Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.

Slides:



Advertisements
Similar presentations
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Advertisements

Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
November Vertex 2002 Kazu Hanagaki1 Layer 0 in D0 Silicon Tracker for run2b Kazu Hanagaki / Fermilab for D0 run2b Silicon Tracker group Motivation.
Vertex2002, Kailua-Kona, HI 11/07/02 B. Quinn1 Carbon Fiber Grounding Issues in the DØ Run IIb Silicon Detector Design Breese Quinn Marvin Johnson, Mike.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
FVTX Wedge Assembly WBS to David Winter Columbia University FVTX Wedge Manager.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
Analog Cable Status Basic design fixed --- the latest cable has good quality. (report by Frank) Capacitance for single cable ~0.35pF/cm --- both new and.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Hybrid Integrated Circuit
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
Mikhail Kubantsev - Kansas State University 1 Assembly of a Large Area Microstrip Silicon Tracker Some Experience of Construction of D0 SMT H- disk Silicon.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
Grounding Studies Metal box sensor SVX4/hybrid Analog cable GND(20W)
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
L0 Module Testing and Analog Cable What we built so far: –No.3 First prototype with SVX4 (L1 hybrid) –No.4 with irradiated sensor –No.5 Installed on the.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
DOE Rev of Run IIb Sep 24-26, Run IIb Silicon Mechanical Design  Run IIa and IIb geometries  Sensor dimensions, numbers, and drawings  Hybrids,
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Dec
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
QCG Report Francesco Forti University and INFN, Pisa.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Equipment for Assembly – UK Experiences
Design and fabrication of Endcap prototype sensors (petalet)
Module Production in Brussels
Presentation transcript:

Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab

Silicon Meeting July 10, 2003 L1 Module Tooling  Follows closely the L2-5 module tooling design u Assembly fixture the same as fixture design s Center and end vacuum pucks altered for smaller sensor size u Bonding and transfer fixture is the same design s Fixture and vacuum grooves scaled down for smaller module size u Flip fixture s Must accommodate bonding of Kapton circuit over full module surface  Most drawings approved for fabrication u Need to adjust Flip fixture to final hybrid HV/GND pad locations  Production fixtures u “Finalize design” dependent on final hybrid sign-off (12/03) u Production schedule to start 1/28/04 u Probably possible to do production earlier s Mechanical aspects of hybrids should be stable earlier

Silicon Meeting July 10, 2003 L1 Module Fixture

Silicon Meeting July 10, 2003 L1 Electrical Modules  One prototype built (long, long ago) u ELMA sensors u Hybrid aligned by hand and by eye u Kapton HV/GND circuit was not used  To Do List u Verify tooling and procedures with mechanical parts u Assemble single-sensor module for glue irradiation test s Want to use HPK sensor so we have the correct structures & oxides s Will be irradiated at KSU to look for noise or leakage current issues s Final test to certify use of TDR epoxy for use on sensors u Assemble at least 2 electrical modules s Need HPK sensors for these s May need new Kapton flex circuit for HV/GND connection (depends on hybrids) u Develop OGP survey program and database infrastructure s Need above modules with correct fiducials s Need initial output file to write script to massage data for DB s Need to write procedures as programs are developed u Final design and fabrication of Kapton circuits for HV/GND connections

Silicon Meeting July 10, 2003 L0 Module Tooling  Flex cable tools u Attach ceramic to cables A and B u Laminate cables B onto cable A with Kapton mesh spacer in between u Current plan is to do this at Fermilab  Sensor sub-assembly tooling u Attach flex to sensor for HV and ground contacts to HV filter u Install HV filter card and connect flex to HV filter u Provide referencing of sensor so it is located for next step  Sensor/flex/hybrid assembly tool u References cables with pins through holes in ears s Dead weights hold cable down on sensor and hybrid u References hybrid with pins to edges of substrate s Vacuum holds hybrid in place u References sensor from edges s Problematic as Kapton is already in place – no good edges s Needs to be integrated with previous fixture for preparing sensor  Bonding tools u Need tooling to hold sensor and hybrid for bonding s Most likely we will use assembly tooling for bonding also

Silicon Meeting July 10, 2003 L0 Electrical Modules  Only ELMA sensors available for this  Initial modules used SVX2 HDI’s from Run IIa u Used for initial studies of analog cables  Second round of modules used L1 hybrids (4-chip versions) u Study of noise due to capacitance of analog cables with SVX4 u Study effects of cable spacing u Study noise pickup from support structure  Third generation u Two sets of cable+sensor to the same 10-chip hybrid u Direct comparison of in-house lamination to Dyconex lamination u Includes “jog” in analog cables  First “real” prototypes u Made with 2-chip hybrids and V1 SVX 4 chips u Narrowed ELMA sensor used (to fit in L0A location on structure) u Some difficulties with current draw and noise – under study  Second “real” prototypes u Use 2-chip hybrids with V2 SVX4 chips u Two modules being built with non-cut sensors, 2 cable lengths (for L0B)

Silicon Meeting July 10, 2003 Other Issues for Production  Training of additional personnel u Gang assemble – Coincides with shutdown…tech shortages expected u Module assembly (Need second technician to join Jim Wish) u Burn-in (Cecil plus some students to replace Gustavo) u Debugging (hybrids and modules – big void now) u Stave assembly (Done by engineers so far)  Need to emphasize care in handling and cleanliness u Damaged parts cost substantial amounts of manpower debugging and repairing, in addition to lost part $ and value-added costs s Rework of parts will also cause unacceptable slipping in the schedule u Our goal should be <<1% damage in assembly & testing s Requires all involved undergo real training in how to handle Silicon –We cannot expect a priori understanding of the delicacy of Si modules s Requires 110% care – always take the low-risk approach –E.g. using carts to move parts rather than hand carrying them –Always double check (cables on right?, clamps are installed correctly?) s Requires written procedures for everything, followed by everyone –Supervisors and managers need to set a good example s Every part I’ve broken was a result of not following a safe procedure that was developed or not spending time to develop a safe procedure and document it (fortunately most were mechanical parts!)

Silicon Meeting July 10, 2003 Other Issues for Production  Storage space u Need to evaluate space in Lab D for sensors and gangs s Less space available with CMS using ~1/3 of the cabinets there u Dry box cabinet designed and prototype paid for by SiDet s Designed with two “extra” shelves at inconvenient heights –Can accommodate Run IIa remnants and IIb prototype modules s Burn-in area needs 8-10 of these cabinets s Lab D needs 1 (2?) for module storage between assembly and bonding –SiDet prototype can be used there s May need 1 or 2 in Lab C for modules waiting to go into staves s Assembly of box nearly complete now s Need to sign-off on cabinets and get them ordered soon u Larger boxes in Lab C can be used for staves & L0 modules s Need to relocate Run IIa test structures and HDIs –Use “extra” shelves in new boxes s Need to evaluate if existing space is sufficient  Need to design fixture/box for storage and testing of staves u Needs to incorporate active cooling  Need “garages” to go over L0 and L1 structures and barrels during assembly and testing in Lab C

Silicon Meeting July 10, 2003 Summary  The tooling design for modules is flexible so that we can easily increase production rate. All tooling has been prototyped and performs very well.  Stave assembly tooling has been prototyped successfully. Second prototype, thought to be production tool, has been received. Flatness of tools is still an issue and we are discussing this with the MSU shop.  First production tooling has been ordered (20 cm gang fixtures) and parts have started to arrive.  We are in very good shape with the remaining production tooling designs and are waiting only for final hybrid designs, assembly and testing of electrical prototypes to sign-off.  Main bottleneck has been availability of hybrids and sensors for fabrication of prototype modules.  Testing, debugging etc. needs to ramp up.