Lasti ISI Update March 2007 On behalf of the SEI Team LIGO-G070185-00-Z.

Slides:



Advertisements
Similar presentations
Vibration Isolation Group R. Takahashi (ICRR)Chief T. Uchiyama (ICRR)Payload design H. Ishizaki (NAOJ)Prototype test R. DeSalvo (Caltech)SAS design A.
Advertisements

Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
LIGO-G D 1 Coupled Dynamics of Payload Structures on the Seismically Isolated Optics Table Dennis Coyne, LIGO Caltech SWG Meeting, 2 Sep 2005.
1 LIGO-G v3 Transmission Monitoring Telescope and Suspension – TMS Eric Gustafson aLIGO NSF Review LIGO Livingston Observatory April 25-27, 2011.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
Dennis Coyne Excomm Jan 26, 2004
LIGO-G M LIGO1 Hydraulic External Pre-Isolator (HEPI) Overall Installation Plan/Schedule Dennis Coyne HEPI Installation Readiness Review Feb 11,
G M Advanced R&D1 Seismic Isolation Retrofit Plan for the LIGO Livingston Observatory Dennis Coyne 29 Nov 2001.
LIGO-G M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G M Advanced LIGO1 Finite Element Modeling Requirements Dennis Coyne Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication.
LIGO-G M LIGO Laboratory1 Adv. LIGO Seismic Isolation (SEI) Plans, Schedule, Costs, Team Schedule »through R&D, including near-term plans »project.
Nov ’01, page 1 Current Work on Hydraulics for LIGO 1 and Advanced LIGO Rich Abbott, Graham Allen, Daniel DeBra, Joe Giaime, Giles Hammond, Marcel Hammond,
LIGO-G M Advanced LIGO1 Mass Limits & Balancing Dennis Coyne Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Internal Seismic Isolation (ISC) Overview Report for the August CDS meeting Ben Abbott Caltech.
Active Seismic Isolation Systems for Enhanced and Advanced LIGO Jeffrey S. Kissel 1 for the LSC 1 Louisiana State University The mechanical system for.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
LSC Meeting August ‘04 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, Hanford Dave Ottaway for the LASTI team August.
LIGO-G R 1 LIGO Laboratory R&D for the period Fall 2007 to Fall 2008 Presented at the MIT MOU Review August 2007.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
G R Advanced LIGO Seismic Isolation R&D Dennis Coyne 8 Oct 2002.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Prototype Test of Vibration Isolation System Current Status & Schedule
Takanori Sekiguchi Anual Meeting of Physics Society of Japan Sep. 22nd, 2013) Prototype Test of Vibration Isolation System Current Status & Schedule 1.
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
SUSPENSION DESIGN FOR ADVANCED LIGO: Update on GEO Activities Norna A Robertson University of Glasgow for the GEO 600 suspension team LSC Meeting, Louisiana,
Conceptual Design for Advanced LIGO Suspensions Norna A Robertson University of Glasgow and Stanford University for the GEO suspension team +contribution.
Update on Advanced LIGO suspension design and technology development towards the quad noise prototype Caroline A. Cantley for Advanced LIGO Suspension.
Livingston 16 th August 2006 LIGO-G E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,
E v3 aLIGO SEI Testing and Commissioning Overall Plan
G M 1 HAM-SAS CCB information 22 Feb 06 Coyne, Shoemaker, Wilkinson.
Daniel Clark Dan DeBra Victor Herrera Brian Lantz Joe Hansen Jeff Kissel Michael Meyer Brian O’Reilly Celine Ramet & Staff at LLO Anamaria Effler Michael.
G Consideration of HAM SAS for Advanced LIGO David Shoemaker LIGO Excomm 30 April 07.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Poster Design & Printing by Genigraphics ® The commissioning of the prototype BSC-ISI has discovered a large number of structural resonances.
Prototype Quadruple Pendulum Update – Part 1 Norna Robertson and Calum Torrie University of Glasgow for the GEO 600 suspension team LSC Meeting, Hanford,
Update on Activities in Suspensions for Advanced LIGO Norna A Robertson University of Glasgow and Stanford University LSC meeting, Hanford, Aug 20 th 2002.
LSC Meeting March ‘05 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, LLO Dave Ottaway for the LASTI team March 2006 LIGO-G Z.
Linear Dynamic Model for Advanced LIGO Isolation System Wensheng Hua, Brain Lantz, Dan Debra, Jonathan How, Corwin Hardham, Sam Richman, Rana Adhikari,
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
LSC Meeting March ‘07 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) LASTI Progress and Plans LSC Meeting, LLO Dave Ottaway/Richard Mittleman March.
LIGO-G R 1 HAM Passive Seismic Attenuation System (SAS) System Performance, Fabrication, Assembly, Installation Riccardo DeSalvo, Valerio Boschi,
LIGO-G Z Adaptive FIRs taking place at Lasti Richard Mittleman Laurent Ruet Brett Shapiro April 2006.
Advanced LIGO Lateral/Tilt Mechanical Coupling Study Ken Smith January 8, 2004 Ref: A.
SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review.
LSC Meeting Baton Rouge, LA, V.Boschi for the HAM-SAS team Ben Abbott, Valerio Boschi, Dennis Coyne, Michael Forte, Jay Heefner, Yu-mei Huang,
LIGO-G D Design Requirements Larry Jones Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference April.
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Active Vibration Isolation using a Suspension Point Interferometer Youichi Aso Dept. Physics, University of Tokyo ASPEN Winter Conference on Gravitational.
Overview of monolithic suspension work for Advanced LIGO Mariëlle van Veggel, Mark Barton, Tim Bodiya, Alan Cumming, Liam Cunningham, Giles Hammond, Gregg.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
Practical considerations for quad suspension upgrades Giles Hammond, Norna Robertson, Travis Sadecki, Brett Shapiro, Betsy Weaver G v3.
F/8 Repair and recommissioning status and near term forward look Ron Probst, Roberto Tighe 06 Nov 2012.
Progress Towards a Cryogenic LIGO mirror
Type-A SAS Local Control Simulation (Current Status)
Advanced LIGO Quad Prototype Janeen Romie LSC, March 2004
PEM pre-O1 1) Current status of PEM system pre-O1: 80/90% working
Lasti Update July 25, 2007 LIGO-G Z
Disassembly and Assembly of A07A-W1/W2 Electronic Governor Actuator for AD Fuel Injection Pump
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
Seismic Developments at LASTI LIGO-G Z
Status of LIGO Installation and Commissioning
Management of the Advanced LIGO Seismic Isolation System Development
HAM SAS Test Plan at LASTI
Required tools for installation of a V-1020C speaker with V-9914 bridge.
Advanced R&D Lab Review
Presentation transcript:

Lasti ISI Update March 2007 On behalf of the SEI Team LIGO-G Z

The SEI Team MIT Daniel Clark Tarmigan Casebolt Dan DeBra Brian Lantz Stanford Stephany Foley Bob Lalierte Myron Macinnis Fabrice Matichard Ken Mason Rich Mittleman Laurent Ruet LLo/LSU Joe Giaime Joe Hanson Brian O’Reilly Shyang Wen Caltech Ben Abbott Dennis Coyne Lee Cardenas Jay Heefner LHO Corey Gray Hugh Radkins And I’m sure that I’ve missed a few Mike Zucker

Where we are now Finished Dirty Testing Phase Suspended at full load Tested the stages for Resonances (verify that a bolted structure works) Understand the ASI Model Writing assembly procedures Taking care of minor redesigns Designing some new tooling Disassembling for cleaning Preparing for Clean assembly

Three Stage ISI Stage 0 Stage 1 Stage 2 Large Springs Keel Ballast Alignment Pin Inertial Sensors Lockers Actuators & Displacement sensors

Assembly Over all the assembly went very smoothly ~300 parts & 3000 bolts Some Tooling Problems Spring Pre-loaders Actuator positioning brackets One set of screw holes (6 holes) misplaced A few very difficult bolts (some redesign) Some Electronic Problems (mostly displacement sensors) It was a learning experience

ISI vs ETF ETF is 2/3 full size Curved Blade Springs vs Straight Springs Extra Compliance Tuning Step Different resonant frequencies East coast vs West coast

Compliance Measurements Test Design and Model Does the design meet specifications Stage 2 actuators Test Assembly Procedure Friction, interference, tolerances Diagonal Compliance Matrix Low Tilt Coupling frequency Makes the Control Design Task Easier L Θ X Θ~0Θ~0 X ω T = (g/L) 1/2 L Effective = X/ Θ

Stage 1-2 Actuator Mounting Redesign (Moved down by 1.835”)

Seems to fit a Coulomb Friction Model Non-Linear Compliance v FcFc For F c << F drive Expect C(F) = C 0 *(1- Fc/F) Most (if not all) of the problem was in the wiring, when We rewired the platform we got about a factor of ten reduction in F c Went from 10’s of mNewtons to a few mNewtons

Spring Tester Supplied by ASI to measure The spring constants before installing on the ISI

Schedule ISI and Noise Prototype are inserted into the vacuum chamber Quadruple Pendulum Noise Prototype is mated to the ISI

Time to Move On