Report from the MCWG, 4 th R2E Committee Meeting M. Calviani for the MCWG (link), EN/STIlink.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
LHC 14 & 15 April :22: Ramp to 6.5 TeV lost due to MUFO, resulting in quench 10:30: Access during cryo recovery 16:00: Pre-cycle 17:05: RB.A78 short.
● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
Injection test? Mike Lamont For initial discussion.
R2E Weekly Report status AT/MB/MC – 4 th R2E Project Meeting – 7 th April 2011.
E. Hatziangeli – LHC Beam Commissioning meeting - 17th March 2009.
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
6 th QTAWG meeting, March 28, Overview 6 tests/events have been analyzed. RegimeMethodCERN namingMagnet typeTemperature shortkick750 µrad kick eventMB1.9.
Bus-Bar Quench Studies Summary of Available Calculations LMC Meeting August 5 th 2009 Bus-Bar Quench Studies Summary of Available Calculations LMC Meeting.
CLIC/CLEX controls Radiation issue August 29 th, 2012 F.Locci - BE/CO-FE.
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
Mariusz Sapinski BI/BL Acknowledgements: 1 Planning of quench tests - LMC158 Draft planning of beam induced quench tests at the end of 2013 run LHC Machine.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
Wednesday ● 02h04: Stable beams # b x 121b. – Peak luminosity 1.2e25 cm-2 s-1 ● 08h32: Beams dumped on request. – Length=6h28. Rampdown.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
Case study: Energy deposition in superconducting magnets in IR7 AMT Workshop A.Ferrari, M.Magistris, M.Santana, V.Vlachoudis CERN Fri 4/3/2005.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.
David MCFARLANE RADMON (RADiation MONitoring) TS-LEA-RAD C. Pignard C. Pignard Hardware design / development / testing Hardware design / development /
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
Ion Run 2015: measurements in cells 11 for P1 and P5 P–Ion Run 2016: analysis of cell 8 for P1, P5, P2 and P8 Corinna Martinella EN-EA R2E-MCWG 04/07/2017.
Planning and strategy for HL-LHC R2E
R2E-MD preliminary report – 3rd/4th July th July LSWG meeting
S. Roesler (on behalf of DGS-RP)
Radiation monitoring and follow up during LHC commissioning
SPS dose forecast for foreseen safety installations
R2E impact of TCL settings: input for 2017 operation
Beam Loss and Radiation Working Group: Conclusions
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
Evolution of SAM in an enhanced model for monitoring the WLCG grid
Transfer line test: Beam stability measurements
B.Todd, M. Zerlauth, I. Romera, A. Castaneda
Dosimeters installation during the EYETS 28/03/17
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
Automatic Generation of the Radiation Level Weekly Reports Update 28
X X X QURA PLC X RM01_R X RM01_L Long-Term?: QURC(A,B) QUI (-1)
Automatic Generation of the Radiation Level Weekly Reports Update 18
IP7 losses scaling and impact on forecast for HL-LHC era
Status and evolution of radiation dose on 60A power converters
Update on expected HL-LHC radiation levels
16L2 aperture measurements
Energy deposition studies in IR7 for HL-LHC
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Tuesday 22nd January - morning
BLM planning 03/03/2014.
Week 35 – Technical Stop and Restart
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
RADIATION induced failures in LHC 28th June 2011
Radiation To Electronics Collimation Areas (IR7/3)
Radiation To Electronics 2x A Brief Look
FLUKA Energy deposition simulations for quench tests
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Thursday 22 September 2011.
Friday 15th February - morning
Monday 27th August & night
Radiation Working Group RADWG
Saturday Morning used to complete the loss maps and asynch dumps (with RPs). All loss maps OK (B. Salvachua), but the off-p cleaning for B1 (Lead) was.
Presentation transcript:

Report from the MCWG, 4 th R2E Committee Meeting M. Calviani for the MCWG (link), EN/STIlink

Update since the last R2E Project Meeting (1/4) 7th April 2011Report from the MCWG - 4th R2E Project Meeting 2  Info from the last 5 th MCWG meeting (24 th March):  BCT monitor discussion for the TI2/8 injection and in the LHC (link)link  No reliable (better than 5% exists for the TI2/8 injection; no info for the beam lost in the injection lines  In the LHC, due to “delay” issues, only the DCBCT are to be considered for reliable beam intensity measurement  P1 application benchmark update for 2010 operation (link)link  PMI in the tunnel (up to cell 4) + PAT in the UJ14/16 shielded areas (agreement between 1x (PMI1411,PAT1411) -5x (PMI1412) )  Assuming symmetry of beam line element for P5 (not completely true), benchmark for TOTEM location (5x (PMI5714) )

Update since the last R2E Project Meeting (2/4) 7th April 2011Report from the MCWG - 4th R2E Project Meeting 3 OK ?? 5x? FLUKA calculated R-factor  TLD measures ~10 Agreement within a factor of 2x (assuming FLUKA-calculated R)

Update since the last R2E Project Meeting (3/4) 7th April 2011Report from the MCWG - 4th R2E Project Meeting 4  Discussion on the weekly report (link)link  Already discussed …  New FESA class for the RadMon and new installations (link)link  A new interface class for the RadMon will be deployed in the following weeks, changing both the use and the “expert” interface  A wrapper will be used to maintain the same names for 2011 as in 2010 (change in the middle of the year is not really easy to digest)  full change from 2012  New FIP RadMon have been installed at Point 8 to monitor tunnel side losses  LHC R2E-dedicated MD (link, document)linkdocument  A request for a dedicated MD have been requested  “orbit bump peaking in C14R2”, 8*10 9 p/bunch, total required intensity ~1-5*10 12 protons 1.Application benchmark + gradient in case of losses! 2.Risk factor evaluation (bigger uncertainty given the spread of memories)  Objective is to perform the test before the next TS (possible?)

MBC MQ MBA MBB LHC beam tests cell 14R2 – present configuration Cell 14Cell 15 corrector FIP RadMon (5V) BatMon (3V) Beam 1 MBC MQ MBA MBB Cell 14Cell 15 corrector Beam 1 LHC beam tests cell 14R2 – proposed configuration BatMon (5V) i.e.: +1 FIP RadMon (5V) +1 BatMon (3V) +2 BatMon (5V) QPS EPC equip. 7th April h requested, 450 GeV/beam requested, 5* *10 10 p/bunch, 1 bunch/beam Report from the MCWG - 4th R2E Project Meeting 5