Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 11.

Slides:



Advertisements
Similar presentations
Flexible Budgets and Standard Costs
Advertisements

Standard Costs and Variances
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Standard Costs and the Balanced Scorecard.
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
14-1 Copyright © 2004 by Nelson, a division of Thomson Canada Limited. Standard Costing: A Managerial Control Tool 14 PowerPresentation® prepared by David.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Merchandising Operations Chapter 5.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Standard Costing and Variances
Cost Analysis for Control
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 23.
MSE608C – Engineering and Financial Cost Analysis Budgeting and Variance Analysis.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
Flexible Budgets and Standard Cost Systems
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Additional Topics in Variance Analysis Chapter 17 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Chapter 7: Standard Costing and Variance Analysis
C H A P T E R 6 Monitoring Performance in Cost, Profit and Investment Centers.
Flexible Budgets/Variances II Chapter Eight. Developing Budgeted Variable Overhead Allocation Rates Step 1: Choose the time period used to compute the.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
23 Performance Evaluation Using Variances from Standard Costs
8 - 1 StandardStandard/Budget AdvantageAdvantage of Standard Costs StandardStandard Setting Direct Materials- Direct Labor Var Manufacturing Manufacturing.
Chapter 17 – Additional Topics in Variance Analysis
Financial and Managerial Accounting
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
Cost Accounting: Foundations and Evolutions, 8e Kinney ● Raiborn © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
Chapter 23 Flexible Budgets and Standard Cost Systems
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 21 Flexible Budgets and Standard Costing.
Budgetary Planning and Control
Copyright © 2008 Prentice Hall All rights reserved 11-1 Flexible Budgets and Standard Costs Chapter 11.
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
Chapter 13 – Overhead and Marketing Variances
Performance Evaluation
Copyright © 2007 Prentice-Hall. All rights reserved 1 The Master Budget and Responsibility Accounting Chapter 10.
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
1 Adapted by Cynthia Fortin, CPA, CMA Introduction to Managerial Accounting, Brewer, Garrison,Noreen.
Performance Evaluation Through Standard Costs Chapter 26 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College.
Chapter 22. Prepare a flexible budget for the income statement.
Flexible Budgeting Chapter 07, 08
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Profit from Production.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. McGraw-Hill/Irwin.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Chapter 22. Prepare a flexible budget for the income statement.
Standard Costing and Variance Analysis
Chapter 9 Introduction to a Standard Cost System.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
STANDARD COSTS AND VARIANCES CHAPTER 11 1 Debbie Garvin, JD; CPA – ACG2071.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
Chapter 23 Flexible Budgets and Standard Cost Systems Demonstration Problems © 2016 Pearson Education, Inc.23-1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Flexible Budgets/Variances I Chapter Seven. Static Budget Example Webb Co. manufactures and sells jackets. Budgeted variable costs per jacket are as follows:
MANUFACTURING FIRMS USE STANDARD COSTS AND STANDARD QUANTITIES TO BUDGET FOR AND ANALYZE PRODUCTION Standard Cost Variance Analysis.
Chapter 19 Manufacturing Overhead Standard Costs: Completing the Accounting Cycle for Standards costs.
20 Monitoring Performance in Cost, Profit and Investment Centers
© 2008 The McGraw-Hill Companies, Inc., All Rights Reserved.
Foundations and Evolutions
Performance Evaluation Using Variances from Standard Costs
© 2017 by McGraw-Hill Education
A Monthly Budget Variance Report
© 2017 by McGraw-Hill Education
Flexible Budgets, Variances, and Management Control: I
Presentation transcript:

Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 11

Copyright © 2007 Prentice-Hall. All rights reserved 2 Objective 1 Prepare a flexible budget for the income statement

Copyright © 2007 Prentice-Hall. All rights reserved 3 Static Budget In Touch Responsibility Accounting Performance Report (Amounts in thousands) September 2009 Manager – All handheld devices BudgetActualVariance Operating income: PDAs$ 75$ 60$(15) Cell Phones Total operating income$549$579$ 30

Copyright © 2007 Prentice-Hall. All rights reserved 4 Flexible Budget – E11-17 Logiclik Monthly Flexible Budget Per Unit Output Units (Mouse Pads) 40,000 50,000 70,000 Sales revenue$11.00 Variable expenses$ 5.00 Fixed expenses 200, ,000 Total expenses Operating income $440,000$550,000$770, ,000250,000350, ,000450,000600,000 $40,000$100,000$170,000

Copyright © 2007 Prentice-Hall. All rights reserved 5 E11-18 Fixed Variable

Copyright © 2007 Prentice-Hall. All rights reserved 6 Objective 2 Use the flexible budget to show why actual results differ from the static budget

Copyright © 2007 Prentice-Hall. All rights reserved 7 Static Budget Variances Sales Volume VarianceFlexible Budget Variance Actual Results Flexible Budget based on actual number of outputs Static Budget based on expected number of outputs Static Budget Variance

Copyright © 2007 Prentice-Hall. All rights reserved 8 Sales Volume Variance Static Budget (for the # units expected to be sold) - Flexible Budget (for the # units actually sold)

Copyright © 2007 Prentice-Hall. All rights reserved 9 Flexible Budget Variance Flexible Budget (for the # units actually sold) - Actual Results

Copyright © 2007 Prentice-Hall. All rights reserved 10 E11-20 Manion Industries Income Statement Performance Report (in thousands) Year 20X7 Act. Results at Act Prices Flex Bud Variance Flex Bud- Act # Units Sales Volume Variance Static Budget Output units Sales rev. Variable exp. Fixed exp. Total exp. Op. income $1,160$1,120$1, $441$412$588 $40 U$210 F 5 U F14 U U 11 F34 U $29 U$176 F

Copyright © 2007 Prentice-Hall. All rights reserved 11 E11-20 Manion Industries Income Statement Performance Report (in thousands) Year 20X7 Act. Results at Act Prices Flex Bud Variance Flex Bud- Act # Units Sales Volume Variance Static Budget Op. income $441 $412 $588 $29 U$176 F Static Budget Variance $147,000 F

Copyright © 2007 Prentice-Hall. All rights reserved 12 Objective 3 Identify the benefits of standard costs and learn how to set standards

Copyright © 2007 Prentice-Hall. All rights reserved 13 Standard Costs Budget for a single unit Price standards Quantity standards

Copyright © 2007 Prentice-Hall. All rights reserved 14 Price Standards Direct materials - Purchase price (after early-pay discount) + freight-in + receiving costs Direct labor – basic pay rates + payroll taxes + fringe benefits Manufacturing overhead – determine resources needed for support activities and determine appropriate allocation base

Copyright © 2007 Prentice-Hall. All rights reserved 15 Quantity Standards Direct materials – product specifications allowing for spoilage Direct labor – time requirements to produce product as well as level of experience needed to do specific tasks Manufacturing overhead - determine resources needed for support activities

Copyright © 2007 Prentice-Hall. All rights reserved 16 Benefits of Standard Costs Helps managers In budget preparation Target levels of performance Identify performance standards Set sales prices Decrease accounting costs

Copyright © 2007 Prentice-Hall. All rights reserved 17 Variances Efficiency VariancePrice Variance Actual Price X Actual Quantity Standard Price X Actual Quantity Standard Price X Standard Quantity Total Cost Variance

Copyright © 2007 Prentice-Hall. All rights reserved 18 Price Variance Measures how well the business keeps unit costs within standards (Actual Price x Actual Quantity) – (Standard Price x Actual Quantity) or (Actual Price – Standard Price) x Actual Quantity (AP – SP) x AQ

Copyright © 2007 Prentice-Hall. All rights reserved 19 Efficiency Variance Efficiency - measures how well the business uses its materials or human resources (Standard Price x Actual Quantity) – (Standard Price x Standard Quantity) or (Actual Quantity – Standard Quantity) x Standard Price (AQ – SQ) x SP

Copyright © 2007 Prentice-Hall. All rights reserved 20 Variances Sales Volume VarianceFlexible Budget Variance Actual Results Flexible Budget based on actual number of outputs Static Budget based on expected number of outputs Static Budget Variance Efficiency Variance Price Variance

Copyright © 2007 Prentice-Hall. All rights reserved 21 Objective 4 Compute standard cost variances for direct materials and direct labor

Copyright © 2007 Prentice-Hall. All rights reserved 22 E11-22 Total Cost Variance for Direct Materials: Static budget $1.10 x 7’ x 200,000 fenders$1,540,000 Actual cost $1.05 x 1,450,0001,522,500 $17,500 F

Copyright © 2007 Prentice-Hall. All rights reserved 23 E11-22 Materials price variance: Actual Quantity = 1,450,000 feet Actual Price = $1.05 Standard Price = $1.10 (Actual Price – Standard Price) x Actual Quantity ($ $1.10) x 1,450,000 feet = $72,500 F

Copyright © 2007 Prentice-Hall. All rights reserved 24 E11-22 Materials efficiency variance: Actual Quantity = 1,450,000 Standard Quantity = 200,000 fenders x 7’ = 1,400,000 Standard Price = $1.10 (Actual Quantity–Standard Quantity) x Standard Price (1,450,000-1,400,000) x $1.10 = $55,000 U

Copyright © 2007 Prentice-Hall. All rights reserved 25 E11-22 Total Cost Variance for Direct Labor: Static budget $13 x.025 hrs x 200,000 fenders$65,000 Actual cost $14 x 4,50063,000 $2,000 F

Copyright © 2007 Prentice-Hall. All rights reserved 26 E11-22 Labor price variance: Actual Quantity = 4,500 hours Actual Price = $14.00 Standard Price = $13.00 (Actual Price – Standard Price) x Actual Quantity ($14 - $13) x 4,500 hours = $4,500 U

Copyright © 2007 Prentice-Hall. All rights reserved 27 E11-22 Labor efficiency variance: Actual Quantity = 4,500 hrs. Standard Quantity = 200,000 fenders x.025 = 5,000 hrs. Standard Price = $13.00 (Actual Quantity–Standard Quantity) x Standard Price (4,500 – 5,000) x $13 = $6,500 F

Copyright © 2007 Prentice-Hall. All rights reserved 28 Objective 5 Analyze manufacturing overhead in a standard cost system

Copyright © 2007 Prentice-Hall. All rights reserved 29 Total Overhead Variance Manufacturing Overhead Variance Actual Overhead Cost Standard Overhead Cost

Copyright © 2007 Prentice-Hall. All rights reserved 30 Allocating Overhead in a Standard Cost System Predetermined overhead rate x Standard quantity of allocation base allowed for actual outputs

Copyright © 2007 Prentice-Hall. All rights reserved 31 E11-25 Manufacturing overhead variance: Standard overhead costs: 33,000 gallons x $1.50 $49,500 Actual overhead costs: $16,200 + $32,500 48,700 $800 F

Copyright © 2007 Prentice-Hall. All rights reserved 32 Production Volume Variance Overhead Flexible Budget Variance Total Overhead Variance Manufacturing Overhead Variance Actual overhead cost Standard overhead cost Flexible budget overhead for actual outputs

Copyright © 2007 Prentice-Hall. All rights reserved 33 Manufacturing Overhead Variances Overhead flexible budget variance – how well managers controlled overhead costs Production volume variance - when actual production differs from expected production

Copyright © 2007 Prentice-Hall. All rights reserved 34 E11-25 Overhead flexible budget variance: Actual overhead cost$48,700 Flexible budget overhead ($.50 x 33,000) + $30,00046,500 Total overhead flexible budget variance$2,200 U

Copyright © 2007 Prentice-Hall. All rights reserved 35 E11-23 Production volume variance: Flexible budget overhead$46,500 Standard overhead allocated to actual production (33,000 x $1.50)49,500 Total production volume variance$3,000 F

Copyright © 2007 Prentice-Hall. All rights reserved 36 Objective 6 Record transactions at standard cost and prepare a standard cost income statement

Copyright © 2007 Prentice-Hall. All rights reserved 37 Standard Cost Accounting System 1.Each variance has GL account Debit balance – unfavorable Credit balance – favorable

Copyright © 2007 Prentice-Hall. All rights reserved 38 Standard Cost Accounting Systems Each variance has GL account Debit balance – unfavorable Credit balance – favorable Standard costs (not actual costs) are used to record manufacturing costs put into inventory accounts Variance accounts are closed to cost of goods sold at end of period

Copyright © 2007 Prentice-Hall. All rights reserved 39 E11-23 GENERAL JOURNAL DATEDESCRIPTION REF DEBITCREDIT Materials inventory (1,450,000 x $1.10)1,595,000 Direct materials price variance72,500 Accounts payable (1,450,000 x $1.05)1,522,500

Copyright © 2007 Prentice-Hall. All rights reserved 40 E11-23 GENERAL JOURNAL DATEDESCRIPTION REF DEBITCREDIT Work in process inventory (1,400,000 x $1.10)1,540,000 Direct materials efficiency variance55,000 Materials inventory (1,450,000 x $1.10)1,595,000

Copyright © 2007 Prentice-Hall. All rights reserved 41 E11-23 GENERAL JOURNAL DATEDESCRIPTION REF DEBITCREDIT Manufacturing wages (4,500 x $13)58,500 Direct labor price variance4,500 Wages payable (4,500 x $14)63,000

Copyright © 2007 Prentice-Hall. All rights reserved 42 E11-23 GENERAL JOURNAL DATEDESCRIPTION REF DEBITCREDIT Work in process inventory (5,000 x $13)65,000 Direct labor efficiency variance6,500 Manufacturing Wages (4,500 x $13)58,500

Copyright © 2007 Prentice-Hall. All rights reserved 43 E11-26 Western Outfitters, Inc. Standard Cost Income Statement For the Month Ended April 30 Sales revenue $560,000 Cost of goods sold at standard cost 342,000 Manufacturing cost variances: Direct materials price variance$(2,000) Direct materials efficiency variance(6,000) Direct labor price variance4,000 Direct labor efficiency variance(2,000) Overhead flexible budget variance3,500 Production volume variance (8,000) Total manufacturing variances (10,500) Cost of goods sold at actual cost 331,500 Gross profit $228,500

Copyright © 2007 Prentice-Hall. All rights reserved 44 End of Chapter 11