Status of the DCS Richard Brenner (Uppsala University) " Structure of the DCS " Cabling of DCS sensors " Interlock " Status and near future plans
Structure of DCS
DCS seen by SCADA
SCT DAQ SCADA (LCS) supervisory partition LAN SCADA (LCS) partition cooling SCADA (LCS) partition environment & alignment SCADA (LCS) partition power FSI system CAN IL LMB IL LMB IL LMB LAN IL Power supply crate IL Power supply crate IL Power supply crate Interlock Environment monitoring
Monitoring points in barrel SCT
Monitoring points in forward SCT
Sensor 1 Sensor 20 Omnetics connector ELMB PP3Thermal Shield SCT Barrel/Disk CAN bus 30 m USA15 LCS ATLAS Routing of DCS sensors
Cables for DCS sensors
Interlock SCT DAQ SCADA (LCS) supervisory partition LAN SCADA (LCS) partition cooling SCADA (LCS) partition environment & alignment SCADA (LCS) partition power FSI system CAN IL LMB IL LMB IL LMB LAN IL Power supply crate IL Power supply crate IL Power supply crate Interlock
Interlock connection cooling- power supplies
Status on deliverables " A FDR document is in preparation which has been a reference document in some FDR of SCT subsystems " Deliverables have been specified and costs are being updated " First final ELMB units are available
Near future activities " This autumn work on combining power supplies, cooling and environment under PVSS main task. Work will be done both in the system test lab and the cooling lab. " Early 2002, get a full DCS system going in Oxford Team: S. Basiladze, R. Brenner, R. Waistie, P-O. Wallin...
Near future activities (cont.) " Need to proceed with FDR/PRR in order to buy a large fraction of the final DCS components.