IEFC Workshop 2011 Session 2: “MTE and High Intensity Operation” Short summary/Follow-up items V.Mertens / T.Zickler Presentations: M.GiovannozziMTE Roadmap.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
20/01/09 OPERA general meeting Nagoya CNGS report.
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Application Development for Operations in the Coming Years Mike Lamont.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
MTE vs CT D.Manglunki for BE/OP - pictures from M.Giovannozzi - details in “Fifty years of the CERN Proton Synchrotron (Vol I)” CERN
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
CERN, LIU-SPS ZS Review, 20/02/ Brief review on electron cloud simulations for the SPS electrostatic septum (ZS) G. Rumolo and G. Iadarola in LIU-SPS.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
MG - IEFC Workshop MTE status and outlook for 2012 M. Giovannozzi Introduction Recap of 2011 activities Activities before LS1 Milestones Acknowledgements:
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
SPS availability K. Cornelis Acknowledgments : A. Rey and J. Fleuret.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
Summaries and conclusions of the MTE Workshop
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
J.-L. Sanchez Alvarez(PSB-EIC)
LIU Wire Scanner Milestones June 2017
EC Activities Status for the LIU
Emittance growth AT PS injection
TE-ABT Activities for LS2
Status of the BI Work Package in the LIU-PSB frame
Thursday morning – optics correction
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
CNGS Primary Beam Results 2010
Interlocking of CNGS (and other high intensity beams) at the SPS
CNGS Primary Beam Results 2011
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
SPS Injection BIS - Draft requirements
Presentation transcript:

IEFC Workshop 2011 Session 2: “MTE and High Intensity Operation” Short summary/Follow-up items V.Mertens / T.Zickler Presentations: M.GiovannozziMTE Roadmap - Beam Physics Aspects R.SteerenbergMTE Roadmap seen from OP J.BorburghRequirements and Constraints for ABT Equipment J.-J.GrasBI Improvements across the Complex K.CornelisHigh Intensity Beams and their Performance B.PuccioMachine Interlocks

MTE Roadmap – Beam Physics Aspects V.Mertens/T.Zickler – IEFC WS session 2 action plan – MTE used in operation in early e13 p in 1 PS extraction to CNGS Extraction efficiency % (CT 93-94) SPS transmission of MTE beam ≤ 94 % (inj. optics not matched for islands) Losses concentrated on SMH16 (2-3 x) Fluctuating PS trapping efficiency Reason not known yet – no clear correlations Lots of data analysed, and still to analyse Fluctuations longer than one cycle Most losses occur and injection/start of ramp Fluctuating SPS injection trajectories Mitigation + tests (ongoing/to come): Dummy septum in SS15 (LS1) to concentrate losses on a low-maintenance device (??) Testing new extraction (using SEH31) – feasibility not clear yet (w/o dummy septum ??) Check correlations with B-field fluctuations (first attempt fooled by ADC prb), POPS Cycle setting-up with INCA slow, noisy tune measurement, instruments precision ? Manpower barely sufficient for studies – rely heavily on OP to drive + CO, BI, … support Gaps in beam not acceptable (SPS RF limitation) – final word ? MTE-related increase on septum 16 Typical CT situation MTE-related decrease in the PS ring Conclude on by mid 2011 CT likely to be needed beyond LS1

MTE Roadmap seen from OP V.Mertens/T.Zickler – IEFC WS session 2 action plan – PS benefits – less irradiation (equipment (except SS16 …) + environment) Removes intensity bottleneck, and opens way to further optimisation If not done, Linac4 and PSB/PS upgrade possibilities cannot be fully exploited SPS short term benefit – (just) less spiky spill structure Longer term prospects for neutrino physics etc. MTE uses equipment (e.g. BI) in different ways (usually more demanding) Developments for MTE benefit OP in general Problems of measurement precision (BCT, …) “Shooting on a moving target” (fluctuations) with a spreading gun (instruments precision) OP favours dummy septum (over potential hybrid MTE/CT system) Main focus on understanding the fluctuations Matter of priority (cycles, time + manpower to prepare/carry out/analyse MDs) How to follow up issues and to get improvements rapidly implemented ? PS SPS

Requirements and Constraints for ABT Equipment V.Mertens/T.Zickler – IEFC WS session 2 action plan – Need to overhaul (broken) SEH31.3 in 2011 as oper. spare (SEH31.2 too hot for now) Lots of CT equipment “obsolete” (no investment in past years in view of MTE operation) (controls, electrical distribution, interlocks, PVC HV cables, other safety concerns, …) can only be done in LS1 Consolidation for MTE infrastructure (not done due to lack of time and to keep cost low) Need to exchange operational SEH16 in TS2011/12, and start building additional spare “Spoiler” (in SS16) not useful Dummy septum (in SS15) will have good effect (10-40 x in SS16, 3-5 x for local stray radiation) Cost estimate for new generators (3 times faster kicker rise time ?) to be re-made (new building needed (MCHF !) – B367 re-affected to POPS) Cost (MCHF)Resources (MY) CT 1.65 MTE 1.66 MTE- CT hybrid 2.49

BI Improvements across the Complex V.Mertens/T.Zickler – IEFC WS session 2 action plan – Presentation not focused on MTE only, but intended to cover also LIU, consolidation, … Ongoing consolidation, concentrated mainly on modern acquisition chain (electronics, SW, preserving existing monitor (yet trying to get best poss. performance) New requirements (MTE, LIU, …) can be partly incorporated, some others require different approaches (and level of effort) Went through list of instruments: SEM, wire scanners, BLM, BCT, orbit, tune/chroma, …. Lots of questions after presentation … Clear, consistent and agreed specifications needed (not just “as good as possible”) Reaction: What is the present performance ?? Not so clear, and not easy to say (at least time consuming) Specifications will define funding (LIU), time scales, priorities, … Problems of rapid drift (resp frequent loss) of calibration (TT2 BPM) – specialists needed “BI supervisor” should be beneficial – role to be defined.

High Intensity Beams and their Performance V.Mertens/T.Zickler – IEFC WS session 2 action plan – N p = N days * Intensity * Duty cycle * Availability Beams looked at: CNGS, FT (COMPASS + NA62), nTOF, future v facilities, LHC25 CNGS: Losses in PS raise strongly with intensity (not linearly) Direct limitations (Route Goward, SMH16), but also higher wear on equipment (also SPS) Better to run with lower intensity and higher duty cycle MTE needed to overcome PS bottleneck SPS limitations: RF power, vertical aperture FT: Reduced duty cycle (concurrency of LHC, CNGS) led to request higher intensities/cycle Limitations (other than above): ZS losses/spark rate, splitter losses  max 4e13 I rms of MPS (SPS-FT can not be used alone …) Perturbations from unscheduled cycle changes (LHC setting up/filling) Technical stops re-scheduling on short notice LHC25: Beam dynamics (RF, e-cloud, TMCI  adressed by LIU) Kicker performance (ripple)  demanding for SPS damper (high power, high gain) Stress on SPS dump from prolonged setting up (step-wise) and MD Kicker heating (addressed by LIU) Duty cycle optimisation as important as record intensities. Losses S16

Machine Interlocks V.Mertens/T.Zickler – IEFC WS session 2 action plan – Presentation focused on BIS = Beam Interlock System (VME based), also SIS (Software Int’lk System) WIC = Warm magnet Interlock Controllers (PLC based) Highly reliable (available) systems, generic, well integrated, good software tools Rely on continued good collaboration with EN-ICE (WIC) Clear plans for coming years (pink below = ready for after LS1, resp. before) Manpower barely sufficient (planned deployments and maintenance), tight planning + ISOLDE, ELENA PS (100 main + 50 aux magnets)  15 crates (only study for time being) SPS (900 magnets)  24 crates (presently no resources to tackle such a big inst.) Spare situation for present SPS “WIC system” (TE-MSC) – a concern ?? No decision yet for PS deployment