INFSO-RI-508833 Enabling Grids for E-sciencE www.eu-egee.org LCG-2_6_0 Markus Schulz CERN GD 7 th September 2005.

Slides:



Advertisements
Similar presentations
New VOMS servers campaign GDB, 8 th Oct 2014 Maarten Litmaath IT/SDC.
Advertisements

EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks gLite Release Process Maria Alandes Pradillo.
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
INFSO-RI Enabling Grids for E-sciencE SRMv2.2 experience Sophie Lemaitre WLCG Workshop.
INFSO-RI Enabling Grids for E-sciencE Status of LCG-2 porting Stephen Childs, Brian Coghlan and Eamonn Kenny Grid-Ireland/EGEE October.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Simply monitor a grid site with Nagios J.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
EGEE-II INFSO-RI Enabling Grids for E-sciencE Postmortem gLite postmortem an examination of a dead body to determine the cause.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Information System on gLite middleware Vincent.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Middleware Deployment and Support in EGEE.
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
INFSO-RI Enabling Grids for E-sciencE Integration and Testing, SA3 Markus Schulz CERN IT JRA1 All-Hands Meeting 22 nd - 24 nd March.
INFSO-RI Enabling Grids for E-sciencE Strategy for gLite multi-platform support Author:Eamonn Kenny Meeting:SA3 All Hands Meeting.
GLite – An Outsider’s View Stephen Burke RAL. January 31 st 2005gLite overview Introduction A personal view of the current situation –Asked to be provocative!
Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Usage of virtualization in gLite certification Andreas Unterkircher.
EGEE is a project funded by the European Union under contract IST EGEE Services Ian Bird SA1 Manager Cork Meeting, April
INFSO-RI Enabling Grids for E-sciencE Enabling Grids for E-sciencE Pre-GDB Storage Classes summary of discussions Flavia Donno Pre-GDB.
INFSO-RI Enabling Grids for E-sciencE Information and Monitoring Status and Plans Plzeň, 10 July 2006 Steve Fisher/RAL.
Experiment Operations: ALICE Report WLCG GDB Meeting, CERN 14th October 2009 Patricia Méndez Lorenzo, IT/GS-EIS.
INFSO-RI Enabling Grids for E-sciencE GridICE: Grid and Fabric Monitoring Integrated for gLite-based Sites Sergio Fantinel INFN.
8 th CIC on Duty meeting Krakow /2006 Enabling Grids for E-sciencE Feedback from SEE first COD shift Emanoil Atanassov Todor Gurov.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Site Architecture Resource Center Deployment Considerations MIMOS EGEE Tutorial.
Site Validation Session Report Co-Chairs: Piotr Nyczyk, CERN IT/GD Leigh Grundhoefer, IU / OSG Notes from Judy Novak WLCG-OSG-EGEE Workshop CERN, June.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Using GStat 2.0 for Information Validation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The future of the gLite release process Oliver.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Progress on first user scenarios Stephen.
INFSO-RI Enabling Grids for E-sciencE ARDA Experiment Dashboard Ricardo Rocha (ARDA – CERN) on behalf of the Dashboard Team.
SAM Sensors & Tests Judit Novak CERN IT/GD SAM Review I. 21. May 2007, CERN.
EGEE-II INFSO-RI Enabling Grids for E-sciencE Real Life Examples Tickets – Real life examples Mário David LIP - Lisbon.
Certification and test activity ROC/CIC Deployment Team EGEE-SA1 Conference, CNAF – Bologna 05 Oct
EGEE-II INFSO-RI Enabling Grids for E-sciencE YAIM Overview MiMOS Grid tutorial HungChe, ASGC OPS Team.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Communication tools between Grid Virtual.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA3 partner collaboration tasks & process.
LCG WLCG Accounting: Update, Issues, and Plans John Gordon RAL Management Board, 19 December 2006.
LCG Accounting Update John Gordon, CCLRC-RAL WLCG Workshop, CERN 24/1/2007 LCG.
EGEE-III INFSO-RI Enabling Grids for E-sciencE SA3 All Hands Meeting 'Cluster of Competence' Experience SA3 INFN Cyprus May 7th-8th.
1Maria Dimou- cern-it-gd LCG November 2007 GDB October 2007 VOM(R)S Workshop report Grid Deployment Board.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Middleware Update Maria Alandes Pradillo.
GridView - A Monitoring & Visualization tool for LCG Rajesh Kalmady, Phool Chand, Kislay Bhatt, D. D. Sonvane, Kumar Vaibhav B.A.R.C. BARC-CERN/LCG Meeting.
INFSO-RI Enabling Grids for E-sciencE gLite Certification and Deployment Process Markus Schulz, SA1, CERN EGEE 1 st EU Review 9-11/02/2005.
TP: Grid site installation BEINGRID site installation.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Patch Preparation SA3 All Hands Meeting.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks MSA3.4.1 “The process document” Oliver Keeble.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROCs Top 5 Middleware Issues Daniele Cesini,
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
EGEE-II INFSO-RI Enabling Grids for E-sciencE Data Management cluster summary David Smith JRA1 All Hands meeting, Catania, 7 March.
Operations model Maite Barroso, CERN On behalf of EGEE operations WLCG Service Workshop 11/02/2006.
8 August 2006MB Report on Status and Progress of SC4 activities 1 MB (Snapshot) Report on Status and Progress of SC4 activities A weekly report is gathered.
INFSO-RI Enabling Grids for E-sciencE Operations Parallel Session Summary Markus Schulz CERN IT/GD Joint OSG and EGEE Operations.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Implementing product teams Oliver Keeble.
INFSO-RI Enabling Grids for E-sciencE Upcoming Releases Markus Schulz CERN SA1 15 th June 2005.
EGEE-III INFSO-RI Enabling Grids for E-sciencE JRA1 and SA3 All Hands Meeting December 2009, CERN, Geneva Product Teams –
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Operations: Evolution of the Role of.
SAM Status Update Piotr Nyczyk LCG Management Board CERN, 5 June 2007.
Status of gLite-3.0 deployment and uptake Ian Bird CERN IT LCG-LHCC Referees Meeting 29 th January 2007.
INFSO-RI Enabling Grids for E-sciencE File Transfer Software and Service SC3 Gavin McCance – JRA1 Data Management Cluster Service.
II EGEE conference Den Haag November, ROC-CIC status in Italy
INFSO-RI Enabling Grids for E-sciencE Resource allocation and negotiation update C. Vistoli, R. Rumler Operations workshop Bologna.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The Dashboard for Operations Cyril L’Orphelin.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GLUE 2: Deployment and Validation Stephen Burke egi.eu EGI OMB March 26 th.
LCG Accounting Update John Gordon, CCLRC-RAL 10/1/2007.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks CYFRONET site report Marcin Radecki CYFRONET.
INFSO-RI Enabling Grids for E-sciencE Padova site report Massimo Sgaravatto On behalf of the JRA1 IT-CZ Padova group.
Maria Alandes Pradillo, CERN Training on GLUE 2 information validation EGI Technical Forum September 2013.
The EMT Oliver Keeble, SA3 CERN.
Operations Status Report
Andreas Unterkircher CERN Grid Deployment
Presentation transcript:

INFSO-RI Enabling Grids for E-sciencE LCG-2_6_0 Markus Schulz CERN GD 7 th September 2005

Enabling Grids for E-sciencE INFSO-RI GDB September Overview The last releases –LCG-2_4_0 –LCG-2_5_0 (the SC3 release) –LCG-2_6_0 Upcoming Releases –LCG-2_7_0 Summary

Enabling Grids for E-sciencE INFSO-RI GDB September LCG-2_4_0 New process for major release was used (3 monthly fixed release) –Freeze of the candidate component list at a given date –Release at a given date (to allow planning) –3 * 5 working days to upgrade the sites C&T EIS GIS GDB Applications RC Bugs/Patches/Task Savannah Bugs/Patches/Task Savannah EIS CICs Head of Deployment Head of Deployment prioritization & selection Developers Applications Developers 1 1 List for next release (can be empty) List for next release (can be empty) 2 2 integration & first tests C&T 3 3 Internal Releases Internal Releases 4 4 User Level install of client tools EIS 5 5 full deployment on test clusters (6) functional/stress tests ~1 week C&T 6 6 assign and update cost Bugs/Patches/Task Savannah Bugs/Patches/Task Savannah components ready at cutoff Internal Client Release Internal Client Release 7 7 Client Release Client Release Service Release Service Release Updates Release Updates Release Core Service Release Core Service Release C&T

Enabling Grids for E-sciencE INFSO-RI GDB September LCG-2_4_0 The deployment bit… –Major releases have been expected to be installed after 3 weeks Release(s) Certification is run daily Update User Guides EIS Update Release Notes GIS Release Notes Installation Guides User Guides Re-Certify CIC Every Month 11 Release Client Release Deploy Client Releases (User Space) GIS Deploy Service Releases (Optional) CICs RCs CICs RCs Deploy Major Releases (Mandatory) ROCs RCs ROCs RCs YAIM Every Month Every 3 months on fixed dates ! at own pace

Enabling Grids for E-sciencE INFSO-RI GDB September LCG-2_4_0 Reality: –Many bug fixes (Savannah) –Some new components (LFC, DPM, BDII extensions)  Not all via Savannah (but most) –List closed on fixed day, but prioritization not formal  EIS and deployment team –Simple webpage to trace progress (lightweight)

Enabling Grids for E-sciencE INFSO-RI GDB September LCG-2_4_0 History: –March 24th Early Announcement and call for deployment testers –April 1st detailed status, components, bugs fixed… –April 4th sent to the first test sites: Gergely and Eygene –April 6th released to the public –Release was a bit late  Major new components not ready Small, well identified problems, tempting not to wait 3 more months  Underestimated the time for “final touches” Release notes Deployment tests Web page updates

Enabling Grids for E-sciencE INFSO-RI GDB September LCG-2_4_0 Progress Plan

Progress Others: Sites on older versions or down All sites in LCG-2

Enabling Grids for E-sciencE INFSO-RI GDB September LCG-2_4_0 Lessons learned, feedback from the LCG Operations Workshop –Release definition non trivial with 3 months intervals –3 weeks time window is neither realistic nor acceptable –EGEE production service is a grid of independent federations  ROCs schedule upgrades in their region –Early announcement of new releases needed  At -3 weeks complete list of components and changes oProblematic, because this means certification has to be finished  At -2 weeks deployment tests at: ROC-IT, ROC-SE, ROC-UK  Last week to implement feedback and final touches

Enabling Grids for E-sciencE INFSO-RI GDB September The LCG-2_5_0 (SC3) Release Why? –SC3 core components are needed to start --> Special Release What? –FTS client libs –FTS services –Updated versions of:  LFC, DPM 1.3.2, some updated client libs. (gfal, lcg-util)  Some monitoring sensors (gridFTP) Who? –Tier 1 centers and Tier 2 centers participating in SC3 –FTS at T0 and T1s When? –Aimed at mid June, released 21th of June –LCG-2_5_0 deployed at 15 sites within 2 weeks –Announced LCG-2_6_0 for beginning of July

Enabling Grids for E-sciencE INFSO-RI GDB September LCG-2_6_0 Scheduled for 1st of July –When 2_5_0 was announced already shifted to “early July” –Why:  Releases need support work during deployment Mostly dependency problems (Scientific Linux at CERN and elsewhere) Localization  Same staff that is active in integrating a release Provides updates for SC3 as needed and supports deployment July 15th: announced prerelease –ROC-IT, ROC-UK/IE, ROC-SE started testing July 22nd: update on status –Results from tests –Release date shifted to 27th –More feedback from tests arrived ---> more fixes July 29th: Released –A bit more than a month after LCG-2_5_0

Enabling Grids for E-sciencE INFSO-RI GDB September What is in LCG-2_6_0? All of LCG-2_5_0 –Plus many bug fixes –With many improvements (Catalogues, DPM, FTS….) Main Changes: –New GLUE schema: glue-1.2 –New BDII that can handle old and new schema  Updates of all top level BDIIs required Support for sites that do not move to 2_6_0: no-update.txtno-update.txt –R-GMA == gLite-1.2  APEL, Monitoring…… –Details see: release notesrelease notes –VO-BOX –Rearranging services (Mon-BOX = R-GMA + GridICE)

Enabling Grids for E-sciencE INFSO-RI GDB September Release Note Dear ROC, CIC, site managers, and otherwise affected friends, this is the release notification for the long awaited LCG-2_6_0 release. ---> PLEASE READ THE SECTION ABOUT THE BDII <--- The release has been given 2 weeks ago to the ROCs in Italy, UK/IE, and Dear ROC, CIC, site managers, and otherwise affected friends, this is the release notification for the long awaited LCG-2_6_0 release. ---> PLEASE READ THE SECTION ABOUT THE BDII <--- The release has been given 2 weeks ago to the ROCs in Italy, UK/IE, and There is no longer a deadline for upgrading. The ROC managers will coordinate the upgrade in their region. Please clarify with them what the plan for moving to LCG-2_6_0 is. There is no longer a deadline for upgrading. The ROC managers will coordinate the upgrade in their region. Please clarify with them what the plan for moving to LCG-2_6_0 is. Read this if you opt to ignore all documentation: ================================================= The glue schema has changed to GLUE-1.2. ( This affects ALL sites, including those that opt not to upgrade in the near future but run their own top-level BDII for their UIs, WNs, and RBs at their site. A LCG-2_4_0 BDII can't see the information that is published by a LCG-2_6_0 site. As more and more sites upgrade to 2.6.0, the resources advertised by a top-level BDII will disappear. If you use your own top-level BDII, there are 3 solutions: Read this if you opt to ignore all documentation: ================================================= The glue schema has changed to GLUE-1.2. ( This affects ALL sites, including those that opt not to upgrade in the near future but run their own top-level BDII for their UIs, WNs, and RBs at their site. A LCG-2_4_0 BDII can't see the information that is published by a LCG-2_6_0 site. As more and more sites upgrade to 2.6.0, the resources advertised by a top-level BDII will disappear. If you use your own top-level BDII, there are 3 solutions:

Enabling Grids for E-sciencE INFSO-RI GDB September Problems Before The Release SC3 was in full swing Crucial updates to the new services in progress –Every few days…. –Intensive work by developers  Close loop between SC3 people and developers  Rapid change->test->change cycle Certification Team –Every morning seemed to be 3-4 days from release day –Every evening seemed to be 5 weeks away…… There is a conflict –Fast change rate for SCs required (T1s and Experiments) –Fixed and scheduled releases (Sites and us)

Enabling Grids for E-sciencE INFSO-RI GDB September After The Release –2_6_0 info providers hit a bug in gfal (not always)  upgrade August 1st (2 sites had already upgraded) –2 additional upgrades Bugs fixed: #9817 APEL_HOME missing #9850 config_users is confused with VO names like \"bio\" and \"biomed\" #9717 change order of connectors in server.xml file #10029 yaim should set JAVA_HOME in tomcat5.conf #10028 yaim does not properly handle VOs without a VOMS server #9857 GridIce server not installed in monitoring box #10291 yaim installs 2 different cron jobs with the same name; edg-rgma-apel #10243 config-apel-rgma, change \"all\" to missing. #10292 yaim\'s glite env script needs to be improved #10293 config_rgma_client should check if the glite paths are already in the PATH variables before setting them #10126 bug in configure_node script #10294 PX host should run config_rgma_client #10295 yaim sets GlueVOViewLocalID for all combinations of VOs and queues #10269 overview: config_gip does not set GlueServiceEndpoint for a dcache #7372 lbserver and locallogger must not share host proxy #8495 ${INSTALL_ROOT}/edg/var/info/$VO/$VO.list files should not be created by yaim Bugs fixed: #9817 APEL_HOME missing #9850 config_users is confused with VO names like \"bio\" and \"biomed\" #9717 change order of connectors in server.xml file #10029 yaim should set JAVA_HOME in tomcat5.conf #10028 yaim does not properly handle VOs without a VOMS server #9857 GridIce server not installed in monitoring box #10291 yaim installs 2 different cron jobs with the same name; edg-rgma-apel #10243 config-apel-rgma, change \"all\" to missing. #10292 yaim\'s glite env script needs to be improved #10293 config_rgma_client should check if the glite paths are already in the PATH variables before setting them #10126 bug in configure_node script #10294 PX host should run config_rgma_client #10295 yaim sets GlueVOViewLocalID for all combinations of VOs and queues #10269 overview: config_gip does not set GlueServiceEndpoint for a dcache #7372 lbserver and locallogger must not share host proxy #8495 ${INSTALL_ROOT}/edg/var/info/$VO/$VO.list files should not be created by yaim RPMs updates: glite-apel-core noarch.rpm glite-apel-lsf noarch.rpm glite-apel-pbs noarch.rpm glite-apel-publisher noarch.rpm lcg-info-dynamic-classicSE _sl3.noarch.rpm lcg-info-dynamic-classicSE _sl3.noarch.rpm lcg-info-templates _sl3.noarch.rpm lcg-mon-gridftp _sl3.noarch.rpm lcg-mon-job-status _sl3.noarch.rpm lcg-yaim noarch.rpm lcg-yaim noarch.rpm RPMs updates: glite-apel-core noarch.rpm glite-apel-lsf noarch.rpm glite-apel-pbs noarch.rpm glite-apel-publisher noarch.rpm lcg-info-dynamic-classicSE _sl3.noarch.rpm lcg-info-dynamic-classicSE _sl3.noarch.rpm lcg-info-templates _sl3.noarch.rpm lcg-mon-gridftp _sl3.noarch.rpm lcg-mon-job-status _sl3.noarch.rpm lcg-yaim noarch.rpm lcg-yaim noarch.rpm

Enabling Grids for E-sciencE INFSO-RI GDB September Main Problems APEL_HOME environment variable not set –Broke cron jobs –Developer integrator communication  Not mentioned in the patch submission  Long discussions followed (after the release) MON BOX –In 2_6_0 GridICE moved to the Mon-Box –Formerly only R-GMA –We forgot to add a correctly configured GRIS to the box Dependency problems –We use SLC-3 from CERN for integration (security) –Some sites have encountered dependency problems  All have been solved

Enabling Grids for E-sciencE INFSO-RI GDB September Other “Problems” Sites move to new version and encounter: + apt-get update Get:1 apt/LCG_CA/en/i386 release [351B] Fetched 351B in 0s (8641B/s) Hit apt/LCG_CA/en/i386/lcg pkglist Hit apt/LCG_CA/en/i386/lcg release Reading Package Lists... Done Building Dependency Tree... Done + apt-get upgrade-kernel Reading Package Lists... Done Building Dependency Tree... Done You might want to run `apt-get -f install' to correct these. The following packages have unmet dependencies: lcg-MON: Depends: tomcat4 (>= full.1jpp) but it is not installable Depends: edg-java-security-tomcat4 (>= _sl3) but it is not installable E: Unmet dependencies. Try using -f. + apt-get dist-upgrade Reading Package Lists... Done Building Dependency Tree... Done You might want to run `apt-get -f install' to correct these. The following packages have unmet dependencies: lcg-MON: Depends: tomcat4 (>= full.1jpp) but it is not installable Depends: edg-java-security-tomcat4 (>= _sl3) but it is not installable + apt-get update Get:1 apt/LCG_CA/en/i386 release [351B] Fetched 351B in 0s (8641B/s) Hit apt/LCG_CA/en/i386/lcg pkglist Hit apt/LCG_CA/en/i386/lcg release Reading Package Lists... Done Building Dependency Tree... Done + apt-get upgrade-kernel Reading Package Lists... Done Building Dependency Tree... Done You might want to run `apt-get -f install' to correct these. The following packages have unmet dependencies: lcg-MON: Depends: tomcat4 (>= full.1jpp) but it is not installable Depends: edg-java-security-tomcat4 (>= _sl3) but it is not installable E: Unmet dependencies. Try using -f. + apt-get dist-upgrade Reading Package Lists... Done Building Dependency Tree... Done You might want to run `apt-get -f install' to correct these. The following packages have unmet dependencies: lcg-MON: Depends: tomcat4 (>= full.1jpp) but it is not installable Depends: edg-java-security-tomcat4 (>= _sl3) but it is not installable Tomcat dependency not met. NO MIDDLEWARE Problem Tomcat dependency not met. NO MIDDLEWARE Problem Solution is in the error message

Enabling Grids for E-sciencE INFSO-RI GDB September Other “Problems” GLUE-1.2 requires top level BDIIs to be upgraded –Stated in the the release node –Very compact instructions available –New BDII changed to handle schema evolution better Many sites missed this in the release notes On August 5th I sent a reminder to upgrade –Benchmark: 20 minutes  reading the documentation + upgrade (1RPM) –Almost all sites did this without a problem One site tried to cut corners –Changed the schema used by an old BDII to GLUE-1.2 –This created some problems (we had tried this before) –Site manger was in a bad mood for while…….

Enabling Grids for E-sciencE INFSO-RI GDB September Sites Moving To LCG-2_6_0 Upgraded Sites n days after the release – 5: 14 –10: 28 –15: 37 –20: 47 –25: 56 –30: 69 –35: 85 Additional: LCG-2_6_0 client libs accessible on 2_4_0 WNs –Installed in user space, selection via JDL –Installed on 25 additional sites successfully –Failed on ˜30 sites  No space on shared file system  Strange access privileges  Fabric management blues…… Upgrade speed: 2.4 sites/day Former releases:

Enabling Grids for E-sciencE INFSO-RI GDB September Prep for LCG-2_7_0 Post Mortem + Shopping List August 3rd: Internal 1st draft –After the release is before the release! –Several iterations –Feedback from developers August 30th –Sent material to ROCs, CICs, RollOut and EIS for feedback –Received up to now  3 internal comments and updates (priorities, preferences, status of components..)  5 external comments and questions The list can be seen here: List-LCG_2_7_0List-LCG_2_7_0

Enabling Grids for E-sciencE INFSO-RI GDB September Prep for LCG-2_7_0 When will it be ready? –To meet October 1st we have to stop integrating on Friday the 9th  Internal certification, deployment tests by 3 ROCs, fixing found bugs –23 major subjects  Many require development work to start or to finish  Not all have same priority  Data management related ones + security should be in the release  SC-3 relevant changes drive the process –In addition work from the postmortem (see next slide)  Mainly on documentation If we freeze LCG-2_7_0 in time we will have not much in it –Need an alternative strategy during the SC3s

Enabling Grids for E-sciencE INFSO-RI GDB September Postmortem –Closing door for changes is almost impossible  Interdependency of services and activities –Certification Tests are no longer in sync with the services  New services, new functionality –Performance tests needed –Documentation of installation and configuration  Old services almost sufficient  New services need to improve text based documentation –Process: We had an open critical bug in Savannah on the RB  Check of Savannah before release –Effect of “junk data” in the info system (possible?) –Patches have to come with a standard set of information  Ports, variables, config changes…. –Deployment tests by the 3 ROCs  Very useful  1 week to prepare packaging to give release to ROCs  1 week for ROCs to test and report  1 week to fix and finalize packaging

Enabling Grids for E-sciencE INFSO-RI GDB September Plan(s)? Upgrade SC relevant services at the T1s –Whenever ready –T1s experience can be used as deployment test –Handle these as upgrades to LCG-2_6_0 –Add client libs in user space (when needed) Work continuously on tests and documentation With sufficient material accumulated –Cut a new release –Starting point for sites joining

Enabling Grids for E-sciencE INFSO-RI GDB September Summary Changes during the SCs have to be addressed rapidly –Incompatible with fixed and well defined release schedule LCG-2_6_0 was released one month after 2_5_0 –Delayed due to  Late components  Testing The release had less problems than 2_4_0 –Speedy adaptation –Dependency problems will be with us for ever….. Need to improve tests and documentation LCG-2_7_0 will not make October 1st deadline –Need to change the release strategy during SCs