L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

1 Service panels run from detector end to end of support tube X-section through service panels 3-D view of panels PP0 region. All services break here Patch.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Project Status.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
MS, LG, XS PXL ladder tests at IPHC, May 1-7, Preliminary Ladder Testing Results At IPHC MS, XS, LG.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Leo Greiner schedule Evolution of Tasks and Schedule.
Sensor and ladder and dimensions dateChangeVersionwho 3/26/2013Updated with U2 fid positions 1.1LG.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
Start Counter Construction Update Eric Pooser 08/21/2014.
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
PXL Electronics Status update for HFT TC meeting on October 14, 2010 at BNL 1HFT TC 05/11/ LG.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
L. Greiner 1PXL Detector Progress – July 2013 STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
L. Greiner1IPHC-LBNL Phone Conference 05/2011 STAR IPHC-LBNL Phone Conference News and PXL sensor (Ultimate) testing at LBNL.
Sensor (0,0) (20235, 22725) PXL Ultimate sensor Diced Silicon Size mm x mm There is a uniform 15 um border around the sensor lithography 15.
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
HFT face-2-face F.Videbaek Brookhaven National Lab.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Sensor and RDO Review Introduction.
F. Sabatié Slides from D. Attié, S. Procureur June 18 th, 2014 Forward-Tagger Tracker – Status & Plan – – Status & Plan –
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
MS, LG, XS PXL ladder tests at IPHC, May 1-7, Preliminary Ladder Testing Results (part 2) At IPHC MS, XS, LG.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
LU and SEU testing at STAR and LBNL 88” cyclotron LU tests at STAR LU and SEU tests at the 88” cyclotron Test integration with IPHC Test plans IPHC – LBL.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
PXL timing There are two asynchronous systems. STAR PXL RDO L0 trigger L0 detectors Physics collision Trigger processing TCD distribution 1.5 us TBD RDO.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Requirements and feedback form LARP structure review Ruben Carcagno February 2,
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
L. Greiner 1Project X Physics Study, Fermilab, June 18, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
HE FEE Boards production status 26 th May 2016 Mandakini Patil 1.
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
Face to Face Meeting – March 2012 Sarah Morgan
QXF schedule and milestones
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
Presentation transcript:

L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing

L. Greiner2IPHC-LBNL Phone Conference 07/10/2012 STAR Topics Project news Two power bus cable and power regulator testing cable status. Ladder testing results post IPHC visit (MS) Discussion

L. Greiner3IPHC-LBNL Phone Conference 07/10/2012 STAR PXL Project News Preparation for DOE yearly review at BNL on July Primarily a project progress review with significant technical content. A full set of documentation for the PXL detector review is available at Preliminary PXL subsystem presentation available at LINK New Virtex-6 based RDO motherboards. Full complement of 10 assembled boards have been received for the prototype run RDO. Testing is underway. Testing PCBs are designed and will be in layout this week. Expect delivery in the next 2 weeks. Student help as production nears. Tobias Tischler from Frankfurt at LBNL for 6 weeks. Sam Woodmansee – student from UCB doing probe testing (and more) full time summer + part time school year.

L. Greiner4IPHC-LBNL Phone Conference 07/10/2012 STAR Two power bus cable design PCBs are near completion in CERN PCB shop (outer driver boards complete, low mass cables should be complete early this week). Prototype order is for 10 each. > 20 good thinned Ultimate1 sensors have been acquired through probe testing. (yield discussion to be given in MS talk) We will begin by assembling test ladders on cables using bad sensors to check assembly tooling and alignment, then assemble ladders with good sensors. Highest priority is to test the two-power cable design. MS will come to LBNL for this testing. We will place the production order for the engineering run after validating the design.

L. Greiner5IPHC-LBNL Phone Conference 07/10/2012 STAR Power Regulator Test Cable Power regulator cable test layout is complete and the PCBs have been fabricated. These are not of a form factor that can be used on ladders, but are intended for testing only. These will be shipped to IPHC this week.

L. Greiner6IPHC-LBNL Phone Conference 07/10/2012 STAR Discussion Topics Ladder testing results. Any other suggested testing? Ultimate 2 submission schedule. Date for next phone conference. (perhaps after ladder testing is complete?) Testing of the regulator ladders.