1 07-Oct-2012 «BE-RF-PM» Experiments on the Material Samples of the CLIC Two-Beam Module Supporting System: PHASE 2 Nick Gazis 1.

Slides:



Advertisements
Similar presentations
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Advertisements

SAMARIS Creep test Meeting at TRL 2-3 March 2005.
MATERIAL R&D FOR HIGH-INTENSITY PROTON BEAM TARGETS PROGRESS REPORT Nicholas Simos, BNL January 4, 2005.
Phase II Total Fatigue Life (Crack Initiation + Crack Propagation) SAE FD&E Current Effort 30 October 2012 at Peoria, IL.
High Temperature Composites Rutgers University Federal Aviation Administration Advanced Materials Flammability Atlantic City, NJ October 24, 2001.
1 [12-Feb-2014] «BE-RF-PM» CLIC TBM Prototype Status update EDMS №[Number] Dmitry Gudkov 1.
Next Planet Confidential DARPA – MAX program Phase Two Progress Report May 19, 2000.
MTR Project ACCENT T.O. van Staveren, NRG A.J. de Koning, NRG M. Davies, Frazer Nash Consultancy September 18, 2013.
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
University of Minho School of Engineering ISISE, Civil Engineering Department Uma Escola a Reinventar o Futuro – Semana da Escola de Engenharia – 24 a.
Practical Considerations In Determining Material Properties
© 2011 Autodesk Freely licensed for use by educational institutions. Reuse and changes require a note indicating that content has been modified from the.
Jerid Sutton Daniel Smith.  To prove an already employed analysis tool, improve it, or create new analysis tools for joints and fasteners. In doing this.
Influence of neutron irradiation parameters on swelling and mechanical properties of stainless steels - materials of BN-350 fuel assembly ducts O.P.Maksimkin,
Vacuum, Surfaces & Coatings Group Technology Department Glassy Carbon Tests at HiRadMat 14 March 2014 C. Garion2 Outline: Introduction Context: Transparent.
Lehký, Keršner, Novák – Determination of concrete statistics using fracture test and inv. analysis based on FraMePID-3PB DETERMINATION OF STATISTICAL MATERIAL.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Takeyasu Ito University of Tennessee EDM Collaboration meeting December, 2004 Cost and Schedule Estimate WBS 2.5- Neutron beam polarizer/splitter for SNS.
Chapter 10: Altstädt, V.: Testing of Composite Materials. In: Grellmann, W., Seidler, S. (Eds.): Polymer Testing. Carl Hanser Verlag, Munich (2013) 2.
Civil and Environmental Engineering Departments
Dmitry Gudkov BE/RF/PM CLIC Module Working Group PROTOTYPE TWO-BEAM MODULES (CLEX) Supporting and positioning system for CLEX modules main conclusions.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
1 04-December-2013 BE-RF-PM CLIC MODULE Procedure for the thermal and alignment testing of CLIC duty cycles Written by: Elena Daskalaki Checked by: Alexander.
BNL E951 BEAM WINDOW EXPERIENCE Nicholas Simos, PhD, PE Neutrino Working Group Brookhaven National Laboratory.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Trnsport Test Suite Status Presented to the AASHTOWare Trnsport IT TAG October 12, 2004.
Page 1 Active MEMS for Wireless and Optical Space Communications Principal Investigators: Frank Merat, Stephen Phillips Task Number: NAG Case Western.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
Applications of Demokritos TANDEM Accelerator in Fusion Technology Research TANDEM Lab I.N.P.P M. Andrianis S. Harisopoulos A. Lagoyianis G. Provatas National.
Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010.
SunSatFriThursWedTuesMon January
Investigation of CVD Diamonds as Sensor Material for BeamCal Alexandr Ignatenko FCAL Collaboration Meeting, Orsay October 6-7, 2007.
IEA IMPLEMENTING AGREEMENT ON NUCLEAR TECHNOLOGY OF FUSION REACTORS International Workshop on Subtask Neutronics Report on ENEA activity in 2004 Paola.
Testing Methods for Composites
TBTS Test Program & Schedule G. Riddone
Microchannel cooling Alessandro Mapelli CERN PH-DT EPFL-LMIS4 Reporting on behalf of D. Bouit, J. Daguin, L. Kottelat, J. Noel, P. Petagna – CERN PH-DT.
1 SPIRE Project coordinated by CEA – Contractors : CEA, CIEMAT, CNRS, NRG, ENEA, PSI, KTH, SCK/CEN, FZK « IRRADIATION EFFECTS IN MARTENSITIC STEELS UNDER.
Procurement for the Supporting Systems
June , RD50 Workshop1 Jan B o hm, Jan Brož, Zdeněk Doležal, Peter Kodyš, Petr Kubík, Marcela Mikeštíková Neutron irradiation program in Prague Charles.
MOLIT Ministry of Land, Infrastructure and Transport KATRI Korea Automobile Testing & Research Institute The CPA test proposed by KOREA 24. Feb Transmitted.
Drying Shrinkage Presentation By Savita Goel May 17, 2002.
Investigation of 15kh2NMFAA steel and weld after irradiation in the “Korpus” facility on the RBT-6 reactor D. Kozlov, V. Golovanov, V. Raetsky, G. Shevlyakov,
Progress Report from Material Radiation Testing at NCSR Demokritos 28 February 20111Nick Gazis, CERN-BE/RF & NTU-Athens Input from: G. Riddone, A. Samoshkin,
Lecture # 5 Mechanical Properties Intended learning Outcomes: After the end of this lecture the student should be able to: Define stress –strain relation.
Date of download: 5/28/2016 Copyright © ASME. All rights reserved. From: Hopkinson Bar Loaded Fracture Experimental Technique: A Critical Review of Dynamic.
TENSILE TESTING GROUP MEMBERS:  ABDUL QAIYUM BIN ABDULLAH  MAISARAH BINTI ROSLI  NURUL ATIQAH BINTI SALLEH  MOHAMAD HAFIZ BIN MAT SHAH  MOHAMAD YUSHAFIZIE.
CLIC activity of S. Iija Feb 20121S. Iija, BE-RF-PM EDMS MTF Administrative work.
19-Sept-2012] «BE-RF-PM» TEST MODULES in the LAB DB girders (epucret) for T1 & T4: Optimization of the V-shaped supports Nick Gazis, Dmitry Gudkov, Vadim.
Epument Girder simulation and Module Showroom upgrade For CLIC meeting 2015 Petri Tikka, Helsinki Institute of Physics focusing on exploring the possibilities.
Christos Lamboudis HEP April. Athens Study of MDT response to neutrons and possible ageing effects Do we really need to worry about neutrons? Do.
RaDIATe/BLIP Status of irradiation campaign of Ir, TZM, Si and Graphite-SiC coated samples Claudio Torregrosa, Elvis Fornasiere, David Horvath, Antonio.
Dr. Younis M. ALSHKANE and Dr. Serwan Kh. RAFIQ
Cryogenic Plant Controls – Cost and Schedule
Jim Fast Pacific Northwest National Laboratory
Update on the DB Girders FE Analyses
PIE program of STIP-V tungsten specimens for ESS target engineering
Mechanical Properties
From: Finite Element Analysis Predicts Large Optic Nerve Head Strains During Horizontal Eye Movements Invest. Ophthalmol. Vis. Sci ;57(6):
Scientific investigations performed at RRC KI for
Mechanical Properties of Metals
2th EuCard Col/Mat WP Meeting
HCS 405 RANK Education for Service-- hcs405rank.com.
Milan Brumovsky, Milos Kytka, Milan Marek, Petr Novosad
API STANDARD 1104 Welding of Pipelines and Related Facilities
Beam-time, June 2009 Beam-time, Oct days of beam time
S112 Science: concepts and practice Assessment strategy
Beam-time, June 2009 Beam-time, Oct days of beam time
PANDA Forward Spectrometer Calorimeter (Shashlyk) status and plans
Presentation transcript:

1 07-Oct-2012 «BE-RF-PM» Experiments on the Material Samples of the CLIC Two-Beam Module Supporting System: PHASE 2 Nick Gazis 1

2 07-Oct-2012 CLIC Module Working Group «BE-RF-PM» Contents 1.Experimental Outline 2.Material Testing (Phase 1) 3.Material Testing (Phase 2) 4.Actions & Schedule 2

3 07-Oct-2012 CLIC Module Working Group «BE-RF-PM» 3 Experimental Outline Phase 1: 5-13 February June 2011 Phase 1: 5-13 February June 2011 Study outcome: Results Analyzed Phase 2:  1-12 October 2012  (March – June 2013) Phase 2:  1-12 October 2012  (March – June 2013) Study outcome: The results are expected to be: (1)simulated, (2)processed and (3)compared CLIATLSS0076, CLIATLSS0077, CLIATLSS0078, CLIATLSS0079 Phase 3 (2013-…) Non-destructive testing Study outcome: To be discussed Achieved Experiments NameType Pilot radio-activationRadiation Testing 3-Point BendingMechanical Testing Uniaxial Compression TestingMechanical Testing Indicative samples Achieved Experiments NameType Large Sample Neutron Activation Analysis Radiation Testing Radiation FatigueRadiation Testing 3-Point BendingMechanical Testing Tensile TestingMechanical Testing

4 07-Oct-2012 CLIC Module Working Group «BE-RF-PM» 4 EDMS References & EDMS References &

5 07-Oct-2012 CLIC Module Working Group «BE-RF-PM» 5 Material Testing for Phase 1 Phase 1: 5-13 February June 2011 Phase 1: 5-13 February June 2011 Study outcome: Results Analyzed Achieved Experiments NameType Pilot radio-activationRadiation Testing Three Point BendingMechanical Testing Uniaxial Compression TestingMechanical Testing Indicative samples Girder material samples radiation testing at NCSR Demokritos (GR) on February 2011 I.k Girder material samples mechanical testing at NTUA (GR) on June 2011

6 07-Oct-2012 CLIC Module Working Group «BE-RF-PM» 6

7 7 Material Testing for Phase 2 Mechanical Testing Tensile Testing SiC samples: i.4 samples of CLIATLSS0076 ii.4 samples of CLIATLSS0077 EPUMENT SAMPLES: i.4 samples of CLIATLSS0078 ii.4 samples of CLIATLSS0079 NO RADIATION (reference specimens) Three Point Bending Tensile Testing SiC samples: i.4 samples of CLIATLSS0076 ii.4 samples of CLIATLSS0077 EPUMENT SAMPLES: i.4 samples of CLIATLSS0078 ii.4 samples of CLIATLSS0079 NEUTRON RADIATION Three Point Bending Tensile Testing SiC samples: i.4 samples of CLIATLSS0076 ii.4 samples of CLIATLSS0077 EPUMENT SAMPLES: i.4 samples of CLIATLSS0078 ii.4 samples of CLIATLSS0079 PROTON RADIATION Three Point Bending Radiation TestingSamples Group A Group B Group C *Optionally: Mechanical Impact testing on one (1) spare sample of each type

8 07-Oct-2012 CLIC Module Working Group «BE-RF-PM» 8 Types of Specimen Specimen SB (=SiC Bars) Height=90 mm, Thickness=6 mm CLIATLSS0077 Specimen SD (=SiC Dog-bones) Height=70 mm, Thickness=6 mm CLIATLSS0076 Specimen ED1 (=Epument Disks batch 1) D=100 mm, Thickness=30 mm Specimen ED1 (=Epument Disks batch 1) D=100 mm, Thickness=30 mm CLIATLSS0078 Specimen ED2 (=Epument Disks batch 2) D=200 mm, Thickness=60 mm Specimen ED2 (=Epument Disks batch 2) D=200 mm, Thickness=60 mm CLIATLSS0079 Dedicated specimen design for tensile strength testing

9 07-Oct-2012 CLIC Module Working Group «BE-RF-PM» 9 Reference samples and simulations Acoustic sensors Strain gages Neutron Activation simulation: in progress Size Effect: Under investigation Size Effect: Under investigation Cracking Patterns: under investigation Cracking Patterns: under investigation *Data input from Sophie Mallows

10 07-Oct-2012 CLIC Module Working Group «BE-RF-PM» 10 Actions & Schedule 1.Design, procurement and delivery of samples for Phase 1 : Finished 2.Irradiation testing (neutron radio-activation) for Phase 1 (at NCSR Demokritos): Finished 3.Mechanical testing (UCT 1 and 3PB 2 ) for the Phase 1 (at NTUA): Finished 4.Design, procurement and delivery of samples for Phase 2: Finished 5.Neutron activation simulation (with Fispact 3 ) for Phase 2 (at NCSR Demokritos): preliminary results available on cw48 6.Mechanical testing (BDT 4 ) for the reference samples of Phase 2 (at NTUA): preliminary results available on cw49 7.Irradiation testing for the Phase 2: March-April 2013 (to be confirmed) 8.Mechanical testing for the irradiated samples of Phase 2: May-June 2013 (to be confirmed) 1.Design, procurement and delivery of samples for Phase 1 : Finished 2.Irradiation testing (neutron radio-activation) for Phase 1 (at NCSR Demokritos): Finished 3.Mechanical testing (UCT 1 and 3PB 2 ) for the Phase 1 (at NTUA): Finished 4.Design, procurement and delivery of samples for Phase 2: Finished 5.Neutron activation simulation (with Fispact 3 ) for Phase 2 (at NCSR Demokritos): preliminary results available on cw48 6.Mechanical testing (BDT 4 ) for the reference samples of Phase 2 (at NTUA): preliminary results available on cw49 7.Irradiation testing for the Phase 2: March-April 2013 (to be confirmed) 8.Mechanical testing for the irradiated samples of Phase 2: May-June 2013 (to be confirmed) UCT 1 : Uniaxial Tensile Testing 3PB 2 : Three Point Bending FISPACT 3 : dedicated software for activation simulations BDT 4 : Brazilian Disc Testing UCT 1 : Uniaxial Tensile Testing 3PB 2 : Three Point Bending FISPACT 3 : dedicated software for activation simulations BDT 4 : Brazilian Disc Testing