AB/CO Review, Interlock team, 20 th September 2005 1 Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
André Augustinus 16 June 2003 DCS Workshop Safety.
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
LHC-MAC1 LHC Controls Infrastructure and the timing system Hermann Schmickler on behalf of the CERN Accelerator and Beams Controls Group.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
FAIR Accelerator Controls Strategy
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
For more info:
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Interlocks for Magnet Protection System Iván Romera Ramírez, Markus Zerlauth - CERN.
Experimental Areas Controls Review  AB/CO Viewpoint Vito Baggiolini (on behalf of the CESAR team and several people in CO)
Isabelle Laugier, AT/VAC/ICM Section May 6 th 2008 LHC Vacuum Control system.
Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.
PM System Architecture Front-Ends, Servers, Triggering Ingredients Workshop on LHC Post Mortem Session 1 – What exists - PM System, Logging, Alarms Robin.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
External Data and DIP Oliver Holme 18 th January 2008.
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
PLCs at CERN for machine protection and access interlocks Session: Machine Protection and interlock systems at different labs I. Romera Ramírez (CERN /
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
R. Denz, A. Gomez Alonso, AT-MEL-PM
Installations, modifications, consolidation in 2005:
J. Uythoven for the MPE-MI & MS Teams
MPE main activities planned for LS2
The Control System For LHC Hardware Commissioning
Machine Protection Xu Hongliang.
+ many slides from various colleagues (KH, Rudiger, Paul, …)
Review of hardware commissioning
Presentation transcript:

AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task shared between AB-CO, AB-PO and AT-MEL

AB/CO Review, Interlock team, 20 th September Current and future installations Protection of ~1600 electrical circuits with sc magnets Protection of ~ 150 nc magnets Protection of ~ 800 nc magnets in SPS extractions lines & CNGS Protection of ~ 100 nc magnets in LEIR Superconducting Magnets 3. Other installations (e.g. CTF3, PS, SPS consolidation…) 2. Normal conducting magnets

AB/CO Review, Interlock team, 20 th September Powering Interlocks as service and client of AB-CO The powering Interlock systems are at the same time service to the accelerator operation and client of AB/CO Service: Provide connectivity between power converters and magnets/quench protection system Provide additional functionality (global aborts, anticipatory shut downs) and interface towards the beam interlock controllers Provide remote monitoring and failure diagnostics Client: PVSS support from CO-IS (Industrial Systems section) Database support for asset management, controls layout, naming and configuration from CO-DM (Data Management section) Logging, PM and ALARMS client from CO-DM & CO-AP (Application section) Tools for automated commissioning (PVSS-CMW client, sequencer from AP…)

AB/CO Review, Interlock team, 20 th September Power Conver ter Power Conver ter Power Conver ter QPS Architecture - The different levels of the project Power Conver ter PC_PERMIT PC_FAST_ABORT POWERING_FAILURE Magnet / QPS CIRCUIT_QUENCH / MAGNET OVERTEMP Profibus PLC for process control and configuration HW Current loops for connections of clients Ethernet Technical Network LHC Ref DB PVSS Operator Console and Server for remote monitoring and system configuration (in the Field Control Room, CCC or CCR) AUG UPS Beam Permit Beam Interlock system PIC/WIC Patch Panels and Electronics

AB/CO Review, Interlock team, 20 th September Status of the different levels for the PIC project Version 1.0 ready Automatic configuration from RefDB PVSS server installed and consoles configured in the lab and FCR Done by CO-IS Version 1.0 ready Functionality test implemented History buffer implemented Automatic configuration from RefDB Done by interlock team Prototypes finished Pre-series currently in production EMC, radiation tolerance and functionality tests Test system for Individual System Test completed Done by interlock team

AB/CO Review, Interlock team, 20 th September Status of the different levels for the WIC project Supervision for TI8 operational Local touch screens for LEIR Support for LHC Supervision required TI8 version by interlock team (future PVSS support by IS?) Generic SW used for LEIR and LHC Version 1.0 ready Standard and Safety PLC components used TI8 and LEIR installed and commissioned Done by interlock team HW installations for TI8 and LEIR installed TI2 and LHC installations partially installed Done by interlock team Cable Patches for collection of thermo switches, Elettas…

AB/CO Review, Interlock team, 20 th September Key dates for LHC commissioning Sector 81 LSS L8 A78 –PIC Installation and support during short circuit tests in UA83 –subsector cool down and power tests in LSS left of IR8 partly in parallel with QRL test of whole sector –power tests in Arc 78 –power tests in sector 81 –Installations for WIC LHC Jan/Feb 2006 July 2006 September 2005 July 2006 in parallel with PIC

AB/CO Review, Interlock team, 20 th September Magnet Interlocks CERN wide: by CO ? We received several request for participation to magnet interlock systems in other CERN installation –LEIR –PS –CTF3 Should we become responsible for such installations ?  In general, it is a good idea that only one team should be responsible for magnet interlocks at CERN (for normal conducting magnets and superconducting magnets)  Todays priority are the interlock systems for LHC and injection lines from SPS to LHC. This is required to start LHC operation.  Interlock systems in existing installations are aging, and consolidation is required. For several accelerators, machine operation relies on these interlocks systems. If they fail, no LHC operation.

AB/CO Review, Interlock team, 20 th September Magnet Interlocks CERN wide: Issues  No clear indication that massive failures are expected in the near future, consolidation has not the first priority  Interlock systems in new installations: on one hand it is desirable that this is done by our team, on the other hand systems required for LHC operation have priority. We see two options: –we do not get involved before LHC is completed –we do get involved with additional manpower (e.g. FSU). We would first evaluate budget and amount and type of manpower required for such system, and then discuss realisation. It would be with the same type of generic system as for LHC and LEIR based on PLCs  Commissioning of interlock system would have to be well organised.  Long-term maintenance: our team will cover magnet interlocks at LHC, transfer lines SPS-LHC, SPS and LEIR. Manpower for maintenance will be evaluated. There might be a kind of "piquet" service required.

AB/CO Review, Interlock team, 20 th September Conclusions and outlook  Powering Interlock design and installations are well advanced, based on an efficient and close collaboration with the equipment groups (AB-PO, AT- MEL) –PIC, WIC-TI8, WIC-TI2, WIC-LEIR, WIC-LHC –CTF3, PS…  Documentation and commissioning procedures mostly finished  Support within CO is excellent and will have to continue throughout HWC and future installations  For the PIC, the automated tools for commissioning are a MUST, and have to be operational for HWC proper in February 2006 –To fulfill the parallel installation/commissioning, we rely on the additional manpower for hardware commissioning that was requested  Software interlocks (and exchange of interlock data on the supervision level) has been agreed– documentation to be written and to be agreed by OP & AP in order to use same methods to access data (e.g. LHC state machine, sequencer…)