HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008.

Slides:



Advertisements
Similar presentations
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
Advertisements

CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
HBD HV Control and Monitoring System HV, P/T and Gain Variations Manuel Proissl HBD Meeting 04/06/2010.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 2 – Manuel Proissl HBD Meeting 06/23/2009.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
Copyright © Yokogawa Electric Corporation 13 th February Exaquantum R2.70 Enhancements.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
HV system migration to USB interface Presented by Korolev M.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
TAKING CARE GUIDELINES Sub-title Place, Month Year.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 1 – Manuel Proissl HBD Meeting 06/16/2009.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
HBD HV Control and Monitoring System PHENIX Manuel Proissl HBD Meeting 12/09/2008.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Remapping of 48V generators in US15 – Load Balancing Much better balanced load between chan A and chan B outputs More even load between generators, avoiding.
1 HBD Update Itzhak Tserruya DC meetingJune 10, 2009 June 10, 2009.
1 The System Menu. 2 The System menu Dashboard Page displayed upon every login. It encompasses several boxes organised in two columns that provide a complete.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 09/30/2008.
PHENO 2010 Christopher White, IIT 1 The Daya Bay Reactor Antineutrino Experiment Christopher White 1.
The Adventures of Sparky LeCroy TK Hemmick for the Stony Brook Crew and Maxim.
FOPI – Slow Control Content 1.FOPI experiment - Overview 2.GUIs for FOPI 3.System Design.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
News on GEM Readout with the SRS, DATE & AMORE
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
Virtualization Station
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
HBD HV Control System Development Manuel Proissl HBD Meeting 09/18/2007.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Hardware, 010 – Revision notes Scales use Controller board O/Ps for Feed Control (FCE’s) Flow meters use their own on board O/Ps for Feed Control (FCE’s)
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
HBD HV Control and Monitoring System RESISTORS, CALIBRATION & CO. Manuel Proissl HBD Meeting 12/23/2008.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
1 HBD Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions.
DPM - IPMI Product Support Engineering VMware Confidential.
HV-system Oleg Maev 1. Brief overview of HV-systems Muon chambers circuits 2. States of HV according LHC/LHCb conditions 3. Useful practical applications/knowleges/tools.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
ATLAS MDT HV – LV Detector Control System (DCS)
Large CMS GEM with APV & SRS electronics
Overview of T1 detector T1 is composed by 2 arms
Presentation transcript:

HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008

QUICK UPDATE  “HBD Real-time Simulation Project” since December 7 th, 2007 – making HV control crash tests in the PHENIX environment possible  Discharge Resistor changed to 10K  discharge time issue solved | now ~ 1ms  LeCroy’s attempt to self-restart after trip has been completely blocked by recovery routine on PIC18F4620/8722 Microcontroller on relay board  HV Control for experts with enhanced features, like P/T data life remote access and threshold control, in development Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 1 of 5 Connect Relay Discharge Relay From LeCroy 1471 To Resistor Chain 10K

QUICK UPDATE Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 2 of 5 ROOT Interface Loop over channels Check / Verify Stat. [every 15sec] Respond to users HV Server (va022) – PHENIX HV Client LeCroy 1458 Mainframe LC 1471 Mesh / GEM Test Box 1 module to serve 16 ……… Divider Test Box HV Client hvdb HBD Server 8 Trip Det. TS hbd1.phy.bnl.gov HBD Lab – Physics, BNL Switch secret IP 8  Logically the HBD is sitting in the IR private network CAEN SY 1527 Mainframe 11 chn. Mod. 14 ……… P/T, etc.

QUICK UPDATE  New Lab for HV studies since February, 2008 at Physics, BNL LeCroy 1458 w/ 1471s and CAEN SY1527 w/ (11 chn. Board) in test Triple-GEM & Divider Test Box – runs with both MFs in parallel Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 3 of 5

QUICK UPDATE  New Lab for HV studies since February, 2008 at Physics, BNL Two high-speed HBD servers: Automatic read-out of P/T data from hutch at PHENIX [in progress] (so far by Bob and Jason) HV Detector performance data accessible, etc Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 4 of 5

QUICK UPDATE  New Lab for HV studies since February, 2008 at Physics, BNL ADAM 5000E Data Acquisition system tests in session (access via OPC servers) High Precision (~ 0.1% offset) HV Control Feedback system in development for Run9 – independent from PS (LeCroy or CAEN) State-of-the-art high-speed system for HV Detector Simulations, Maxwell 3D, Crash Tests, etc. installed in HBD lab Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 5 of 5 Ethernet PHONCS8 OPC Server A Fiber Interface 38.4Kb TXD RXD Fiber Interface RMCS-3 CMW1 -0x98 CMW2 -0x90 -0x91 CME -0x80 HBD Heater -0x82 -0x83 DAQ RoomInteraction Region OPC A-4