Robert Pak, FVTX Annual Review, Nov 2009 1 WBS 1.8.1 Mechanical Integration Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.

Slides:



Advertisements
Similar presentations
April 7, 2010D.R. Lynch 1 PHENIX Shutdown 2010 April 7,2010 Don Lynch.
Advertisements

3 Oct Cost and Schedule Update Craig Ogilvie, Iowa State University Analysis of system risks Update schedule  Critical path.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
1 2/11/2010 PHENIX WEEKLY PLANNING 2/11/2010 Don Lynch.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Walter Sondheim, FVTX Review Nov 12 th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
Robert Pak 1 DOE VTX Review June 2, 2009 Mechanical Integration & Safety Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
Robert Pak DOE Review Jan. 19, Robert Pak 1 DOE Review Jan. 19, 2005 VTX HBD PHENIX Central Region From VTX Proposal (dims in mm) Integrate Detector.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
Walter Sondheim 6/2/20091 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL Mechanical Project Engineer.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
Columbia University IN THE CITY OF NEW YORK FVTX Electronics Oversight and Integration Eric J. Mannel Columbia University.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
Preparations for Run 6 Don Lynch February 13, 2006.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/31/2009 Don Lynch.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
1 1/28/2010 PHENIX WEEKLY PLANNING 1/28/2010 Don Lynch.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
HFT-Beam Pipe D. Beavis BNL March 14, Overview Update on new Beam pipe –Assembly drawing –Material changes –Length changes Outlook 2 HFT F2F at.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
PHENIX WEEKLY PLANNING 2/16/06 Don Lynch. Prep for Run 6 Completed.
1 2/4/2010 PHENIX WEEKLY PLANNING 2/4/2010 Don Lynch.
as a prototype for Super c-tau factory
Presentation transcript:

Robert Pak, FVTX Annual Review, Nov WBS Mechanical Integration Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief Engineer Robert Pak: Integration Manager

Robert Pak, FVTX Annual Review, Nov Outline Mechanical Integration: VTX/FVTX assembly plan under development Beam pipe procurement in progress Detector support started in FY09 Power & water in IR progress off project External cooling system to start in FY10 Infrastructure for dry N 2 system completed Safety: 1 st ESRC meeting for VTX/FVTX held on June 11 th

Robert Pak, FVTX Annual Review, Nov VTX assembly procedure overview 3 Main assembly VTX L3/L4 assemblyVTX L1/L2 assembly FTVX to be added

Robert Pak, FVTX Annual Review, Nov Be beam pipe final CAP from Brush Wellman Smaller dia Be section

Robert Pak, FVTX Annual Review, Nov Additional stainless transitions and spools CAD has taken responsibility for SS sections

Robert Pak, FVTX Annual Review, Nov Be beam pipe Schedule VTX, FVTX, PHENIX Management & CAD signed-off Current ETA from Brush Wellman: 6 mos. to gun-drill Be tube (by mid-Nov. 2009) Final assembly and QA (by end of Dec. 2009) Deliver to BNL and reship to Europe for NEG coating CERN to handle Be section SAES Getters does all the rest Install prior to RHIC Run-11 (summer 2010)

Robert Pak, FVTX Annual Review, Nov External support installed Electrically isolated from central magnet pole tips Measurement of magnet vibrations proved negligible

Robert Pak, FVTX Annual Review, Nov Single support structure attached at 3 points to west detector sled 6 degrees of adjustment East mirror images west BNL concept for support truss

Robert Pak, FVTX Annual Review, Nov DOF (Y & Z) 1 DOF (Z) 0 DOF Kinematic mounts for mating east and west detector halves 6 interface points w/ HYTEC

Robert Pak, FVTX Annual Review, Nov Space frame installed into support truss

Robert Pak, FVTX Annual Review, Nov Final Space Frame Drawings Fabrication underway at LBNL Composites Shop

Robert Pak, FVTX Annual Review, Nov Isolation Mounts Isolation mounts penetrate gas enclosure to support space frame Fabrication complete, only anodizing and QA remain upper lower

Robert Pak, FVTX Annual Review, Nov Central arm acceptance aperture in the Gas Enclosure HYTEC finalizing details Add frame for low mass window to be installed by BNL

Robert Pak, FVTX Annual Review, Nov Gas Enclosure Drawings

Robert Pak, FVTX Annual Review, Nov Mounts for theodolites to be installed Provide stable location above beamline to shoot targets for CAD survey Survey plan in PHENIX IR

Robert Pak, FVTX Annual Review, Nov Platform water manifolds and cable trays Platform Utilities Platform water supply & return flexible connections Photos from D. Lynch Platform electrical distribution and disconnect Off project

Robert Pak, FVTX Annual Review, Nov Electronics rack lay-out New Platform HBD/RXNP (not shown) MuTrgrFEE N MuTrgrFEE S VTX Power FVTX RPCS1 RPCN1 New Platform RPCNS VTX FEM CAD courtesy of D. Lynch Cooling system location under discussion

Robert Pak, FVTX Annual Review, Nov External Cooling System Closed single-phase system operating in the turbulent regime Design work starts FY10 (after RHIC shutdown is over) Coolant candidates (3M products): Novec 7000 C 3 F 7 OCH 3 and Novec 7200 C 4 F 9 OC 2 H 5 Boiling point:34 o C76 o C Vapor pressure:64.6x x10 3 Density (kg/m 3 ) Specific Heat (J/kg-C) Issue of breakdown under irradiation raised at DOE Review

Robert Pak, FVTX Annual Review, Nov Coolant Irradiation Study F - Ion Extraction Test Report 10/21/2008 Dele Fayemi 3M Electronics Markets Materials Division Tel: (651) Summary Samples of 3M Novec 7000 and 7200 subjected to neutron irradiation received from Los Alamos National Laboratory were tested to determine if degradation had occurred. Decomposition was quantified through fluoride ion measurements as described in the 3M test method: “ Fluoride ion extraction – indication of thermal decomposition ”. The irradiated fluid samples showed slightly elevated, but insignificant fluoride ion levels when compared to control samples. Test Results The results of the test are given in table 1. Table 1 Interpretation The in-beam samples recorded average free fluoride ion concentration of ~0.03 ppm. Though these are elevated fluoride ion levels compared to the virgin samples, these concentrations are much less than 1 ppm and indicate insignificant degradation beam 6.7x10 11 N eq /cm 2 integrated dose from LANSCE Issue resolved

Robert Pak, FVTX Annual Review, Nov Bleed the boil-off 5200 gal. capacity LN 2 Storage Dewar for Dry Nitrogren System shared by BBC/VTX/FVTX Dry N 2 System Off project

Robert Pak, FVTX Annual Review, Nov Safety 1 st Experimental Safety Review Committee meeting for VTX/FVTX held on June 11 th Included mechanical and electrical aspects Participation from PHENIX and CAD safety experts Talks from Eric, Walt & RP w/ backup from techs In preparation, separate paperwork completed for VTX & FVTX Design Review Questionnaire (14 page document) CAD Hazard Identification Tool on the internet ESRC report from CAD forthcoming Operational readiness review to occur prior to final installation in PHENIX IR

Robert Pak, FVTX Annual Review, Nov Summary Mechanical Integration: VTX/FVTX assembly plan under development Beam pipe to be installed summer 2010 Detector support started in FY09 Power & water in IR progress off project External cooling system to start in FY10 Infrastructure for dry N 2 system completed Safety: 1 st ESRC meeting for VTX/FVTX held on June 11 th