HiRadMat : report from WG2 – WANF dismantling December 10, 2009S. Evrard 1 WANF cleaning T1 removal Access and Ventilation hardware Integration : naming.

Slides:



Advertisements
Similar presentations
Single Window Government: Benefits and Limitations of Single Window Government Jackie Coolidge Lead Investment Policy Officer, IFC January 26, 2005.
Advertisements

SESAME Radiation Safety and PSS Phase I : Microtron + Booster Morteza Mansouri on behalf of Safety group TAC SESAME TAC 2013 : Morteza Mansouri.
HIGH RADIATION TO MATERIALS WG3 – E XPERIMENTAL A REA HiRadMat project Team Meeting 03/0/2011 T9 transformation Repeatability test of experimental area.
TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
IT-3872 Refurbishment of the piping of the chilled water circuit of the Proton Synchrotron Alexandre Broche EN-CV-PJ.
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
HIRADMAT IN THE WANF TUNNEL I. E FTHYMIOPOULOS, EN/MEF  HIRADMAT-Exp.Area Working Group  EN/MEF : I. Efthymiopoulos, A. Pardons, M.Lazzaroni, N. Gilbert.
HiRadMat : report from WG2 – WANF dismantling WG3 - Irradiation Area October S. Evrard 1 WG2&3 meeting organization Preliminary WBS for related.
Lessons learnt from WANF (*) dismantling Outline  Introduction  WANF/HiRadMat location  WANF operation  WANF dismantling  Preparation  Dismantling.
Computerized Maintenance Management Working Group Maintenance audit preparation meeting 2 nd May 2011 I. Rühl.
Rodents December, January Oral Mr. Steinberger.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
TOWN & PARISH SEPTEMBER TRAINING SESSION. Agenda Overview of precept setting process Overview of Tax Base calculation Explaining the Council Tax calculation.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
Managing the LHC Experimental Area Point 5, CMS: Martin Gastal (PH/CME) Point 1, ATLAS: François Butin (TS/LEA) Point 2, Alice: Sebastien Evrard (TS/LEA)
Candlewood Elementary School + + * * January 19 th : MLK Holiday January 26 th -30 th : School Book Fair January29th: Awards & Family Literacy Night February.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
EN-CV interventions during YETS
WEEK 1 You have 10 seconds to name…
HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Montana Comprehensive Assessment System MontCAS Guidelines and Procedures for Test Security
Home Improvement Technical Services LLC. Home Improvements Technical Services LLC is one of the leading Home Repair Service Contractors in Dubai. Contact.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Phoenix Technology Solutions Products At the highest level, the products offered by Phoenix Technology Solutions are: IT Project/Programme Management.
LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA Dimensions of 1 iron brick  100 x 100 x 200 mm3 1 ROW of 1200 mm length  12 iron blocks.
ARMS TEXTILE….. WEL - COME
Montana Office of Public Instruction Linda McCulloch Superintendent 1 Montana Comprehensive Assessment System MontCAS Guidelines and Procedures.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA Dimensions of 1 iron brick  100 x 100 x 200 mm3 1 ROW of 1200 mm length  12 iron blocks.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
The HiRadMat Facility Outline  Location  Status  WANF dismantling  Beam line  Experimental area  Schedule  Project management S. Evrard – EN/MEF.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
HIRADMAT/ IRRADITION facilities Overall view with the biggest object to irradiat, T9 shielding with TED inside and the beam dump with 12 meters of cast.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
ALBANIA Report in ICT development Albania is a member of eSEE WG and in this framework its achievements are: eSEE Agenda commitment 1.Adoption of National.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
New Marketing Opportunity The Brokerage, Inc. and Liberty Tax.
MKT 230 Week 9 Final Project Marketing Plan To purchase this material click below link 230-Week-9-Final-Project-Marketing-Plan.
ALICE 5 o’clock meeting Wk 51.
Gordon Elder Outpatient & Medical Records Manager
Julie Coupard Schedule and Coordination
IBL CO2 cooling control system development status
Company Registration: Procedure that one needs to follow Company Registration: Procedure that one needs to follow
IT-4328/EN Bidders conference
Procedure To Remove AVG From isearch.
Attic InsulationAttic Crawl Space Cleanup Crawl Space Floor Insulation Rodent Proofing & Rodent ControlThermal Imaging Home Inspections.
Electrical Contractors
Duval High School Year WORK EXPERIENCE Duval High School Year
January 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2018] Date.
March 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for March 2016] Date.
TGh Status, meeting objectives and agenda
Beam Line to the HiRadMat Test Facility
Installation of New Officers
ETS WG, 30 January-1 February 2006 Agenda Item
Duval High School Year WORK EXPERIENCE Duval High School Year
doc.: IEEE <doc#>
East Hall under construction
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
SPS Planning meeting for LS2 #26 Vacuum sectors status
doc.: IEEE <doc#>
Presentation transcript:

HiRadMat : report from WG2 – WANF dismantling December 10, 2009S. Evrard 1 WANF cleaning T1 removal Access and Ventilation hardware Integration : naming convention Short Term Planning : co-activities in January 2010 Long Term Planning Agenda

WANF cleaning December 10, 2009S. Evrard 2 Technical specification worked out with RP : WANF cleaningWANF cleaning PE launched (S. Sonnerat, purchase officer) 4 companies enquired (all contacted): –Cerap (F, Mr X. Labat) –Salvarem (F, Mr B. Agret) –Techman (F, Mr O. Rotelle) –Technubel (B, Mr K. Lenie) Deadline offers return: Tues Work foreseen in week 4 (18  22 January)

T1 removal December 10, 2009S. Evrard 3 MCA + 6 TAX blocks Procedure prepared by EN/HE Forklift shielding study in progress Forklift preparation in Weeks 2 Work foreseen in week 3 (11  15 January)

ACCESS December 10, 2009S. Evrard 4

Ventilation door December 10, 2009S. Evrard 5

Co-activities in January 2010 December 10, EN-HE EN-CV Contractor EN-HE GS-ASE, IT-CS EN-HE: T1 : MCA + Tax blocks EN-HE: furet removal EN-HE: Electrical cabinet refurbish.