C ALIFORNIA C OASTAL C OMMISSION S OUTH C ENTRAL C OAST D ISTRICT S LIDE 1
I TEM T U 9 A S LIDE 2 Project Location
I TEM T U 9 A S LIDE 3 Linden and Casitas Pass Interchanges (1.1 miles) Linden and Casitas Pass Interchanges (1.1 miles) Ventura / Santa Barbara HOV Lanes (6.0 miles) Ventura / Santa Barbara HOV Lanes (6.0 miles) South Coast 101 HOV Lanes (10.9 miles) South Coast 101 HOV Lanes (10.9 miles) Milpas to Hot Springs Operational Improvements (2.0 miles)
I TEM T U 9 A S LIDE 4 09_11_15 Bike Path
I TEM T U 9 A S LIDE 5 4,000 linear foot shared use bicycle and pedestrian access pathway Proposed 110-foot span prefabricated bridge over existing UPRR rail tracks
I TEM T U 9 A S LIDE 6
I TEM T U 9 A S LIDE 7 Pacific Ocean Carpinteria Slough UPRR Tracks Coast Route Bike Path To Carpinteria To Santa Barbara
I TEM T U 9 A S LIDE 8 Transportation Corridor Wetland Overlay District
I TEM T U 9 A S LIDE 9 Transportation Improvement Portion of Whitney Parcel
I TEM T U 9 A S LIDE 10 Whitney Site Agriculture Overlay District
I TEM T U 9 A S LIDE 11 Linden and Casitas Pass Interchanges (1.1 miles) Linden and Casitas Pass Interchanges (1.1 miles) Ventura / Santa Barbara HOV Lanes (6.0 miles) Ventura / Santa Barbara HOV Lanes (6.0 miles) South Coast 101 HOV Lanes (10.9 miles) South Coast 101 HOV Lanes (10.9 miles) Milpas to Hot Springs Operational Improvements (2.0 miles)