SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,

Slides:



Advertisements
Similar presentations
H.-G. Moser Max-Planck-Institut für Physik MPI Semiconductor Laboratory (Halbleiterlabor: HLL) Common project of the: Max-Planck-Institut fuer Physik (Werner.
Advertisements

H.-G. Moser Max-Planck-Institut fuer Physik 2 nd open meeting July 4, 2008 Report on PXD Session.
2nd Open Meeting of the SuperKEKB Collaboration, KEK, March 2009 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Sensor R&D and Prototyping - Status -
Kailua-Kona, Marcel Trimpl, Bonn University Readout Concept for Future Pixel Detectors based on Current Mode Signal Processing Marcel Trimpl.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
Presentation at the PRC review, , DESY Status of DEPFET pixel detectors for ILC Peter Fischer for the DEPFET collaboration Bonn University:R.
Hamburg, Marcel Trimpl, Bonn University A DEPFET pixel-based Vertexdetector for TESLA 55. PRC -MeetingHamburg, Mai 2003 M. Trimpl University.
DEPFET Electronics Ivan Peric, Mannheim University.
Monolithic Pixels R&D at LBNL Devis Contarato Lawrence Berkeley National Laboratory International Linear Collider Workshop, LCWS 2007 DESY Hamburg, May.
2. Super KEKB Meeting, DEPFET Electronics DEPFET Readout and Control Electronics Ivan Peric, Peter Fischer, Christian Kreidl Heidelberg University.
ECFA ILC Workshop, November 2005, ViennaLadislav Andricek, MPI für Physik, HLL DEPFET Project Status - in Summary Technology development thinning technology.
SuperKEKB 3nd open meeting, July Hans-Günther Moser MPI für Physik PXD Summary Other talks in software, SVD and DAQ sessions.
ILC VXD Review, Fermilab, October 2007 Ariane Frey, MPI für Physik DEPFET Vertex Detector Simulation and Physics Performance Ariane Frey for the DEPFET.
SuperKEKB 2nd open meeting March 17-19, 2009 Hans-Günther Moser MPI für Physik PXD Session SOI: more information: see TIPP09 -> submission in February,
Vertex05, 8/11/05Jaap Velthuis, Bonn University DEPFET Status DEPFET Principle Readout modes Projects: –XEUS –WIMS –ILC ILC Testbeam results Summary &
Fully depleted MAPS: Pegasus and MIMOSA 33 Maciej Kachel, Wojciech Duliński PICSEL group, IPHC Strasbourg 1 For low energy X-ray applications.
Recent developments on Monolithic Active Pixel Sensors (MAPS) for charged particle tracking. Outline The MAPS sensor (reminder) MIMOSA-22, a fast MAPS-sensor.
1 Engineering issues for FPCCD VTX Detector Y. Sugimoto KEK July 24, 2007.
ILC VXD Review, Fermilab, October 23, 2007 Hans-Günther Moser, MPI für Physik DEPFET Devices Hans-Gunther Moser for the DEPFET Collaboration (
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
LCWS08, Chicago, November 2008 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Active Pixel Sensors - Status and Plans - Ladislav Andricek for the DEPFET.
H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Summary of PXD Session 1 Status of CAPSH. Hoedlmoser (Video)
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
The development of the readout ASIC for the pair-monitor with SOI technology ~irradiation test~ Yutaro Sato Tohoku Univ. 29 th Mar  Introduction.
Prague, Marcel Trimpl, Bonn University DEPFET-Readout Concept for TESLA based on Current Mode Signal Processing Markus Schumacher on behalf.
The Belle II DEPFET Pixel Detector
MIMO  3 Preliminary Test Results. MIMOSTAR 2 16/05/2007 MimoStar3 Status Evaluation of MimoStar2 chip  Test in Laboratory.
Design and Technology of DEPFET Active Pixel Sensors for Future e+e- Linear Collider Experiments G. Lutz a, L. Andricek a, P. Fischer b, K. Heinzinger.
The ultralight DEPFET Pixel Detector of the Belle II Experiment Florian Lütticke On behalf of the DEPFET Collaboration th.
Spanish Linear Collider Meeting, Valencia, December 2012 Ladislav Andricek, MPI für Physik, HLL 1 DEPFET APS for future collider applications -Status and.
1 DEPFET Readout Electronics Ivan Peric, Jochen Kinzel, Christian Kreidl, Peter Fischer University of Heidelberg.
Particle Physics School Colloquium, May C. Koffmane, MPI für Physik, HLL, TU Berlin  DEPFETs at ILC and Belle II  Module Concept  results with.
Hybrid Boards for PXD6 5th International Workshop on DEPFET Detectors and Applications Sept Oct Christian Koffmane 1,2 1 Max-Planck-Institut.
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Readout cycle: 10 µs or 20 µs ? Advantages of 20 µs: - smaller.
Simulation of a DEPFET Pixel Detector IMPRS Young Scientist Workshop July, 26 – 30, 2010 Christian Koffmane 1,2 1 Max-Planck-Institut für Physik, München.
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
1 Characterization of Pilot Run Modules for the Belle II Pixel Detector Felix Müller Max-Planck-Institut für Physik IMPRS Young Scientist Workshop Ringberg.
H.-G. Moser Max-Planck-Institut für Physik Future Vertex Detectors in HEP Projects: LHC (upgrade 2018+) Belle 2 (upgrade 2018+) ILC/CLIC (2020+)
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Barcelona Summary Thanks to our hosts for UB for a great meeting!
Jelena Ninković Testing PXD6 - summary and plans Jelena Ninkovic for the HLL team.
H.-G. Moser, 6 th PXD/SVD workshop, Pisa, Oct PXD Summary 1 DEPFET Sensors production yield inter-metal insulation EMCM electronic tests ASICs Schedule.
Data Handling Processor v0.1 Preliminary Test Results - August 2010 Tomasz Hemperek.
ASIC Review DCD. ASIC Review DCD is implemented in UMC 0.18 um CMOS technology 3.2mm x 5mm DCD-B uses bump bonding on the UMC technology.
TILC08, Sendai, March DEPFET Active Pixel Sensors for the ILC Marcel Vos for the DEPFET Collaboration (
H.-G. Moser Max-Planck-Institut for Physics, Munich Vertex07 Lake Placid, NY 9/25/2007 DEPFET Active Pixel Detectors H.-G. Moser on behalf of the DEPFET.
Clear Performance and Demonstration of a novel Clear Concept for DEPFET Active Pixel Sensors Stefan Rummel Max-Planck-Institut für Physik – Halbleiterlabor.
PXD ASIC Review, July 2015 Ladislav Andricek, MPG Halbleiterlabor Belle II PXD ASIC Review, the 2 nd …….. 1.
Andrei Nomerotski 1 Andrei Nomerotski, University of Oxford for LCFI collaboration LCWS2008, 17 November 2008 Column Parallel CCD and Raw Charge Storage.
H.-G. Moser Max-Planck-Institut fuer Physik DEPFET Meeting Heidelberg Sept DEPFET Geometry for SuperBelle Sensor Geometry Pixel Pitch Constant/variable.
1 Test of Electrical Multi-Chip Module for Belle II Pixel Detector DPG-Frühjahrstagung der Teilchenphysik, Wuppertal 2015, T43.1 Belle II Experiment DEPFET.
1 First large DEPFET pixel modules for the Belle II Pixel Detector Felix Müller Max-Planck-Institut für Physik DPG-Frühjahrstagung der Teilchenphysik,
PXD ASIC Review, Oct Ladislav Andricek, MPG Halbleiterlabor Belle II PXD Overview (An attempt to describe the) Interfaces between ASICs and the Experiment.
1 Run on 25. October. 2 Full-size DCD Price: at least 32 k€ Return: April 201  Less test possibilities Full-size chip Wire-bondable DCD Price: 6.75 k€
ASICs1 Drain Current Digitizer Chip (DCD) Status and Future Plans.
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Ivan Perić University of Heidelberg Germany
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Thinning and Plans for SuperBelle
The DEPFET for the ILC Vertex Detector
Gated Mode - System Aspects
Gated Mode - System Aspects
DEPFET Active Pixel Sensors (for the ILC)
Hans Krüger, University of Bonn
The Belle II Vertex Pixel Detector (PXD)
Development of the Data Handling Processor DHP
Lars Reuen, 7th Conference on Position Sensitive Devices, Liverpool
Yasuhiro Sugimoto KEK 17 R&D status of FPCCD VTX Yasuhiro Sugimoto KEK 17
Presentation transcript:

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher, DCD Prototypes under test, DHP: design phase More Information: Indico page of Ringberg Workshop: py?confId=466

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor Production Status Status at 2nd Belle II meeting (March): SOI wafer bonding at Tracit, France 30 SOI wafers received, processing in our own lab has started Presently: cleaning, oxygenation, alignment mask, first implantation: next week. Processed are 6 wafers + dummies

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Wafer layout Small test matrices with various pixel sizes; 50 µm x 50 µm.. 50 µm x 175 µm Technology variations (gate length L) 4 ½ module large matrices with most likely pixel sizes 5cm: 50µm x 75µm 5cm: 50µm x 100µm 3.5cm 50µm x 50µm 3.5cm 50µm x 75µm Important for timing!

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Favorized design (zoom)

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Favorized design (zoom) Pixel Clear Gate Source Drain

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Source (all connected, double pixel share one source) Drain (neighbour pixel share one drain, connected to one DCD channel) Gate (double pixel have gates connected & interleaved connection) To gate switcher To DCD Option: common source/drain: very compact (small pitch) but interleaved readout

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik DEPFET parameter model drain current 1. row “0“ “1“ “0“ 2. row3. row clear “1“ gate Read-Clear-Read for 3 neighboring matrix rows Including realistic RC loads for control and readout lines RC times critical: 80 ns sample-clear-sample just ok Capacitance depends on sensor length (drain lines) and number of pixels (drain capacitance)

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Changes for final production Thin oxides: for improved radiation hardness: d ox 200nm -> 100nm => small threshold voltage shifts => however: reduction of gain Shorter gates compensate gain loss due to thin oxide -> compensate by reducing L by 0.8 (6 µm -> 4.7 µm) improve gain (overcompensate) L ~ 4.0µm: g q ~ 600 pA/e (instead of 450 pA/e) needs plasma etching Tests/test structures on PXD6 production Extra thin oxide test planned in autumn

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik DEPFET Readout and Control ASICs DCD, Switcher: Heidelberg DHP: Bonn, Barcelona

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Switcher 3 Radiation tolerant layout in 0.35 μm technology 128 channels + Very fast - Operation up to 11.5 V Novel design: Uses stacked LV transistors, HV twin-wells and capacitors as level- shifters + No DC power consumption Tested up to 22 Mrad 9V out ‘SRAM’ 3V ‘SRAM’ 6V ‘SRAM’ 0V 3V 6V 9V 2ns

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Switcher 4 Uses radiation tolerant high voltage transistors in HV 0.35 μm technology 64 channels + fast enough + Possible operation up to 50 V (30V tested) + low DC power consumption Enclosed design of NMOS HV transistors Should be rad hard (to be tested) Final chip: only 16 or 32 channels

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik DCD »- Technology 0.18 μm »- 72 Channels »- 2 ADCs and regulated cascode/channel »- 6 channels multiplexed to one digital LVDS output »- ADC sampling period 160 ns (8 bits) »- Channel sampling period 80 ns »- LVDS output: 600 M bits/s »- Chip: 7.2 G bits/s (12 outputs) »- Radiation tolerant design »- ~ 1mW/ADC

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik DCD Layout for Belle II: 160 channel chip, bump bonded Radiation hardness tested up to 7 Mrad

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik DCD Tests Works almost at design frequency (540 MHz: 88ns line rate) (works still at nominal 600 MHz, but with higher noise) Noise level: 90nA with 450 pA/e: 200 e ENC (S/N = 20:1)  Some bugs discovered, improved version will be submitted  Push DEPFET gain (600 pA/e ?) Manuel Koch, Bonn

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik DHP Configuration Synchronization DCD/Switcher Data processing (CM, Pedestal 0-Sup) Clustering? Buffering, Trigger handling Being designed, 90nm CMOS

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik DHP – Signal Rates & Data Flow Assumptions (  extended specs.) »10µs r/o time (  20 µs) »128 switcher channels (  256) »10 kHz trigger (un-triggered r/o) »2-4% occupancy Bonn, Barcelona

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Summary: ASICs »- DCD prototype chip has been tested with test signals that correspond to DEPFET currents and irradiated up to 7 Mrad. » The chip works fine and has high enough conversion speed. » Operation with matrices still to be tested – we do not expect problems. » Only „fine tuning“ of the design for the super KEKB operation is necessary. »- Switcher prototype with LV transistors has been tested and irradiated up to 22 MRad. » The chip works fine and has adequate speed for Belle II operation. »- Another prototype with HV transistors has been designed and tested. »- The irradiation of the chip still has to be done but the basic and most critical part (high- voltage NMOS) has been irradiated up to 600 KRad and no damage has been observed. »- DHP chip will be designed using digital design tools in intrinsically radiation hard 90 nm technology. »- Choice between 4 different bumping technologies – advantages and disadvantages still to be evaluated »Planned submissions: Switcher:October 09 DCD:September 09 DHP: October 09

SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Questions General: Radiation: SEU tolerance: what level of background from hadrons? Ground loops? DHP Trigger: max. rate and trigger dead time Interleaved readout: not wanted by ASIC designers Distance DHP-DHH How many (complete) frames to store (for calibration) Switcher: Range of different operation voltages (compatible with internal level shifter)