12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.

Slides:



Advertisements
Similar presentations
Building a Career Portfolio
Advertisements

Log System Spec 1 Logical Systems Specification Module Two stages in the module – Stage 4 - Technical Systems Options – Stage 5 - Logical Design Performed.
We have developed CV easy management (CVem) a fast and effective fully automated software solution for effective and rapid management of all personnel.
1 REVIEWER ORIENTATION TO ENHANCED PEER REVIEW April
International Society for Pharmaceutical Engineering Student Chapter Standard of Excellence Training Program Webinar August 2007.
How to Document A Business Management System
Educational Research: Competencies for Analysis and Application, 9 th edition. Gay, Mills, & Airasian © 2009 Pearson Education, Inc. All rights reserved.
Project Bidding Procedures Enhancing Data and Presentation Skills for Engineers EDASPE Writing the RFP Training Courses – July 2004.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
Review of Liquid Resin Molding Specifications FAA Workshop September 2003 Scott Reeve National Composite Center.
1 Major changes Get ready! Changes coming to Review Meetings Considering Potential FY2010 funding and beyond: New 1-9 Scoring System Scoring of Individual.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
GUIDELINES AN INTRODUCTION TO: Evaluation TECHNICAL
©© 2013 SAP AG. All rights reserved. Product Engineering Scenario Overview Creating Product Design Information and Materials in External System Maintaining.
Software Documentation Written By: Ian Sommerville Presentation By: Stephen Lopez-Couto.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guideline for Verifying Field.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guideline for Design, Installation,
Process Engineer’s Role in Project Management Dr Abdullah Malik.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guide for Evaluation and Repair.
Basic Principles of GMP
Jennifer Ambrose Hanson CTC Assistant Director. The Lab Report (#2 due September 24-28) ● ● The lab report measures your individual ability to document.
XBRL Second Phase of Implementation. Background of XBRL Implementation MCA has taken a lead in the Implementation of XBRL by mandating the XBRL filing.
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
1 The Initial Report Preparation Guidelines. 2 The Initial Report u Definition of project scope u Project aims and objectives u Initial project plan.
S Q A.
This semester you will use an engineer’s notebook to document the process that you will use to design a product. Your notebook will be organized and formatted.
Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations Documenting your work.
© 2001 Business & Information Systems 2/e1 Chapter 8 Personal Productivity and Problem Solving.
Lead Black Slide Powered by DeSiaMore1. 2 Chapter 8 Personal Productivity and Problem Solving.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
FISCAL REPORTS FMOC 1002 – FWOC 0302 Rev. 10 APR 12.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
Chapter 7 Preincident Planning. Objectives Describe the concept of a preincident plan. Describe the phases of preincident planning. Describe the various.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Aerospace Process.
12/2/2004Module 2A1 The NCSX Engineering Web – An Overview Part I Work Planning, Project Files, Management Plans and Procedures.
Penn State Electronic Theses and Dissertations Project Graduate Council Library Computing Services Graduate School University Libraries Center for Academic.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Final Report – An Overview Week 4 Day 2.
Commission on Teacher Credentialing Ensuring Educator Excellence 1 Program Assessment Technical Assistance Meetings December 2009.
NCSX Data Management Plan Peer Review Bob Simmons March 31, 2003.
Once the designer has decided to use and selected the correct Magna 3 pump in a specific application they must communicate these decisions to the contractor.
Spring CS-EE 481 Lillevik 481s07-l2 University of Portland School of Engineering Senior Design Lecture 2 Technical staff Prototype phase: DEP, TOP.
11/23/2004Module # 11 The NCSX Project Web An Indoctrination and Overview.
How the NCSX Project Does Business
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
CIS Support By Kamonayi Mubenga Bowie State University, MD Technical Division-CIS.
NCSX Document and Records Plan Peer Review Bob Simmons March 14, 2003.
Preparations for working on Station 1 November 22, 2005.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
Formal Report Strategies. Types of Formal Reports Informational Presents Info Analytical Presents Info Analyses info and draws conclusions Recommendation.
Analysis. This involves investigating what is required from the new system and what facilities are available. It would probably include:
For TC Handbook Subcommittee Chairs and Members January 24, 2016 Suzanne LeViseur Chris Ahne Training Leader Handbook Committee Chair Heather Kennedy Handbook.
College of Arts & Sciences Promotion and tenure Dossier assembly workshop spring 2017.
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
College of Arts & Sciences Promotion and tenure Dossier assembly workshop fall 2017.
Design and modeling 10 step design process
Software Documentation
MODULE A - ADMINISTRATIVE
GUIDELINES AN INTRODUCTION TO: Material Selection TECHNICAL
Electronic submission of reappointment applications in Vibe
Overview of Oracle Site Hub
Energy Statistics Compilers Manual
A New Tool for Evaluating Candidate PM FEM and PM2.5 ARM Monitors
Presentation transcript:

12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans

12/2/04Module 2C2 Purpose Provides overview indoctrination of several parts of the NCSX Engineering Web This module will focus on the next two parts of the NCSX Engineering Web Design Data Fabrication Assembly, and Installation & Test Plans Parts I–II and IV will provide overview indoctrination of the other parts of the NCSX Engineering Web Part I (Module 2A) – Work Planning & Project Control, Project Files, and Management Plans & Procedures Part II (Module 2B) – Specs, Design Criteria, & Statements of Work and Design Reviews, Analyses, and R&D Part IV (Module 2D) – Engineering Management & Systems Engineering and Other Later modules to go into much further depth on how the NCSX Project will do business The NCSX Engineering Web is, to a major extent, the electronic NCSX filing system Exceptions are the models and drawings contained in the Pro/INTERALINK data base and the hard copy supplier and other PPPL documents stored in the PPPL Operations Center However – bulk of files stored electronically on this web

12/2/04Module 2C3 Design Data Information Links Design Descriptions Facility Layout Metrology Technical Data Material Properties Vacuum Materials Committee Guidance Links Pro/E & INTRALINK

12/2/04Module 2C4 Design Descriptions Direct link to Design Descriptions (DDs) Prepared for design reviews Not in a specification format, although similar information included to provide a basis for the design Provide snapshot in time of the design status Design Descriptions are NOT controlled or kept current – updated for each review

12/2/04Module 2C5 Facility Layout Example: C-Site First Floor Layout

12/2/04Module 2C6 Metrology Example: Metrology Needs Assessment

12/2/04Module 2C7 Technical Data Technical Data Sheets Also included in GRD

12/2/04Module 2C8 Material Properties Example: CTD-101K Epoxy Resin System Tabular & Graphical Data Spreadsheet (VBA) Functions

12/2/04Module 2C9 Vacuum Materials Committee Purpose and Membership Inquiries

12/2/04Module 2C10 Information Link to Pro/INTRALINK Information Pro/INTRALINK Info Early Training Material Pro/INTRALINK Guide Link Other Important Info

12/2/04Module 2C11 Fabrication, Assembly, Installation & Test Plans Information Links Field Period Assembly Plan Final Assembly Plan Test and Evaluation Plan Detailed Mfg Plans & Procedures Guidance Links Document Reviews

12/2/04Module 2C12 Field Period Assembly Plan Initial Design Description of Field Period Assembly Expect more detailed plans to evolve as detailed plans and procedures are developed. These more detailed plans and procedures will appear on the Detailed Mfg Plans and Procedures web

12/2/04Module 2C13 Final Assembly Plan Initial Design Description of Final Assembly Expect more detailed plans to evolve as detailed plans and procedures are developed. These more detailed plans and procedures will appear on the Detailed Mfg Plans and Procedures web

12/2/04Module 2C14 Test and Evaluation Plan Initial Test and Evaluation Plan Will be under revision control Will provide overview of test and evaluation phase of NCSX

12/2/04Module 2C15 Detailed Manufacturing Plans and Procedures Site for all Detailed Manufacturing Plans and Procedures

12/2/04Module 2C16 Information Link to Document Review Guidelines Postings of Plans and Procedures to be Reviewed Isn’t this duplicative of other pages?

12/2/04Module 2C17 Summary This introduction to the NCSX Engineering Web module has covered several parts of the NCSX Engineering Web Design Data and Fabrication Assembly, and Installation & Test Plans Other introductory modules will cover the remaining parts of the NCSX Engineering Web Module 2A – Work Planning & Project Control, Project Files, and Management Plans & Procedures Module 2B - Specs, Design Criteria, Statements of Work and Design Reviews, Analyses, and R&D Module 2D - Engineering Management & Systems Engineering and Other More detailed modules will focus in depth on key aspects of how the NCSX Project will do business