ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Myriam Newman April 13, 2007 Laser-Wire 1 Myriam Newman LC-ABD Meeting University of Oxford Thursday, April 13 Lens Performance Review Laser-Wire Team.
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Nick Walker KEK-DESY meeting 7 th March 2005.
Latest laser-wire results ● How does a Laser-Wire work? ● Latest ATF results ● Focusing optics ● Latest PETRA results University of Oxford: Nicolas Delerue,
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
P.N. Burrows ATF2 Project Meeting, KEK, 18/12/061 Philip Burrows John Adams Institute Oxford University LCABD ATF / ATF2 ESA Miscellaneous FONT.
Optics for Skew Correction and Emittance Measurement Leo Jenner This talk is going to look familiar if you were at the recent LC-ABD meeting in Manchester…
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
NanoBPM schedule California Institute of Technology Toyoko Orimoto Cornell University Robert Meller DESY Vladimir Vogel KEK Hitoshi Hayano, Yosuke Honda,
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
1 ATF Status LCPAC K.KUBO Introduction Emittance Single bunch and multi-bunch in DR Extracted beam Wiggler study Other experiment, Instrumentation.
What’s already existing?What’s already existing? Laser system & impacts on Optics TransportLaser system & impacts on Optics Transport –Laser power –Focusing.
Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
Laser-wire Measurement Precision Grahame Blair Beijing- BILCW07, 6 th February 2007 Introduction Overview of errors Ongoing technical work in this area.
Laser Wire: :LBPM G A Blair EUROTeV Scientific Workshop, Uppsala 27 th August 2008 Introduction Emittance extraction Experimental programme Laser R&D Summary.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
12/12/04 1 Stewart Boogert (UCL) Second Mini-workshop Nano project at ATF LBBD-collaboration Laserwire update Adams Institute (Oxford/Royal Holloway) G.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
3/25/2006 KEK LCPAC Marc Ross - SLAC 1 Results of Beam Instrumentation Studies at ATF 1.Nanometer resolution Beam Position Monitors 2.High resolution readout.
Special Lecture- ATF The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK ILC School at KEK History and Machine.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
4 th Meeting of the ATF Technical Board and System/Group Coordinators Cockcroft Institute Daresbury, UK May, 2007.
Laser-wire at ATF2 and PETRA Grahame Blair CERN, 18 th October 2007 Introduction Overview of errors Ongoing technical work in this area Plans for the future.
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.
CLIC-UK Collaboration CERN, May 9 – 11, 2012 Pavel Karataev John Adams Institute for Accelerator Science at Royal Holloway, University of London.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
L ASER - WIRE U PDATE Commissioning of the PETRA3 Laser-wire Summary of first ATF-ext laser-wire Installation of ATF2 laser wire Grahame Blair CLIC Technical.
Diagnostics Workpackage G A Blair EUROTeV Final Meeting, DESY, Hamburg 30 th January 2009 Tasks Summary.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 RTML Emittance Measurement Station Yuri Kubyshin (1), Robert Apsimon (2), Hector García (1,2) (1) Technical University of Catalonia (UPC) (2) CERN CLIC.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
3rd September 2004 G. Blair, RHUL1 Laser Wire Update G. A. Blair Royal Holloway Univ. London ECFA LC Workshop Durham 2 nd September 2004 Laser-wire at.
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
Testbeam plans for LEP instrumentation
Plans for Laser-wire System Grahame Blair 30th May 2005
Laserwire: high resolution non-invasive beam profiling
Beam Size Monitor Model
Diagnostics Summary G. Blair RHUL 23rd June 2005
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
ATF2 Instrumentation Stewart T. Boogert
Junji Urakawa (KEK) for ATF International Collaboration
Junji Urakawa ( for collaborators ) March KEK at LNF
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Laser-wire Measurement Precision
Presentation transcript:

ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31 st May 2006

Oxford B. Foster, N. Delerue, S. Dixit, F. Gannaway, D. Howell, M. Qureshi, A. Reichold, R. Senanayake Royal Holloway (UL) A.Agapov, G. Blair, S. Boogert, G. Boorman, A. Bosco, J. Carter, L. Deacon, P. Karataev, M. Price CCLRC Daresbury L. Jenner KEK A. Aryshev, H. Hayano, K. Kubo, N. Terunuma, J. Urakawa SLAC A. Brachmann, J. Frisch, M. Ross ATF Laser-wire Project web page:

ATF Laser-wire At ATF, we will aim to measure micron-scale electron spot-sizes with green (532 nm) light. Aim at intra-train (fast) scan for 150 ns bunch spacing. The final spot-size measurable at ILC will have implications for the length and layout of the BDS diagnostics section. The ATF/ATF2 results will be crucial to determine the technical boundaries. pulsed laser-wire location

ATF Laser-wire Vacuum chamber built in Oxford and Installed in ATF extraction Line in December Laser light transported to IP. Commercial lens for early tests Upgrade to f2 optics in Autumn 06.

Collisions Seen Left: scope traces of Cherenkhov detector signal Top: laser shutter closed Bottom: laser shutter open

Z= 9.5 Z= 10.0Z= 10.3 Z= 10.5Z= 10.7 Z= 11.0 Z= 11.5 Z= 12.5 Vertical scans at different laser-z positions

Scan of laser waist with electron beam

ATF LW Plans Data runs ongoing More runs 06/07; lots of systematics to understand (eg beam jitter, BPM integration …) Integrate solid wire scanner into vac. vessel design Iteration on lens design. Provide statement to GDE on technical feasibility of reliable micron-scale LW Longer term: Play a major role in ATF2 LW system. Multiple IP’s, laser system, light transport. Investigate LW emittance measurement scheme for ILC. Investigate frequency tripled light?

ATF2 LW Plans A Staged approach is most likely New funding proposal is currently in preparation for the period Outcome should be known around end of 2006 Depending on outcome of this proposal: Start with installation of laser hut First stage of light transport system Single 2-D LW-IP system Test performance of this LW IP.

Laser hut 2-d LW IP DetectorCollimation Possible Stage 1 Test design of 2-D IP: if OK, can build additional ones Light path = evacuated 4” pipe, containing relay optics Full Light pipe may need to be installed at stage 1

Laser hut 2-d LW IP DetectorCollimation Possible Stage 2 Understand how to operate two IPs and analyse results If all is well, can extend to rest of system:

Laser hut 2-d LW IP DetectorCollimation Possible Stage 3 Final number of IPs will depend on level of funding

Summary ATF LW is very active and producing results We expect this to continue into 2007 Subject to new funding, an exciting ATF2 programme is planned Multi-station LW IP system A staged approach is advisable, building over the first few years of ATF2 operation.