W. Wuensch CLIC project meeting 8-7-2011 High-power rf structure testing.

Slides:



Advertisements
Similar presentations
IWLC2010Walter Wuensch19 October 2010 Progress on CLIC rf structures.
Advertisements

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Choke-mode Damped X-band Structure for CLIC Main Linac Hao ZHA, Jiaru SHI CERN Sep 27, 2011 Jiaru Shi, LCWS11 Workshop, Granada1.
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
CERN-KEK X-band collaboration 3 Dec T. Higo on behalf of X-band group of KEK.
Structure testing and RF tests stands Jan Kovermann CERN On behalf of the CLIC structure test team.
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo.
X-band Structures Test Results at NLCTA Faya Wang Chris Adolphsen, Christopher Nantista 9-Feb-11.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Working Group 1: Microwave Acceleration Summary 10 July 2009.
CLIC MAIN LINAC DDS DESIGN AND FORTCOMING Vasim Khan & Roger Jones V. Khan LC-ABD 09, Cockcroft Institute /14.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
X-Band and High-Gradient à la Carte
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
30 GHz waveguide line modification towards 12 GHz.
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
日米協力 US/Japan cooperation Research of High Gradient Acceleration Technology for Future Accelerators progress report New proposal 7.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Statistical analysis of RF conditioning and breakdowns Jorge GINER NAVARRO CLIC Workshop /01/2015 J. Giner Navarro - CLIC WS20151.
An Overview of the CLIC Testing Program W. Wuensch CLIC ACE
Overview of the CLIC RF Structure Development Program W. Wuensch Second Collaboration Meeting on X-band Structures KEK,
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
X-Band: test stand and structure program
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
SLAC Accelerator Development Program: X-Band Applications Chris Adolphsen OHEP Accelerator Development Review January 24-26, 2011.
Introduction to the X-band resource estimation exercise W. Wuensch Collaboration meeting 3 November 2011.
常伝導技術での LC の可能性 LC feasibility consideration with normal conducting technology 第5回「機構の研究推進について」の意見交 換会 (ILC の推進について ) 平成 24 年 2 月 13 日 加速器・肥後寿泰.
Overall strategy for the rf structure development program W. Wuensch CLIC ACE
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
Jose Alberto Rodriguez.  Describe how we currently characterize structures at CTF3  Describe how we want to improve the characterization  Learn from.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
CLIC Accelerating Structure R&D Introduction W. Wuensch X-band workshop
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
Overview of NLC X-Band Technology and Applications Including a Compact XFEL Chris Adolphsen SLAC.
Walter WuenschIARC CERN High-gradient accelerating structures for proton acceleration Linear collider development applied to cancer therapy.
TD18 High Power Test Results Faya Wang Chris Adolphsen May 3, 2010.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Title 2 nd X-band Accelerator Structure Design and Test-Program Collaboration Meeting Discussion with WebEx on March 17 between CERN and KEK W. Wuensch,
Two-Beam Test Stand results 5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program SLAC, Stanford, CA, USA Erik Adli, University.
Nextef results & status International Workshop on Breakdown Science and High Gradient Technology KEK, Japan 18 April 2012 Toshi Higo.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Overall strategy for the rf structure development program W. Wuensch CLIC ACE
Review of the rf working group of the ICFA Mini Workshop on Novel Accelerators and Colliders which was associated with the Bob Siemann Memorial Symposium.
Update on PETS experiments (Igor for the CLIC collaboration)
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
2010 TESTING PROGRAM AND RESULTS FOR THE CLIC PETS X-BAND WORKSHOP ON RF STRUCTURES, BEAM DYNAMICS AND SOURCES 2 nd December 2010 Alessandro Cappelletti.
1 Introduction to rf acceleration Accelerating structures Walter Wuensch, CERN MeVArc 4 Chamonix, France 4 November 2013.
Introduction to Summary of the X-band resource estimation exercise
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Testing Infrastructure, Program and Milestones
Task 2: High-gradient normal-conducting technology development
CLIC Klystron based. Updates 2017.
Update of CLIC accelerating structure design
Recent high-gradient testing results from the CLIC XBoxes
CLIC rf structure program
Presentation transcript:

W. Wuensch CLIC project meeting High-power rf structure testing

I’ll cover structure and testing requirements for a program with boundary conditions: covers roughly five years arrive to industrialize-able structures still pursues higher performance

Our X-band menagerie: Main linac accelerating structures Other X-band – crab, bunch compressor PETS rf network ***in low breakdown rate tests***

Finished products

NLCTA at SLAC Nextef at KEK New klystron at CERN Two-beam test stand at CERN ASTA at SLAC Prototype accelerating structure test areas

High Power Operation History Final Run at 230 ns: 94 hrs at 100 MV/m w BDR = 7.6e-5 60 hrs at 85 MV/m w BDR = 2.4e-6 TD18 C. Adolphsen F. Wang SLAC

Processed for 1744 hours. 2011/3/117T24#3 Summary (7) KEK

T24#3 BDR evolution at 252ns normalized 100MV/m 2011/3/118T24#3 Summary (7) Assuming the same exponential slope as that at 400hr We understand the BDR has been kept decreasing. From T. Higo

Results summary

CTF3 linac PETs branch High-gradient test stand, CTF2 High-power transfer line Two-beam 30 GHz power production in CTF3 converted to beam-loading experiment.

Finish up baseline: TD24, compact couplers, SiC loads and manifolds, wakefield monitor 10 Optimize process: Material, machining, surface and heat treatment with low-power (recirculation), MW, so 2 to 4 per testing slot. 40 Baseline evolution: Optimized high-power design, new energy optimum 10 Alternatives: DDS and hybrid derivatives, choke mode, quadrants 10 Basic studies: High-power phenomenon, exotic stuff 5 Medium-series: Statistical and long term 50 Other X-band: Crab cavity and bunch compressor 5 PETS: Consolidate results, statistics – 150 MW input power, so 2 slots per test 5 rf network: Prototype network tests 5 What’s next:

Testing 50 Hz Process optimization, basic studies 1-2 months Prototypes3-6 months Long-term1-2 years

slot years Finish up baseline:10 5 TD24, compact couplers, SiC loads and manifolds, wakefield monitor Optimize process:40 4 Material, machining, surface and heat treatment with low-power (recirculation), MW, so 2 to 4 per testing slot. Baseline evolution:10 5 Optimized high-power design, new energy optimum Alternatives:10 5 DDS and hybrid derivatives, choke mode, quadrants Basic studies:5 0.5 High-power phenomenon, exotic stuff Medium-series:50 40 Statistical (40) and long term (10) Other X-band:5 2.5 Crab cavity and bunch compressor PETS:5 2.5 Consolidate results, statistics – 150 MW input power, so 2 slots per test rf network:5 1.2 Prototype network tests Total65.7 Integrated time

High-power, high rep-rate test areas klystron 1, 50 MW, SLAC operation at 1 slots/stand klystron 2, 50 MW CPIsupply and comissioning operation at 2 slots/klystron klystron 3, 50 MW CPI klystron 4 klystron 5 klystron 6 klystron 7 KEK klystron lifetime estimate SLAC Saclay 2x5 MW Thalesproposal Valencia 5 MW, 9.3 GHz L3proposal Groningen 2x5 MW L3proposal Uppsalaintention UK R&D linacrumours Frascattirumours number of rf ports Total slot years:38 Testing capability scenario