ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.

Slides:



Advertisements
Similar presentations
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Advertisements

Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
3rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland Electricity REM Roundup and next steps David Halldearn – Head of European Electricity Policy,
France-UK-Ireland Region 1 February 2007 Written Consultation – Overview of Responses Shaun Kent – Head of European Electricity Policy, Ofgem.
1 ETSO views on Transparency Urban Keussen Member of ETSO Steering Committee Head of Task Force on Congestion Managament ERGEG Public Hearing 6th July.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG July 2008 Jean-Philippe Paul - John Prime.
Progress with coupling FUI and CWE region
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Update on Coordination of long term auctions in the FUI region FUI IG, London, 13 th September.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
1 Identification of the needs to modify auction rules in the FUI region Congestion management meeting – 11 January 2007.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
European Commission views on intra-day and balancing markets
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Gas Regional Initiative North-West Transmission Transparency Transmission Transparency Project GRI North-West Operators‘ Group Stakeholder Group Meeting.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
Update on IFA Actions Congestion Management Guideline Workshop Thursday 11 th January, CRE Offices, Paris Simon McVeigh, IFA Manager, National Grid Interconnectors.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Cross Border TSO Balancing Procurement - a Generator/Trader Perspective Malcolm Taylor Head of Electricity Trading Association of Electricity Producers.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Compliance with Electricity Regulation 1228/2003 Ms Asta Sihvonen-Punkka Chair of the ERGEG Electricity Focus Group XIV th Florence Forum Florence
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
INTEGRATION PLATFORM FOR FUI REGION November 22th, 2010 Miroslav Hašek Unicorn Systems.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Congestion Management
Public Consultation : main conclusions (1/2)
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
France, UK, Ireland Regional Initiative SONI Commercial Manager
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Moyle & East West Access Rules Approval
Long-Term Auctions & Capacity FUI Coordination Proposals
ETSO Comments on the draft Congestion Management Guidelines
Regulators’ update on Congestion Management and Balancing
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Transparency Project GRI NW Region.
EURELECTRIC transparency requirements
Draft guidelines ‘Congestion Management’ EURELECTRIC’s position
Draft guidelines ‘Congestion Management’ EURELECTRIC’s position
Interconnector trading in SEM 7th June 2007
Presentation transcript:

ERGEG – Stakeholder Meeting Tuesday 14 th November 2006

Article 1: General Provisions 1.9 Intraday allocation mechanisms to be established by 1 Jan 2008 Current NI market and SEM design is day ahead No provision for Intraday allocations TSO can utilise spare capacity for SO-SO trading within day Significant changes would be required to market rules and systems Not considered likely in the short term

Article 2: Congestion Management Methods 2.5 Long term (annual, periodic etc) cross border capacity rights must be subject to UIoLI/UIoSI following nomination Current NI market and SEM design is day ahead No provision for Secondary gate closure TSO can utilise spare capacity for SO-SO trading within day Significant changes would be required to market rules and systems Not considered likely in the short term

2.9 No reserve prices allowed in capacity allocation methods – long term and day ahead auctions. Reserve price contributes to TUoS charges paid by the NI customer Reserve set and agreed by NIAER Annual/Monthly auctions at present No Day ahead auctions in SEM due to market design If reserve price removed may mean increased TUoS charges for NI customer Significant changes required to market rules and systems for day ahead auctions

2.13 TSOs must provide ‘compensation’ for non- availability of firm capacity rights Participants rebated capacity charges for the duration of the unplanned outage where greater than 24 hours

Article 3: Co-ordination 3.1&3.2 TSOs must adopt coordinated congestion management methods within the region by 1 st January 2007 SONI has worked closely with participants to achieve a coordinated approach Moyle/N-S Capacity auctions and gate closures aligned to facilitate market participants Possible to consider coordination of gate closure and auction timetables between N-S, Moyle and IFA interconnectors

3.5 Key points for cross border coordination: - Identical/compatable capacity timeframes and IC gate closure times -Consistent/Compatable contractual framework for access SONI has worked closely with participants to align gate closure and auction timescales N-S gate closure is at 09:30 D-1 with allocations being issued by D-1 Moyle gate closure is 11:00 D-1 by which stage participants will have received their allocations on the N- S interconnector Auction allows participants to buy N-S capacity the day before Moyle capacity Currently no coordination with IFA in respect of both capacity allocations and gate closure

Article 4: Timetable for Market Operations 4.3 Intraday allocations mechanisms must be employed for unused capacity following determination of day ahead schedules Design of NI market and SEM is a day ahead market and there is no provision for intraday allocation mechanisms SONI as TSO can utilise spare capacity for SO- SO trading to maintain security of supply Significant changes would be required to market rules and systems. Not likely to be considered in the short term

Article 5: Transparency Congestion Management Methodologies for calculation of available interconnection capacity Moyle is a HV/DC interconnector with a static NTC therefore is not applicable 5.5 Capacity use information: Actual net physical flows This information can be collated from the BM reports website – no aggregated metering files published This information will be available with the introduction of the SEM in Nov 2007

Article 6: Use of Congestion Income 6.1 Congestion management procedures can only generate revenues for TSOs and ICOs when congestion exists. Applies per capacity timeframe. Revenues contribute to TUoS charges paid by the NI customer No revenues generated for TSOs and ICOs