1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.

Slides:



Advertisements
Similar presentations
J.P. Langston Brake Retrofit
Advertisements

NCSX Mod Coil C1 features requiring rework at PPPL.
LWIR FPA Mirror Image Problem & Recovery April 11, 2011 Roy W. Esplin Dave McLain.
Mechanical Engineering Design Review BL ARPES Endstation Derek Yegian, Jonathan Denlinger, Keith Franck 4/18/2008.
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Click on this image to open the full PDF document.
Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013.
Deviations from fiducial locations are unacceptable in areas despite high accuracy at alignment points.
"AIR COOLER" Heat Exchanger
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
1 MC Assembly via Test Cell Crane FPA Stage 3 Peer Review August 12, 2005 T. Brown.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
MC Type-B fit up review1 Review of MC Type B assembly clearances reviewing A-to-B and B-to-C interfaces 3/1/07 Summary: Wing interfaces look okay between.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) – Stage 3 1.Make sure the requirements for the tooling is well defined.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy LCLS Girder Support Concept Design Sushil Sharma.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
1 MC Assembly over the VV FPA Station 3 FDR Review July 17, 2007 T. Brown.
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
IRMOS Diffraction Grating Integral Tab Design  Performance of an optical system is highly sensitive to the surface distortion of the optics in the system.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
Shear Test Assembly update
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
SC Project Review of NCSX, April 8-10, 2008 NCSX Field Period Assembly Mike Viola NCSX Field Period Assembly Manager NCSX Project Review April 8-10, 2008.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
LARP Collaboration Meeting Racetrack Coil Fabrication
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
1 Modular Coil Assembly Fixture (MCAF) Information Meeting February 23, 2005.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
1 FPA Stage 2 MC Flange Assembly Issues and Design Proposals June 20, 2006 T. Brown.
1 MC B3 Inspection MTM data: dated 12/22/06 1/6/07 Pro/E model: b3_mtm_data_check.asm T. Brown / D. Williamson.
1 MC B1 Inspection MTM data: FIDUCIALS.IGS DATA.IGS 9/26/06 Pro/E model: b1_mtm_data_check.asm.
1 VV Support Fixture FPA Stage 1 PDR Review August 10, 2005 T. Brown.
Stator Plan & Schedule Chris Booth 2nd March 2009
GLAST Large Area Telescope:
FFAG Magnets and Girders Meeting
Experimental equipment Edgar L. Black February 17, 2019
Presentation transcript:

1 FPA Stage 2 Peer Review May 12, 2006 T. Brown

2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details Look at D-site layout

3 FPA Stage 2 Activities Assemble a MCHP Bolt flanges together with shear capacity at some locations. –Possibility for reamed holes, matched tooling or epoxy filled holes. Install a half dozen magnetic loops on MCHP Set up a magnetic alignment system and validate it’s operation with a C-to-C connection (one time operation). Complete a full period assembly using magnetic alignment, with the success of C-to-C test. Perform alignment and electrical checks along the way.

4 An adjustable support stand is used to construct the MCHP Back stiffening structured added. Original configuration The stand has been revised to increase lateral stiffness. The center support is removed to accept Type-C MC

5 Type-A Type-B on A Stand repositioned to receive Type-C Type-C added along with supports MCHP Assembly Sequence

6 C-to-C coils are joined for interface check and to validate the magnetic alignment system Support brackets are added to support the MC when used with the magnetic alignment system.

7 The adjustable support stand drawings are finished and the analysis is “almost” complete and ready for a final design review.

8 An overlooked requirement has surfaced. Approximately 20 MC saddle loops need to be added to the MC’s over the full machine, not equally distributed. Question – can they be placed on a MCHP?

9 Magnetic alignment system The C-to-C set-up is used to validate the alignment method. Fiberglass tube with 20 wire loops on each side of the parting plane. A single hanger can be attached to reduce deflection. Shim stock is needed at the base of the aligned MC

10 Magnetic alignment system for FPA Used to validate mechanical alignment of a full period assembly and identify adjustments as needed Shim stock is needed at the base of the aligned MC

11 Flange activities….. This is not well defined at this time.  Three spherical are set to establish MC alignment  (machined?) shims are added to match orientation  Insulated bushings are installed. Some are reamed to provide shear capacity. Every MC has some studs. Type- A has a lot. A-to-A shear connection with 0.75” Ø holes

Ø hole Ø stud.125” radial clearance (excluding insulation) Just starting to play with this but; With an 040” axial movement dx, dy, dz) and a.05° rotation (rx, ry, rz) the stud and hole clearance is.059” and there is a 0.36” wing clearance. As-built conditions need to be considered.

13 Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 MC Fab Ron’s Current FPA Schedule Stage 2 schedule revised to current assembly arrangement. Stage 3 Stage 2 No change in Stage 3 schedule One set of Stage 2 fixtures Reqd

14 Plan View – Field Period Assembly Stages Stage 1 Stage 3 Stage 1 Stage 5 Stage 2 Stage 4 Completed prior to Stages 3 and 5 Move out. C site operation