1 Smart Metering Foundation Stage February 2013. 2 Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.

Slides:



Advertisements
Similar presentations
Third Energy Package for Change of Supplier 2009/73/EC.
Advertisements

12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
1 Modification 422 Creating the permission to release data to Meter Asset Provider organisations A presentation by the Community of Meter Asset Providers.
Senior Stakeholder Forum Wednesday 19 th June 2013.
1 Smart Metering Portfolio DCC Day 1 Project Smart Metering Portfolio Focus Group Project Update Thursday 06 th June 2013.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
Industry Shipperless & Unregistered Working Group Wednesday 1 st February 2012.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Shipperless & Unregistered Workgroup Monday 1 st July 2013.
Project Nexus Workgroup Read Validation following Transfer of Ownership 13 th October
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
PN UNC Workgroup iGT Services 7 th February 2012.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Annie Griffith & Chris Fears September 2007 UK Link Technology Refresh.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
DCA timeline and ROM Overview 12 October Smart Metering Indicative Timeline Evaluation Service (EVS) 2528 received / Rough Order of Magnitude.
User Pays User Committee 12th November 2013
David Addison / Steve Deery
Functional Change through RGMA Review Ph2
UK Link Technology Refresh
Market Trials ChMC 8th August 2018.
Meter Status Table Providing timely opening reads is an obligation to the confirming shippers. However where the confirming shipper fails to meet this.
XRN Construction of a Meter Reading where a Converter and AMR is recorded OR where a Meter with Conversion capability is fitted v2 DWG 28/06/2018.
UK Link Technology Refresh
Smart Metering Consequential Changes
Mod 430 iGT Mod 047 Workgroup Update
Agenda Action Review Update on IX and iGT access Testing strategy
Distribution Workstream UNC Modification 0224 Draft UKLink Implementation Summary Responses 26th February 2009.
Future Release 3.0 – Release 3 Industry Impacts & Recommendation
Change Management Committee – June 2019 Update
Project Nexus Workgroup
LAMAS Working Group June 2017
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Background MDD is currently managed within SPAA
DSC Change Committee Summary – 10th October
UNC Modification 0531 Provision of Industry Testing System
0630R Review Group meeting 21 February 2018 Settlement Data topic
Distribution Workgroup 8 August 2012 Joanna Ferguson
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
Market Participant Identity Process – migration to UNC
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
June 2019 Release Scope DSC Change Management Committee
DSC Change Committee Summary – 13th March ‘19
Release 3 Scope Selection and Plans
Deferral of Retrospective Updates Functionality
Gas Customer Forum Project Nexus xoserve update (as of 19th July 2010) 26th July 2010 Final.
Smart Metering Implementation Programme January 2013
Implementation Approach Distribution Workgroup – June 2014
Meter Read Rejections ..
Meter Reads.
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Project Nexus Workgroup
CSEPs SPA Rejections January – August 2007
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Enabling Large Scale Utilisation of Class 3
UK Link Change Impacts and Release Update
DSC Change Committee Update
REC Data Specification and UK Link File Formats
Presentation transcript:

1 Smart Metering Foundation Stage February 2013

2 Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching New File Type for Smart Switching Implementation Date for Smart Switching

3 Impacted File Formats for Effective Switching Phase of the Foundation Stage of SMIP New Allowable Values (NS, S1 & S2) will be added to the following File Types: –Incoming: METER Dataset (ONJOB / ONUPD), M79, M82. –Outgoing: U06, P18, M80, M81, M83, M84, M85, METER, MFX, MEX, S75, M03. No change to existing Validations at File Type and Record Type Level. No Change to Acceptance or Rejection Responses. The Installing Supplier ID field will not be transferred by file flows, therefore there is no impact to file formats.

4 Impacted File Formats for Effective Switching Phase of the Foundation Stage of SMIP

5 Effective Switching Back Population Approach SPAA Change creating Allowable Values is not implemented until 01/06/2013 Challenges to activity due to the GRP implementation on 8 th /9th June Back Population proposed using ONUPD* Analysis in progress to look at planned approach for volume of ONUPDs Shippers to provide a sample file for testing * Option analysis requested – report back pending

6 New File Type for Smart Switching Phase of the Foundation Stage of SMIP INPUT – –A new reusable File Type and Record will be created to facilitate the transfer of the new SMSO ID and Effective Date data items for the Smart Switching phase. –The SMSO ID and SMSO Effective Date will be mandatory data items within the new record. OUTPUT – –Not planned to have Output files for Foundation. –The SMSO Effective Date will not be played back for Foundation on DES. MDD change proposal to be raised for new Market Participants for SMSO IDs. Values to be agreed with SMSO organisations and Xoserve to ensure values are unique.

7 New File Type for Smart Switching Phase of the Foundation Stage of SMIP The File Level Validations: –The SMSO ID will be a 3 character text field –The SMSO Effective date will be standard date format (8 characters) The Record Level Validations: –The SMSO IDs agreed with SPAA will form the allowable values. If a non allowable value is received the following error code will be generated and sent. Suggested code: Error Code: SMO00001 Error Description: SMSO Does Not Exist Note: There will be no validation to check if there is a corresponding Smart value in the Meter Mechanism Code when an SMSO ID is provided

8 Implementation Date for Smart Switching Issue with AQ review impacting the planned Smart Switching Implementation Date of 01/10/2013 requiring Xoserve to implement outside of this window. –Proposed implementation in early Sept 13 outside of key AQ Review activities to protect the UK Gas Industry –System changes would be in place in advance of Shipper Licence Obligation to submit SMSO values from 01/10/13