Permanent Magnet Impacts to STS/ISS/MOD Chris Tutt 5 May 2010.

Slides:



Advertisements
Similar presentations
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 DELTA CDR Permanent Magnet Avionics Changes Summary May 4, 2010 Timothy J. Urban / ESCG /
Advertisements

Improved anchoring of SSS with vacuum barrier to avoid displacement Ofelia Capatina (speaker), Katy Foraz (coordinates all the activities), Antonio Foreste,
AnDY at IP2 Infrastructure Requirements & Experimental Construction 1Charles Folz, BNL.
Review of Helium Venting Analyses
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Magnet and Magnetic Fields Phase III Flight Safety Review January 12, 2010.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
C2V2 Technical Requirements and Constraints
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
AMS-02 Delta CDR Thermal. Overview Changing from Cryomagnet to PM greatly simplifies AMS-02 Thermal requirements – Keeping vacuum Case “cold as possible”
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Leland D. HillAMS-02 Phase II Flight Safety Review - May AMS-02 Safety Summary.
March 14, 2002GJG NCSX CRYOGENICS DESIGN DEVELOPMENT STATUS WBS-63.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
Leland HillAMS-02 Phase II Safety Review 1 PHASE II FLIGHT SAFETY REVIEW.
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
Leland D. HillAMS-02 Phase III Safety Review1 Safety Summary of Significant Changes Since Phase II.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
STARLight PDR 3 Oct ‘01 F.1.1 Rashid STARLight STARLight Mechanical Tahir Rashid STARLight Mechanical Engineer (734)
May 21-25, 2007Phase II FSR1 ISS Hardware Magnetic Susceptibility Testing and Analysis Trent Martin NASA AMS Project Manager
AMS TIM July, 2008 – CERN 1 AMS 02 –Thermal Control System Design AMS-02 Thermal Control System (TCS)
Overview of AMS-02 Changes due the addition of the Permanent Magnet
Alpha Magnetic Spectrometer. A particle physics experiment module that is to be mounted on the International Space Station. A particle physicsInternational.
MICE CM32 8 th February 2012 Magnet Group Report Vicky Bayliss Victoria Blackmore John Cobb Mike Courthold Roy Preece Mike Zisman 1.
Thermal Storage Coupled to a Ground Source Heat Pump in a Public Services Building COIMBRA Andre Quintino Duarte Oradea, 06 June 2012.
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 Phase III PSRP / SRP Electronics Summary January 12, 2010 Timothy J. Urban / ESCG / Barrios.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
SpaceOps Stockholm Page 1 SpaceOps 2012 Stockholm Col-CC Voice System Migration During On-Going Operations Thomas Mueller, DLR,
AMS-02 Phase 2 Flight Safety Review1 AMS-02 Structural Analysis Overview Carl Lauritzen Jacobs Engineering May 22, 2007.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Idaho RISE System Reliability and Designing to Reduce Failure ENGR Sept 2005.
12/02/99Team #12 Optimized Magnet Support EML 4551 Optimized Magnet Support EML 4551 Senior Design Dr. Luongo 12/02/99 Deliverable #3 Team #12 David Moore.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
Payload Safety Review Plan and Issues Leland D. Hill.
Composite Overwrapped Pressure Vessels
RISK MANAGEMENT IN PROJECT DELIVERY (CONSTRUCTION)
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Ground Safety Status.
Radiological Assessment April 4, AMS Summary Ops Summary – Aerial Measuring Systems have totaled more than 221 flight hours in support of aerial.
ESCG\L. D. Hill AMS-02 Permanent Magnet Safety Impact 1 AMS-02-PM Design Review - May 4-5, 2010.
AMS-02 Delta CDR Structural Analysis and Certification Process Carl Lauritzen Structural Analysis Lead Jacobs Engineering
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Chris TuttAMS-02 Phase II Safety Review1 Tracker Alignment System Chris Tutt AMS-02 Project Manager.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
KSC Ground Operations Timeline. KSC CGSE TIM A Technical Interchange Meeting regarding the Cryo Ground Support Equipment was held at KSC November 1 st.
October, 2009 Cost of SRF Components Gary McIntyre October, 2009 Internal Review.
PHASE II FLIGHT-SAFETY REVIEW AMS-02 EXPERIMENT sub-detector SILICON TRACKER Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25,
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
Mission Integration OZ2/Winston J. Reid/(281) Page No. 1 International Space Station Alpha Magnetic Spectrometer-02 AMS-02 Ops TIM - Ops Assessment.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
AMS-02 Ground Safety (Permanent Magnet) AMS-02 Design TIM May 5, 2010.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
Phil Dempsey ISS Vehicle Office July 15, 2014 Inspection Considerations from the ISS Program NASA In-Space Inspection Workshop 2014.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
MICE Spectrometer Solenoids Step IV running
Magnet cryogenic system update.
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Potential Use of PEP-II Magnets by Project X
Presentation transcript:

Permanent Magnet Impacts to STS/ISS/MOD Chris Tutt 5 May 2010

Introduction AMS Project Office has done an initial review of the impacts of replacement of the cryomagnet by a permanent magnet. Goal of this presentation is to review changes with impacts to STS, to ISS, or to MOD. Other changes exist, which will be documented in the safety packages and the ADPs, but which are transparent to the programs.

Elimination of Cryosystem Removal of the cryomagnet means removal of the cryosystem and all cryogenic fluids. – No nominal venting and significantly fewer potential fault venting locations. – No helium tank and no dewars during ground processing, and one COPV removed. – No requirement to monitor cryosystem health during canister and PCR operations, so LCCs eliminated. – No requirement to open vent valve during ascent. – No sloshing concerns during transfer or ISS ops. – No cryocoolers, so no payload-induced vibrations. – MMOD risk significantly decreased.

Power Requirements Changes Permanent magnet does not require charging, so maximum power draw on ISS drops to 2400W. No requirement to run vent pumps and valves during ground ops, so 48 VDC and 110 VAC requirements eliminated. No requirement to keep cryosystem alive during downtime, so load shed requirements simplify. Payload A and B buses are now completely identical, so contingency EVA to swap power connectors now highly unlikely.

Magnetic Field Strength Changes Permanent magnet field strength approximately 1/6 of cryomagnet. – Dipole moment reduced to approximately 1400 Am 2. – Reduced effect on plasma environment. Magnet always on, so field effects need to be considered during ground operations, launch/ascent, and transfer operations. – Permanent magnet previously assessed for ground operations and shuttle operations for STS-91 with no impacts found.

New Magnetic Field Lines Current operations constraints are based on keep out zones of 300G (EVA) and 10G (EVR). – New 300G field lines do not extend outside the Vacuum Case, so no special EVA controls should be required. – New 10G is approximately where the original 300G line was, so EVR impacts should be minimal. – Field strength at grapple fixtures are 3.89G (FRGF) and 3.28G (PVGF). New field map has been provided to OZ for assessment by MAGIK team.

New 10G Field Map

Structural Changes Permanent magnet is significantly lighter than cryomagnet and associated plumbing systems. Weight savings has been given to structural group as design budget for new magnet support structure and new tracker planes. Final payload weight and CG location should be similar to current design. Updated numbers will be provided to STS and ISS as design matures. Stress and fracture analyses will be updated as required based on new loads.

Outer Mold Line Changes Majority of hardware changes occur inside the Vacuum Case, so AMS-02 outer mold line is generally unaffected. Two primary exceptions: – Tracker plane 1N will replace the zenith radiator, but large clearances exist to 87” envelope, so no impact is anticipated. – ECAL will be lowered by 35mm to allow installation of tracker plane 6, which will violate the PAS Capture Claw Envelope by 19mm. Preliminary assessment by OM7 shows that clearance to claw is acceptable.

Outer Mold Line Changes

Capture Claw Envelope Violation ENVELOPE VIOLATION OF 19mm ACTUAL CLEARENCE TO CLAW 24mm

Constants Many items are not affected by magnet replacement. – Payload checkout on Shuttle and ISS by DDRS systems still required, although time-criticality is reduced. – Transfer thermal timeline remains at 8 hours. – Data transfer rate still averages at 6 Mb/s. – Deployment on MCAS still not acceptable to APO or ISS.

Conclusions Thermal and structural analysis is ongoing and results will be provided as they become available. Project Office will review all previously submitted verifications to determine which ones have to be reopened: – STS MIP and ICD verification updates and new exceptions will be coordinated with MO. – ISS ICD verification updates and new exceptions will be coordinated with OZ. – MOD procedure/requirement updates will be coordinated with ACO. – Flight Safety verifications will be coordinated with the PSRP/SRP. – Ground Safety verifications will be coordinated with the GSRP.