, +/ mm, +/ (1-7/8 inches) (+/- 1/8) (2-1/4 inches) (+/- 1/8) (2-5/8 inches) (+/- 1/8) (3 inches) (+/- 1/8) (3-3/8 inches) (+/- 1/8) C R (Typically verified in forging die qualification) 3.2 mm, +1.59/ mm, +1.59/-0.40 (1/8 inch) (+1/16/-1/64) (3/16 inch) (+1/16/-1/64) General Dimensions

Oct , Beam Pumping Workshop7 Changes Through the ISO Process Allowing for New Technologies Maintaining Interchangeability Driving Factors

Oct , Beam Pumping Workshop8 ISO Format and Structure Ten Sections In Completed Documents Metric System US Units Secondary User Functionality

Oct , Beam Pumping Workshop9 Existing Issues and Future Challenges Major Obstacles Surface Discontinuities Technical Measurement Accuracies End User Focus and Industry Compliance

Oct , Beam Pumping Workshop10 Questions and Contact Information Sid Thomas Phone Benny Williams chief