Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines 05.05.2014 Paul Scherrer Institut Synchronous DAQ using.

Slides:



Advertisements
Similar presentations
Wir schaffen Wissen – heute für morgen A.C.Mezger, Paul Scherrer Institut, Switzerland caQtDM, an EPICS display manager with Qt Paul Scherrer Institut.
Advertisements

1 1999/Ph 514: Channel Access Concepts EPICS Channel Access Concepts Bob Dalesio LANL.
Server 2012 R2 Essentials - What’s new ? Bart #techninebe Technine Group.
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Dirk Zimoch for Babak Kalantari, EPICS Collaboration Meeting October SLS F illing P attern F eedback (FPF) system Charge Distribution Control in.
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines Paul Scherrer Institut SwissFEL Timing System.
Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 Real-Time Data Transfer using the Timing System (Original slides and driver code by Babak Kalantari)
Wir schaffen Wissen – heute für morgen Do you believe in Operation Statistics? Presented at the Accelerator Reliability Workshop 2011 Andreas Lüdeke Paul.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Controls tools for operation management at the Swiss Light Source at the EPICS collaboration.
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
V4 – Executive Summary 1.Provide online add/delete of I/O to support continuous operation. 2.Provide redundant control of remote I/O to support improved.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – – P R E – B.
Wir schaffen Wissen – heute für morgen 24. August 2015PSI,24. August 2015PSI, Paul Scherrer Institut Embedded PREEMPT_RT Linux for IOxOS VME IOC Damir.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
New Direction Proposal: An OpenFabrics Framework for high-performance I/O apps OFA TAC, Key drivers: Sean Hefty, Paul Grun.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI EPICS Meeting, Saclay Paul Scherrer Institut SwissFEL Timing System Babak Kalantari.
LCLS Timing Software and Plan 1 Controls Timing Workshop EPICS Collaboration Meeting SLAC LCLS Timing Software and Plan April Kukhee Kim.
IMPROVING THE MRF BASELINE Prague, June 5 th 2014.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
Wir schaffen Wissen – heute für morgen Gateway (Redux) PSI - GFA Controls IT Alain Bertrand Renata Krempaska, Hubert Lutz, Matteo Provenzano, Dirk Zimoch.
1 Channel Access Concepts – EPICS Training – K.Furukawa – Mar EPICS Channel Access Concepts Kazuro Furukawa, KEK, ( ) (Bob Dalesio, LANL,
MRF & Cosylab on timing system: integration support Joze Dedic the best people make cosylab … Head of Hardware.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Windows-based camera IOC with a SMB branch Helge Brands.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Wir schaffen Wissen – heute für morgen Electronic Logbooks Revisited Paul Scherrer Institute Andreas Lüdeke Presented at the ARW 2011.
Connecting LabVIEW to EPICS network
THE DIGITAL REVOLUTION. Wir schaffen Wissen – heute für morgen 15. Apr. 2013PSI, Paul Scherrer Institut The fully digital PSI accelerator control room.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
1 Channel Access Concepts – IHEP EPICS Training – K.F – Aug EPICS Channel Access Concepts Kazuro Furukawa, KEK (Bob Dalesio, LANL)
EPICS and LabVIEW Tony Vento, National Instruments
Babak Kalantari, EPICS Collaboration Meeting, Kobe 2009 A generic driver for Data Buffer of MRF Timing System Babak Kalantari Paul Scherrer Institute Switzerland.
R. Krempaska, October, 2013 Wir schaffen Wissen – heute für morgen Controls Security at PSI Current Status R. Krempaska, A. Bertrand, C. Higgs, R. Kapeller,
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Timo Korhonen Improvements to Indexing Tool (Channel Archiver) ‏ EPICS Meeting, BNL 2010.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Online Software November 10, 2009 Infrastructure Overview Luciano Orsini, Roland Moser Invited Talk at SuperB ETD-Online Status Review.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Intra Pulse Phase Control Manuel Brönnimann :: Paul Scherrer Institut LLRF Workshop 2015.
Using COTS Hardware with EPICS Through LabVIEW – A Status Report EPICS Collaboration Meeting Fall 2011.
2016 Global Seminar 按一下以編輯母片標題樣式 Virtualization apps simplify your IoT development Alfred Li.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN caQtDM: future use of a display manager Helge Brands, Anton Mezger :: Paul Scherrer Institut, Switzerland Spring.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN SwissFEL Timing System status & plans Babak Kalantari :: Large Research Facilities /Controls :: Paul Scherrer Institut.
Wir schaffen Wissen – heute für morgen PSI,2. Oktober 2016 Paul Scherrer Institut Portable Channel Access Server in Python Xiaoqiang Wang Controls Talk.
umbrellaID: Shibboleth 3 and Attribute Authority
CALIPSOplus JRA2 Kickoff: Task 6 – Authentication + Identity
umbrellaID: New Website
Budget JRA2 Beneficiaries Description TOT Costs incl travel
Beam-Synchronous Data Acquisition (BS-DAQ)
Information Collection and Presentation Enriched by Remote Sensor Data
M. Calvi & Th. Schmidt :: Insertion Device :: Paul Scherrer Institut
LabVIEW EPICS Client I/O Server
LCLS Timing Software and Plan
GFA Controls IT Alain Bertrand
Accelerator Network Safety at PSI
Mirjam van Daalen, (Stephan Egli, Derek Feichtinger) :: Paul Scherrer Institut Status Report PSI PaNDaaS2 meeting Grenoble 6 – 7 July 2016.
caQtDM: future use of a display manager
LCLS Event System - Software
Björn Erik Abt :: Paul Scherrer Institut
Mirjam van Daalen, (Stephan Egli, Derek Feichtinger) :: Paul Scherrer Institut Status Report PSI PaNDaaS2 meeting Grenoble 12 – 13 December 2016.
ICS update 7th Experiment Control Workshop
Channel Access Concepts
Beam Synchronous Acquisition on IOC
umbrellaID: OpenIRIS & Umbrella
Control Systems for the APTM and GRID
Channel Access Concepts
Presentation transcript:

Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines Paul Scherrer Institut Synchronous DAQ using Event System Babak Kalantari (GFA Controls)

IOC_1 PV_1 PV_2 PV_3 IOC_2 PV_4 PV_5 PV_6 IOC_m PV_7 PV_8 PV_9 PV_2 PV_6 PV_7  User interest: PV set across several IOCs distinguished from one pulse to the next PV_2 PV_6 PV_7 start Pulser RF Diag. Pulser RF Diag. …… PULSE_1PULSE_2 start Pulser RF Diag. … PULSE_3 PV_2 PV_6 PV_7 PV_2 PV_6 PV_7 IOC_n PV_10 PV_11 PV_12 IOC: I/O controller node, PV: e.g. EPICS channel IOC_0 PV_x PV_y PV_z Beam Synchronous DAQ (BSDAQ) Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines,

on-demand BSDAQ (in production) runs only for specified number of pulses (seconds or minutes) continuous BSDAQ (under design) runs always at the background over a specified history window up to current time (e.g., last 2 days) Beam Synchronous DAQ (BSDAQ) Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines,

Control System Network Node_1 real-time Node_n real-time non real-time (EPICS CA) Timing&Event System Network EVR MasterTimingNode real-time EVG real-time (events + BSDAQ controls) Local data collection at real-time post-acquisition data transfer on-demand BSDAQ Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines,

Local buffering for scalar or small data array (few KB) pool of unassigned buffers parallel users Computing Node data pulse_id on-system data buffering & tagging (large data size) EVR device trigger Computing Node intern. data buffer pulse_id EVR trigger Measurement system on-demand BSDAQ usage Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines,

BSDAQ (IOC level) High level DAQ framework BSDAQ configuration transfer acquired data data analysis storage direct protocol layer (custom / EPICS v4 / CA) EPICS CA on-demand BSDAQ usage Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines,

Remote buffering, Continuous BSDAQ IOC node_n Remote buffer cluster (for the whole facility) Changing policy IOC node_2 IOC node_1 PV_1 PV_2 PV_3 pulse_id_x EVR device1 device2 device3 100Hz trigger PV_1 PV_2 PV_3 pulse_id Atomic snapshot Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines,

Continuous BSDAQ Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines,

R&D + Tests + prototype H/W design & production MRF (external company) System integration engineer (Deployment) generic BSDAQ package System integration engineer (Deployment) common deployment procedure (PSI internal resources) Work management Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines,

Thanks! Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines,

BS-DAQ Mechanism EVR subsystem A H/W_1 EVR subsystem B IOC_B EVG Master Timing: central point of BS-DAQ controls IOC H/W_2 H/W_3 H/W_4 CA (controls net) IOC_A buffer select buffer Events + sync data Client, after DAQ: retrieve data analyze command triggers select