REXTRAP plans for 2005 And future developments Pierre for the REX TEAM, REX’s day, 11/03/2005.

Slides:



Advertisements
Similar presentations
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
Advertisements

ISOLDE WS 2007 Results with ISCOOL a new Radio Frequency Quadrupole Cooler and Buncher at ISOLDE P. Delahaye, H. Frånberg, AB-OP-PSB, ISCOOL, COLLAPS,
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Status of the SPECTRAP project HITRAP meeting 27 September 2007 by Danyal Winters.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Status of DRIFT II Ed Daw representing the DRIFT collaboration: Univ. of Sheffield, Univ. of Edinburgh, Occidental College, Univ. of New Mexico Overview.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
INSTITUUT VOOR KERN- EN STRALINGSFYSICA 23-May-2002Weak Interaction Trap for CHarged particles1 Progress of the WITCH project Valentin Kozlov NIPNET meeting,
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
Development of an H - plasma generator for SPL Matthias Kronberger, CERN BE/ABP-HSL SPL collaboration meeting, 2010/11/25.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE.
The REXTRAP Penning Trap Pierre Delahaye, CERN/ISOLDE Friedhelm Ames, Pierre Delahaye, Fredrik Wenander and the REXISOLDE collaboration TAS workshop, LPC.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Status of QUACO project
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
A mass-purification method for REX beams
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
High Resolution Separator
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
WITCH - a first determination of the beta-neutrino angular correlation coefficient in 35 Ar decay S. Van Gorp, M. Breitenfeldt, V. De Leebeeck,T. Porobic,
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
1 1.Summary of H- source review 2.Options for connection to the PS Booster 1.Summary of H- source review 2.Options for connection to the PS Booster.
1 « COLD MOLECULES NETWORK « COLD MOLECULES NETWORK Business meeting Durham, April 1 st 2004.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
NATIONAL INSTITUTE OF NUCLEAR PHYSICS Legnaro National Laboratories Numerical simulation strategy for the SPES FEBIAD ion source INFN – CISAS collaboration.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
Eurisol DS, Task 11 meeting, Helsinki September‘07 Task 11.2: Fragmentation of post accelerated ISOL beams David Pérez Loureiro Universidad de Santiago.
Thin Film Technology - Student Talk Sophie Chauvin 02/02/16 Leak Detection method for Vacuum Systems 1.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
Improving & combining the spatiale & temporal resolution
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
T980 STATUS AND CHANGES FOR
Machine operation and daily maintenance management in SOLEIL
Francois and Lau EATM 17 July 2012
Complementary ISTC Projects #3888, 3889p
CLEX* Status and Plans CTF3 complex CLEX
First results from IS468 and further investigation of in-trap decay of 62Mn First results from 2008 ; Problems and questions ; Further investigations ;
Target and Horn status report
Magdalena Kowalska, CERN PH-SME-IS
A. Herlert, CERN PH-SME-IS
HIE-LINAC status report
INTC September 2002 ISOLDE Mats Lindroos Mats Lindroos.
Advanced Research Electron Accelerator Laboratory
Presentation transcript:

REXTRAP plans for 2005 And future developments Pierre for the REX TEAM, REX’s day, 11/03/2005

Current status The trap is currently operational. -The cage has been cleaned by Ivan and Romain -the turbo pumps have been greased by Sophie - the power supplies resources are going to be well under control (see talk of Nicolas) - A shortcut of a trap electrode had to be fixed in the cross piece in front of the magnet -efficiencies of 30-40% have been obtained with the new CS. We should reach soon 50% - the power regulation from Mike behaves the right way. Some more tests needed But: -The DDS module has one channel which is broken. This quite fragile module gives the voltages of the cooling excitation. Some redesign? - The control system is in its commissioning stage (cf Romain’s presentation). Some improvements to foresee? - The long standing sparking problem has to be definitely fixed - the vacuum automat still doesn’t work fully properly - the balloon won’t be connected this year - the tests for the beam preparation of this year’s beamtime have to be started

Tentative schedule 1) Labview CS commissioning. February-March-April. Not 100% time consuming 2) Rotating wall cooling tests: emittance measurement. Possibly end of March / beginning of April - 1 week 3) Change of buffer gas: Ar cooling. 2 days mid April 4) Change of buffer gas: tests with He. 3 days mid April 5) Tests with Li from REXTRAP ion source, light ions cooling. One week in May 6) May  October: REX operation according to the ISOLDE schedule 7) Mass resolving power tests: some tests between July – August (summer student time) Some preliminary tests in May could be foreseen. And the WITCH tests that could be done in autonomy

Future developments - Mass resolving power of the trap Tests needed. Implementation of a new excitation scheme – 6/9 months of a PhD -Conclusions on the rotating wall cooling tests. Still some emittances to be measured 1 month of a PhD – article? -Development of the molecular beam breakup techniques – 2/4 months. A collaboration with theoreticians could be helpful - Improving the typical efficiency of the trap. Quite careful studies (5-10 months) by simulation and tests for -lowering the magnetic mirror effects -Implementing a more efficient cooling excitation - New differential pumping scheme at the trap. 1/3 months. More efficient trapping scheme. Use of He as a buffer gas. - Beam diagnostics improvements. Beam identification after the trap - 3 months.

REXTRAP R&D: The manpower issue Several tracks are pursued -Modification of the current position of Romain  PhD? Doctorate students program at CERN/ Marie Curie applications -One application to the Austrian program