CHPS: Status Update Jon Roe, Chief OHD/HL/HSEB Chris Dietz, OHD/HL/HSEB Semi-Annual HIC Meeting 30 January 2007.

Slides:



Advertisements
Similar presentations
September 2008Mike Woodard Rational Unified Process Key Concepts Mike Woodard.
Advertisements

GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
© 2009 The MITRE Corporation. All rights Reserved. Evolutionary Strategies for the Development of a SOA-Enabled USMC Enterprise Mohamed Hussein, Ph.D.
Integrated Ocean Observing System (IOOS) Data Management and Communication (DMAC) Standards Process Julie Bosch NOAA National Coastal Data Development.
External Examiners Preview Demonstrations Academic Services & Student Systems Presented by Daniel Chandler, Project Officer, Academic Services & Matthew.
Alternate Software Development Methodologies
Systems Engineering in a System of Systems Context
Ronla Henry NWS/OST/PPD
CAVIAR – Continuum Absorption by Visible and Infrared Radiation and its Atmospheric Relevance How on schedule are we? Keith Shine Department of Meteorology,
CHPS Implementation Status Chris Dietz, Jon Roe OHD HL HSEB.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
IS&T Project Management: Project Management 101 June, 2006.
IS&T Project Management: How to Engage the Customer September 27, 2005.
NOAA National Weather Service Water Predictions for Life Decisions DOH/RDM Science Workshop 1 Community Hydrologic Prediction System CHPS George Smith.
May Agenda  PeopleSoft History at Emory  Program Governance  Why Upgrade Now?  Program Guiding Principles  High-Level Roadmap  What Does This.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
1 CHPS National Weather Service/ABRFC Implementation of Community Hydrologic Prediction System (CHPS)
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
1 National Weather Service The Evolution of AWIPS NSTEP April 4, 2007 Ronla Henry.
1 National Weather Service Ronla Henry Office of Science and Technology AWIPS Technology Infusion NWS Partner’s Meeting 17 June 2008.
Colorado Basin River Forecast Center Stakeholder Forum NOAA’s National Weather Service Welcome to the Colorado Basin RFC Logistics & Introductions Office.
Kim J. Runk June 4, 2014 Satellite Proving Ground User Readiness Meeting.
US DOT Planning for Operations Initiative – An Update AASHTO SCOH Annual Meeting June 14-17, 2009 Manchester, NH Rick Backlund – FHWA Office of Operations.
U.S. Department of Agriculture eGovernment Program Design Approach for usda.gov April 2003.
CHPS Status and Plans Jon Roe, Chris Dietz, Joe Gofus OHD/HL/HSEB Semi-Annual RFC HIC Meeting 29 July 2008.
U.S. Department of Agriculture eGovernment Program January 22, 2003 eGovernment Working Group Meeting Chris Niedermayer, USDA eGovernment Executive.
1 Node NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
National Weather Service The Community Hydrologic Prediction System: a Services Oriented Architecture - OHD Experiences Pedro Restrepo Jon Roe Office of.
CHPS: Status Update Jon Roe, Chief OHD/HL/HSEB Chris Dietz, OHD/HL/HSEB Semi-Annual HIC Meeting 24 July 2007.
ACE Development and Trade Engagement Michael Denning, CBP Rick Davenport, eCP June 30, 2004.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
FLDWAV to HEC-RAS Transition Software Development (HEC-RAS into CHPS) Science and Modeling –Develop and evaluate model transition procedures –Build HEC-RAS.
CHPS-AWIPS II Integration Jon Roe, Chris Dietz, Joe Gofus OHD/HL/HSEB Semi-Annual RFC HIC Meeting 29 July 2008.
AWIPS II Update Unidata Policy Committee Meeting J.C. Duh Chief, Program & Plans Division, Office of Science & Technology, NWS April 15, 2010.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
NMI End-to-End Diagnostic Advisory Group BoF Fall 2003 Internet2 Member Meeting.
RFC Verification Workshop Happy Ending?! Julie Demargne, Mary Mullusky and Kevin Werner RFC Verification Workshop, August
1 National Flood Workshop Dr. Thomas Graziano Chief Hydrologic Services Division National Weather Service National Oceanic and Atmospheric Administration.
1 Hydrology Program Execution Accountability and Planning HIC Meeting January 25, 2006 NWSTC Kansas City, MO.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
OHD’s Hydraulics Group & Future of Hydraulic Modeling.
Process Asad Ur Rehman Chief Technology Officer Feditec Enterprise.
AHPS Update HIC Meeting July 11, AHPS Update NRC AHPS Report NRC AHPS Report FY07 Planning FY07 Planning Program Execution and Tracking Program.
ESSRT Status Report as of July 31, 2013
1 CHPS Support Strategy HIC Meeting February 24, 2010 Mark Glaudemans, Chris Dietz, Jon Roe, Don Cline, Tom Graziano.
1 National Weather Service VTEC Status & Plan for Action National Partners Workshop January 15, 2004 Dr. Jason Tuell Office of Science and Technology.
Community Engagement to Advance Mitigation Action.
Community Hydrologic Prediction System (CHPS) Focus: Provide NWS RFCs with improved access to new science developed within the hydrologic community  replace.
March 2004 At A Glance The AutoFDS provides a web- based interface to acquire, generate, and distribute products, using the GMSEC Reference Architecture.
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
AWIPS Governance What are we Governing? –EDEX/CAVE plugins developed for an operational AWIPS system Out of Scope: GFE Smart inits and tools, µengine.
CHPS Status and Activities Jon Roe OHD/HL/HSEB Chief Semi-Annual RFC HIC Meeting 8 July 2009.
1 3:00 PM, EST. 2 Don Hewitt Vice President, Business Operations OSEHRA Ramina Toy Program Manager Brad Triebwasser.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Lecture 3 Prescriptive Process Models
Key Information Summary (KIS)
IS&T Project Reviews September 9, 2004.
Software engineering -1
Transitioning into Prime Pilot Phase & Implementation Phase
Presentation transcript:

CHPS: Status Update Jon Roe, Chief OHD/HL/HSEB Chris Dietz, OHD/HL/HSEB Semi-Annual HIC Meeting 30 January 2007

CHPS Status Update2 Agenda  Last HIC Conference: Approach for upcoming projects  Progress summary since July 2006  Status updates: ResSim CHPS Realization Plan CHPS FEWS Pilot HydroXC Model Expansion  AWIPS II coordination  OHD science prototypes  Next steps

30 January 2007CHPS Status Update3 Last HIC Conference: Approach For Upcoming Projects  Use ResSim opportunity to build-in CHPS ResSim project  Lay out roadmap of projects with CHPS built-in CHPS Realization Plan  Determine if Delft-FEWS can host NWSRFS Delft-FEWS pilot  Continue Hydrology XML Consortium HydroXC phase 3  Acquire new COTS models for NWSRFS Model expansion

30 January 2007CHPS Status Update4 Progress Summary since July 2006  ResSim (Apex, Delft) Phase 1 Conceptual Design complete  CHPS Realization Plan (Apex) Complete  Delft-FEWS Pilot (RTi, Delft) Phase 1 Concepts and Plan complete Phase 2 implementation begun  HydroXC (Apex) Phase 3 begun  Model Expansion SOBEK model acquired for HSMB evaluation  Other Arrival of new on-site SOA expert (Sudha Rangan, RSIS) Began discussions with Raytheon on AWIPS II vis-à-vis CHPS

30 January 2007CHPS Status Update5 ResSim: Status Update Project Description Enhance and put USACE’s HEC Reservoir Simulation (ResSim) model into operational use; also connect to NWSRFS Integrate ResSim model into CNRFC operations without directly integrating software within NWSRFS code Make all ResSim upgrades easily and quickly available to CNRFC Three year joint HEC-OHD effort 2006 – 2009 HEC to provide enhancements to ResSim in two phases (deterministic and probabilistic) OHD to provide SOA-based “portal” between NWSRFS and ResSim  Solution must work in current CNRFC operational environment (AWIPS)  Solution should be CHPS-ready for future operational environment (SOA; use Delft-FEWS) Funded by Yuba County Water Agency NWS Task Manager: Rob Hartman, CNRFC

30 January 2007CHPS Status Update6 ResSim: Status Update (cont’d) HEC Progress  Phase 1 – Enhancements to ResSim basic deterministic functionality Work Order 1, Task 1: Develop design for enhancements  Completed 1 November Work Order 2, Tasks 2-12: Implement features designed in Work Order 1  HEC just beginning Work Order 2  Phase 2 – Enhancements to support ensembles Work Order 3, Task 13: Design ensemble features Work Order 4, Tasks 14-17: Implement features designed in Work Order 3

30 January 2007CHPS Status Update7 OHD Progress  Contract with Apex & Delft Begun 1 June Phase 1: Develop conceptual design Phase 2: Implement  Phase 1 “Discovery Engagement” with HEC, CNRFC in August Apex-Delft technical recommendations to OHD in October Final CONOPS, Plan delivered to OHD in December HOSIP Gate 1 passed January HOSIP Gate 2/3 (combined) on 21 February  Phase 2 SOO submitted to contracts December Implementation work beginning January Target completion date: July 2007 ResSim: Status Update (cont’d)

30 January 2007CHPS Status Update8 CHPS Realization Plan: Status Update  Formerly referred to as “Road Map”  Secured participation of CHPS Acceleration Team (CAT) CAT formed January 2006 NWRFC, NCRFC, CNRFC, ABRFC OHD Senior Scientist  Contract with Apex Begun 3 July 1 st meeting in Kansas City 10 July (last HIC Conference) Monthly conference calls in August, September, October

30 January 2007CHPS Status Update9 CHPS Realization Plan: Status Update (cont’d)  18 September – new direction Finding: NWSRFS infrastructure not a part of CAT’s vision for future operations Look outside OHD for ready-made alternatives  Consider Delft FEWS; arrange demo  16 October – Delft-led demo of FEWS to CAT Conclusion: promising option Recommendation: put together a focused FEWS- based pilot system running in NWS environment at selected RFC(s)

30 January 2007CHPS Status Update10 CHPS Realization Plan: Status Update (cont’d)  December – Realization Plan complete; Highlights: By June 2007: Provide limited demonstration of FEWS at one or two RFCs By June 2007: Demonstrate FEWS as part of ResSim solution at CNRFC By January 2008: Assess suitability of FEWS as the modeling infrastructure software for RFCs By July 2008: Define broader requirements for new forecasting environment  Collaborate with Raytheon on integration of CHPS with AWIPS II By December 2008: Test first baseline CHPS for 2-3 RFCs (note: already too late for AWIPS OB8 baseline!) January – September 2009: Full roll-out for first baseline CHPS to all RFCs (AWIPS OB9 schedule not confirmed)

30 January 2007CHPS Status Update11  Approach Engage Delft via RTi contract to develop the pilot Leverage RTi NWSRFS knowledge/experience Demonstrate viability of FEWS in an NWS RFC environment  Purpose is to demonstrate complete forecast model thread on representative river basins  Purpose is NOT to compare FEWS results with NWSRFS  Accomplish in a short time  Develop as little throw-away code as possible (maximize re- use) Keep all CAT members in the loop  Monthly status reports  All members to attend final demo  Use HOSIP Gate reviews to gain insight into technical details Conduct risk reduction activities  Create OHD development team  Monitor AWIPS II developments  Arrival of new RTi Program Manager Silver Spring – Saud Amer CHPS FEWS Pilot: Status Update

30 January 2007CHPS Status Update12 Delft-RTi activities  Contract begun 26 September  Phase 1 - Complete Define key minimum requirements for demo system Select basins for demo  NWRFC: Santiam River  NCRFC: Red River, Buffalo River Develop conceptual solution and implementation plan Passed HOSIP Gate 2/3 24 January  Phase 2 Implement - underway Demo at NWRFC in April 2007 CHPS FEWS Pilot: Status Update (cont’d)

30 January 2007CHPS Status Update13 Risk Reduction: OHD Development Team activities  Team composition Lead: Sudha Rangan, RSIS. Multi-year practical SOA expertise Two other part-time developers (shared with other OHD projects)  Integrate new Frozen Ground SAC-SMA model (“Heat Transfer” version) into FEWS Pilot. Advantages: Develops FEWS experience in-house; enables OHD to evaluate quality of contractor-developed software Demonstrates ease with which OHD science prototypes can be integrated into operations Provides enhanced functionality at demo sites CHPS FEWS Pilot: Status Update (cont’d)

30 January 2007CHPS Status Update14 Risk Reduction: OHD Development Team activities  Current status Software coding to connect original Fortran-based OHD model to FEWS complete FEWS loaded on OHD system - integration tests underway Next: port Fortran prototype model code to Java  Re-use SAC-SMA Java code already in use in SSHP  SSHP code highly modular, so new model code easily integrated  Due date 16 February – on track CHPS FEWS Pilot: Status Update (cont’d)

30 January 2007CHPS Status Update15 Risk Reduction: Monitor AWIPS II developments  Ensure participation of FEWS Pilot Team Lead (Sudha) in AWIPS II activities  Install AWIPS Development Environment (ADE) locally, as Raytheon delivers capabilities (Oct 2006 – June 2007) Conduct independent assessment of ADE capabilities Provide Raytheon ADE developers with feedback for corrections and improvements Begin analysis of possible integration points with CHPS  Attended Raytheon’s first ADE training last week (1/23 - 1/25): Sudha, Chip, Hank (See later slide for more details on AWIPS II status) CHPS FEWS Pilot: Status Update (cont’d)

30 January 2007CHPS Status Update16 Final capabilities planned for pilot system: Snow model – use existing Delft model, such as a degree- day model (as placeholder) SAC-SMA model – port the latest OHD frozen ground model to FEWS Unit hydrograph operation – use Delft existing Routing model – use Delft SOBEK model (configured on the Red River Basin) Reservoir model – use simple Delft reservoir model that can reasonably mimic basic functionality currently implemented in an existing SSARR, RES-SNGL or RES-J model Include functionality provided by ADD/SUB and ADJUST-Q CHPS FEWS Pilot: Status Update (cont’d)

30 January 2007CHPS Status Update17 Next steps beyond the pilot NWRFC and NCRFC to run FEWS May through December 2007 CNRFC to run FEWS as part of ResSim solution beginning June 2007 Regular conference calls with demo sites to review usability, functionality, issues, etc. Develop “success criteria”: how OHD decides whether to adopt FEWS as the successor to NWSRFS for its river forecasting infrastructure Final assessment on adoption of FEWS Begin requirements process, per the Realization Plan CHPS FEWS Pilot: Status Update (cont’d)

30 January 2007CHPS Status Update18 HydroXC: Status Update Phase 3 Goals  Develop & publish version 3.0 of schema with more detailed sub- schema templates for common data objects  Develop adapter capable of reading and writing SHEF messages and generating HydroXC-compliant XML (examine suggestion from SR for E-19 data sharing)  Continue to foster collaboration with similar organizations such as CUASHI Progress & Status  December Phase 3 kick-off meeting held on 1 December  Visit Site to be moved to in Q2 FY07www.hydroxc.org  OHD to provide sponsorship until Consortium gains momentum Apex to continue coordination for Consortium Dr. Michael Piasecki (Drexel University) to take over technical leadership  Next: Apex to present draft sub-schemas in early February

30 January 2007CHPS Status Update19  Evaluate alternative models HSMB currently evaluating several hydraulic models to supplement FLDWAV & provide RFCs with alternatives Evaluation due to end June 2007 Refer to HSMB Hydraulics Group presentation  Provide the means to access other models HEC ResSim adapter has been designed to provide easy access to other HEC models Models similar to NWSRFS models will be included in the FEWS Pilot (e.g., Delft snow model will be substituted for NWSRFS Snow-17) Model Expansion: Status Update

30 January 2007CHPS Status Update20  OHD meeting with Raytheon AWIPS II architect on 27 September OHD provided detailed review of NWSRFS architecture & design Raytheon underestimated complexity; seeks OHD help  AWIPS II: AWIPS Development Environment (ADE) due June 2007  All development orgs received 1 st training January 2007  Follow-up training expected later in the year Raytheon to re-engineer all AWIPS components by late 2009  Raytheon is conducting re-engineering analysis NOW AWIPS II: Status Update

30 January 2007CHPS Status Update21  AWIPS II (cont’d): Raytheon’s approach to Hydro:  WFO hydro to be fully integrated within ADE/Common AWIPS Visualization Environment (CAVE)  Meeting on 10 January with Raytheon revealed approach based on simply re-casting existing NWSRFS (CHPS will provide completely new infrastructure not based on NWSRFS)  Future of RFC user interaction within CAVE is unknown Could be part CAVE, part RFC unique  Continue to monitor AWIPS II progress via ADE deliveries SOA expert (Sudha) currently evaluating ADE in parallel with FEWS AWIPS II: Status Update (cont’d)

30 January 2007CHPS Status Update22  Ensembles Formation of new Experimental Ensembles Forecast System (XEFS) working group  XEFS group co-led by CAT member (Rob Hartman)  OHD CHPS lead (Chris Dietz) also a member  Operational concepts currently being refined XEFS must ultimately be re-architected for CHPS FEWS may already provide some basic tools – OHD to investigate  Distributed Modeling Continue with NWSRFS-based version through at least end of OB8 Time frame for CHPS-based solution yet unknown  Modular OB7.2 design will allow maximum code re-use  Ultimately all new science prototypes must be developed in a CHPS environment OHD Science Prototypes

30 January 2007CHPS Status Update23  Continued RFC involvement in evolution of CHPS  Demonstration in April of FEWS Pilot at NWRFC (report will be provided at next HIC Conference)  Assessment of FEWS Pilot through operational use later in the year  End of begin definition and prioritization of future CHPS requirements, such as: calibration tools verification tools short, medium, and long-term ensembles processing distributed modeling capability including accommodation for future extensions probabilistic distributed modeling grid editor other (e.g., Index Velocity Ratings)  Develop a CHPS web page – currently under construction; URL will be available before next HIC Conference Next Steps

30 January 2007CHPS Status Update24 Comments or Questions? End of Presentation